Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on October 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SEAT

Awarded
N0010425QFA40Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332919
New
DIBBS
COUPLING HALF, QUICK
Solicitation # SPE7M3-27-T-0769
This solicitation, issued by the DLA Weapons Support Fluid Handling Division, is for the procurement of one quick coupling half, identified by NSN 4730-01-579-8245. The requirement specifies a delivery timeframe of 20 days after order, with an original required delivery date of May 31, 2024. The item is to be delivered FOB Origin to the Armament Inspectorate in Warszawa, Poland. The contract mandates strict adherence to technical and quality requirements found in the DLA Master List, specifically prohibiting the use of additive manufacturing unless authorized and restricting the intentional addition of mercury or mercury-containing compounds. Compliance requirements are extensive, including CMMC Level 2 Self-Assessment, safeguarding of covered defense information, and adherence to MIL-STD-129 for marking and MIL-STD-2073-1E for packaging. Inspection and acceptance are both set at the point of origin, with Certificate of Conformance procedures authorized under FAR 52.246-15. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with the Buy American Act and Balance of Payments Program for quotes exceeding the micro-purchase threshold. The solicitation is open to full and open competition, with specific price evaluation preferences noted for HUBZone small business concerns.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 2 hours ago

DEADLINE

in 11 days
NAICS: 332919
New
Federal
PARTS KIT,BALL VALV
Solicitation # N0010426QNE98
This solicitation, issued by NAVSUP Weapon Systems Support Mechanicsburg, is for the procurement of 175 ball valve parts kits (NSN 4820-01-425-4163). The material is designated as Special Emphasis Level I, meaning it is used in crucial shipboard systems where failure could result in serious personnel injury, loss of life, or loss of the vessel. Consequently, the contract mandates strict quality assurance, including a requirement for the contractor to maintain a quality system compliant with ISO-9001 or MIL-I-45208. The kits consist of a ball made from SAE-AMS-6931 and seats made from MD71-GG Mearthane, both requiring rigorous quantitative chemical and mechanical analysis. Key technical requirements include hydrostatic testing for each ball at 1875 PSI for 30 minutes, with dye penetrant inspection as an acceptable substitute for manufacturers lacking test fixtures. All welding and brazing must adhere to specific S9074 and 0900-LP standards, requiring prior approval of qualification data. The contractor must submit a Certificate of Compliance and all objective quality evidence via the Wide Area Workflow (WAWF) system to Portsmouth Naval Shipyard for review and acceptance before shipping. Final inspection follows a zero-defect acceptance policy, with sampling based on ANSI/ASQ-Z1.4. The government intends to make a single fixed-price award based on the most advantageous offer, prioritizing past performance over price. Packaging must comply with MIL-STD-2073-1, and all shipments must be prepaid to the destination. Offerors must provide a Quality Assurance Manual to be eligible for award and must certify that the materials are mercury-free. All configuration changes or deviations require formal review and approval by the Contracting Officer through Engineering Change Proposals or waiver requests.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
STEM,FLUID VALVE
Solicitation # N0010426QZB64
Solicitation N00104-26-Q-ZB64 is a fixed-price request for quotations from NAVSUP Weapon Systems Support for the manufacture of a Fluid Valve Stem (NSN 4820-01-496-3210). This item is designated as a Critical Safety Item and Special Emphasis Material Level I, as its failure could result in catastrophic loss of life or the ship. The government will provide the necessary barstock (NIIN 014959538X2) as Government Furnished Material, and the contractor must maintain strict heat traceability throughout production. The stem must be manufactured in accordance with NAVSEA drawing 803-5959307 and related specifications, using ASTM-B348 Grade 23 or SAE-AMS-4931 material. Weld repairs on titanium parts are strictly prohibited. The contract mandates rigorous quality assurance and certification standards, requiring a quality system compliant with ISO-9001 and specific calibration standards such as ISO-10012 or ANSI-Z540.3. Key requirements include dye penetrant inspection, a zero-defect lot acceptance policy, and the submission of a comprehensive Certificate of Compliance and test results via the Wide Area Workflow system prior to shipment. All deliverables must be preserved and marked according to MIL-STD-2073 and MIL-STD-129. Award will be made to the most advantageous offeror, with past performance weighted as more important than price.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in 14 days
NAICS: 332919
New
Federal
48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF
Solicitation # N0010427QZA04
This fixed-price contract, solicitation number N00104-27-Q-ZA04, is issued by the Navsup Weapon Systems Support Mech for the manufacture or refurbishment of hydraulic actuators. The scope of work requires the contractor to inspect, clean, and refurbish the items in accordance with Drawing 30093-40940 and MS NO. 5640-081-346 REV A CHG-4. Final delivery of the material must be completed within 86 days of the contract's effective date, with the ship-to destination located in Kittery, Maine. The award is designated as a DO rated order under the Defense Priorities and Allocations System, signifying its importance for national defense. Key requirements include physical identification per MIL-STD-130 and strict adherence to preservation, packaging, and marking standards such as MIL-STD-2073-1 and MIL-STD-129. If additive manufacturing is utilized, the contractor must provide comprehensive traceability data via DD1423 reporting. The contract includes a one-year warranty for supplies of a noncomplex nature and mandates the use of the Wide Area Workflow (WAWF) system for electronic invoicing and receiving reports. Evaluation for award is based on the Supplier Performance Risk System, assessing item, price, and supplier risk. All transportation to and from the repair site is paid for by the US Navy.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
STEM, VALVE
Solicitation # N0010426QNE90
This solicitation, issued by NAVSUP Weapon Systems Support Mechanicsburg, is for the procurement of a Valve Stem (NSN 1HM 4820-01-548-5698) to be delivered within 120 days. The item is designated as Special Emphasis material (Level I, Scope of Certification) because it is used in crucial shipboard systems where failure could result in catastrophic loss of life or vessel. Due to this criticality, the contract mandates strict quality controls, including a requirement for the contractor to maintain an ISO-9001 quality system and undergo Government Quality Assurance at source via the Defense Contract Management Agency. Technical requirements specify the use of ASTM-B150 Alloy C63200, mandatory oxygen cleaning per MIL-STD-1330, and a strict mercury-free composition. The award will be made to the offeror determined to be most advantageous to the Government, with past performance weighted as more important than price. Key deliverables include the hardware and comprehensive test certifications submitted via Wide Area Workflow (WAWF) to the Portsmouth Naval Shipyard for review and acceptance prior to shipment. Packaging must adhere to MIL-STD-2073 and MIL-STD-129 standards, with specific red labeling for Level 1 materials. The procurement is DO certified for national defense under the Defense Priorities and Allocations System and is conducted as a simplified acquisition.
Navsup Weapon Systems Support Mech

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 332919
New
Federal
VALVE,REGULATING,FL
Solicitation # SPRMM127QKA27
This fixed-price solicitation, issued by DLA Mechanicsburg under solicitation number SPRMM127QKA27, requires the manufacture and delivery of two regulating valves (VALVE,REGULATING,FL) based on the design represented by Cage Code 99643, reference number 84140-1. Award will be granted based on the Lowest Price Technically Acceptable (LPTA) criteria, with a 10 percent price evaluation preference applied to HUBZone small business concerns. Offerors must be authorized distributors of the original manufacturer and are prohibited from providing refurbished material. Technical drawings are not available for this item, and the contractor is responsible for ensuring the product meets all quality requirements, including physical identification per MIL-STD-130 and packaging according to MIL-STD-2073-1. The contract mandates the use of PIEE-WAWF for the electronic submission of invoices and receiving reports, and any requests for modifications must be processed through the Workflow Pro (WFP) Mod Assist module. Inspection and acceptance will occur at the origin. Key compliance requirements include CMMC Level 1 self-certification, adherence to the Buy American Act, and strict prohibitions relating to Chinese military companies. Contractors must maintain inspection records for 365 days following final delivery and are required to provide the Original Equipment Manufacturer's CAGE code and part number when submitting quotes.
SPRMM1 DLA Mechanicsburg

POSTED

about 7 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the procurement of 45 units of NSN 1H-4820-016337486-D0, TDP VER 001, to be delivered to Portsmouth Naval Shipyard in Kittery, Maine. The acquisition is exclusively set aside for small business concerns, with the specific type of small business set-aside to be determined during the solicitation process, which may include HUBZone, Service-Disabled Veteran-Owned, Women-Owned, or Minority Institutions, as per applicable FAR clauses. Interested vendors can access relevant military and federal specifications, standards, and other standardized documents through the DOD Single Stock Point or ASSIST-Online, with instructions provided for obtaining these documents either online or via mail or phone if internet access is unavailable. The solicitation, numbered N0010425QFA40, was posted on October 29, 2024, with a response deadline of November 27, 2024. It is a presolicitation notice issued under the Small Business Administration's total small business set-aside program, managed by the Department of Defense’s Naval Supply Systems Command Weapon Systems Support in Mechanicsburg, Pennsylvania. The primary point of contact is Tiana HammaKer, reachable via email or phone, and further details about the opportunity can be viewed on the SAM.gov portal through the provided link.

General Info

Procurement contract for critical shipboard materials emphasizing quality assurance and safety compliance.

Contract Value

$5,265

NAICS

332919 - Other Metal Valve and Pipe Fitting Manufacturing

Place of Performance

PA, USA

Set-Aside

NONE

Award Issued Date

Documents

1

N0010425QFA40.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Solicitation

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support Mech
Contacts1 person available
OfficeMECHANICSBURG, PA, 17050-0788, USA
Office AddressMECHANICSBURG, PA, 17050-0788, USA

Full Description

Show more
CONTACT INFORMATION|4|N743.35|WWV|N/A|contact@example.gov| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|SEE SPECIFICATIONS SECTION C AND SECTION E| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION (JUN 2002)|8|X||X|||||| GENERAL INFORMATION-FOB-DESTINATION|1|A| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|N00104|TBD|TBD|N50286|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|ONE YEAR|365 DAYS AFTER THE LAST DELIVERY UNDER THIS CONTRACT ||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|332919 |750|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1.DD1423 Data Item A001 (Inspection and Test Plan) may be waived if already on file at NAVSUP WSS Mechanicsburg. 2. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed here in. 3.The following proposed delivery schedule applies: Submission of all certification data CDRLS 20 days prior to delivery. PNSY review/acceptance of certification CDRLS 6 working days after receipt Final delivery of material (200 days) \ 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.1.1 DSSP Scope of Certification Material - Material Control Division ;(B); applies to this material. 1.1.2 This ;SEAT; contains non-metallic materials which must satisfy the toxicity and flammability requirements of NAVSEA SS800-AG-MAN-010/P-9290. Use of any material other than that specified requires special engineering approval and may require testing. 1.1.3 LI-SOC ITEM - It has been determined that this item falls within both the Level I boundary and the Scope of Certification (SOC) boundary. 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.2.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made. 2.2.3 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-STD-1330 | | |E |220516|A| | | DOCUMENT REF DATA=ASTM-D4894 | | | |190501|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A|1 | | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=SS800-AG-MAN-010/P-9290 | | |A |200324|A| |42| 3. REQUIREMENTS 3.1 ;Seats for size 1/4 inch Ball Valve to be in accordance with NAVSEA Drawing 5001003, Valve Piece Number 5001003-M111-04, except as amplified or modified herein.; 3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Seats; Material - Teflon (Polytetrafluoroethylene) per ASTM-D4894, Type II, Type IV Grade 1, Type IV Grade 2. (Properties Specified Below Only) ITEM PROPERTY ASTM TEST METHOD VALUE (A) Tensile Strength D638 4,000 PSI Min (Type II and Type IV Grade 2) 3,700 PSI Min (Type IV Grade 1) (B) Elongation D638 300% Min (Type II and Type IV Grade 2) 275% Min (Type IV Grade 1) (C) Melting Point D4591 327 deg C +/- 10 (620 deg F +/- 18) (D) Specific Gravity D792 (Method A) 2.14 - 2.19 (E) Hardness D2240 50-65 Shore D (F) Water Absorption (Max) D570 0.01% max (24 Hours) Properties (c) through (f) apply to Type II, Type IV Grade 1, and Type IV Grade 2. NOTE: The supplier is responsible for the performance of all inspection and testing requirements as specified herein, except as otherwise specified. 3.3 Oxygen Cleaning - This material must be cleaned, tested, packaged & labeled by trained personnel and procedures in accordance with MIL-STD-1330, General. 3.4 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension. 3.5 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.5.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. 3.6 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.7 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.7.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.7.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.7.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.7.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.8 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.9 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system 3.9.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.9.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.9.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement. 3.9.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.9.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption. 3.10 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected. 3.10.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.10.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.11 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Command (DCMC) Office. In the event that a local Government representative or DCMC Office cannot be located, our purchasing agent should be notified immediately." 3.11.1 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document. 3.11.2 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services specified in the purchase order or contract. 3.11.3 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the purchased product on the end item represented by this contract. 3.11.4 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must be established. Records of this effort must be available for review by the government. 3.11.5 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier. 3.12 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.12.1 Visual examination upon receipt to detect damage during transit. 3.12.2 Inspection for completeness and proper type. 3.12.3 Verification of material quality received. 3.12.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.12.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.12.6 Identification and protection from improper use or disposition. 3.12.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.12.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.12.9 Material returned to the contractor must be handled as GFM. 3.13 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3, Section C of this contract/purchase order. 3.13.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. The Contractor must develop written procedures that implement the material control requirements stated herein, and elsewhere in this contract/purchase order. 3.14 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or batch of non-metallic material, which must also be marked on the material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.14.1 Material Marking - Each seat must be permanently marked in accordance with MIL-STD-792, type I and as stated below, except for Teflon seats, which must only be tagged. Type IX marking may be substituted for type I, provided the minimum character size scribed by the marking tool must be approximately 3/32 inch high to insure legibility. Permanent marking is not permitted on Teflon seats. When permanent marking is required, it must be legible and must be located so as to not affect the form, fit, and function of the material. ;Seats to be marked on the outer cylindrical surface.; Seat marking requirements must maintain complete traceability to certification OQE. Seat marking must be either heat/lot or batch number, a vendor traceability number/code, or a combination thereof and must be unique to the material certification. 3.15 See CDRL DI-MISC-80678 (SEAT MATERIAL) - Material Certification - The Contractor must furnish the applicable test reports for each heat/lot/batch of seat material. Material certification test reports must include, in addition to the specification, the class, form, grade, type, process, and/or composition, as applicable, of the material supplied. 3.16 Material Handling - The written material control process must include the following: 3.16.1 All raw materials must have traceability markings (except as specified below). 3.16.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability. 3.16.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of batches or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.16.4 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability codes that are marked on the material and identified on the test reports. The certification data requirements herein must be invoked by the prime contractor on all subcontractors supplying Level I material. 3.16.5 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.17 Receiving Inspection - 3.17.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to another location. 3.17.2 Receiving Inspection must include as a minimum - Verification that the traceability number marked on the material agrees with that on the certification test reports. Verification that certification test reports are legible and complete. Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements. 3.18 Discrepancy Reporting - 3.18.1 Nonconforming products must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier supplier in accordance with established procedures. Nonconforming material records will be maintained and available for review by the government Quality Assurance Representative (QAR). 3.19 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.19.1 Sampling for certification must be on the basis of one set of test specimens from each heat/lot or batch. 3.20 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.20.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.21 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.21.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.21.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.22 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.22.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.22.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.22.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.23 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.23.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.24 See CDRL DI-NDTI-80603A - Cleaning - Prior to performing any cleaning, the applicable cleaning procedure must be submitted for review and approval. If the Contractor's cleaning procedure has previously been approved by NAVSEA for this or other contracts, a copy of the original approval letter must be submitted in lieu of the actual procedure. 3.24.1 When cleaning is performed by a subcontractor, the requirements for submission of all documentation required herein must be passed down to the subcontractor. 3.25 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The contract/purchase order number (i.e. N00104-11-P-FA12). 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 5. Cure date ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement for any Hull, Mechanical and Electrical (HM&E) testing required that include the name of the test and that it was performed satisfactorily. If no HM&E testing is required, the statement should read "Hull, Mechanical and Electrical (HM&E) testing N/A." 9. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements. 10. Contractor's or authorized personnel's signature. 3.25.1 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, S-5343934-3, or Dry Deck Shelter Specification S-5486639-1, the Certificate Of Compliance must also include the information below: 11. A notation that 32 root mean square (RMS) finishes are in accordance with the specifications and are free of imperfections. 12. Direct reading of O-ring surface diameters with specified standard. 3.25.2 For Self-Locking Hex Nuts procured to NASM 25027, the Certificate Of Compliance must also include the information below: 13. A statement to the effect that qualification testing in accordance with NASM 25027 Paragraph 3.2 is satisfactorily performed. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facil...

More opportunities from Department Of Defense → Navsup Weapon Systems Support Mech

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS