Seattle FOB ABAAS Upgrades and HUD/DOL Space Build-out (Bid-Build)

Awarded
EQ10PCPB1-21-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 16 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 16 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 16 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 16 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The General Services Administration requires construction services for the historic Seattle Federal Office Building to achieve Architectural Barriers Act Accessibility Standards (ABAAS) compliance and execute tenant improvements for the Department of Housing and Urban Development (HUD) and the Department of Labor (DOL). The project aims to reduce the agencies' footprints to meet OMB utilization targets, consolidating HUD into approximately 30,534 USF and relocating DOL from leased space into approximately 28,000 USF within the facility. Key scope elements include the installation of new restrooms on each floor, the construction of a lactation room, and general ABAAS upgrades to the building entrance and existing features. With an estimated construction budget of 13 million dollars, the project mandates a highly collaborative Integrated Project Delivery approach to minimize disruptions to ongoing federal operations. Because the building is listed on the National Register of Historic Places, all work must comply with the Secretary of the Interior's Guidelines for the Treatment of Historic Properties and be coordinated with the GSA Historic Preservation Office. A critical substantial completion date is set for August 15, 2023, to ensure DOL can vacate its leased location before the lease expires. The contractor is responsible for maintaining at least two means of egress at all times and adhering to GSA PBS P-100 standards and Davis-Bacon Act wage determinations.

General Info

Contract Value

$14,636,235.46

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Seattle, WA, 98104, USA

Set-Aside

NONE

Award Issued Date

Documents

22

Amendment 01 Exhibit 2.1 Price and Services Schedule Partially Occupied Facility

DOCX, High priority: read this firstamendment
High

Amendment 01 Exhibit 2 Price and Services Schedule Fully Occupied Facility 8.4.21

DOCX, High priority: read this firstamendment
High

Amendment 01 - Q and A for DOL Project

DOCX, High priority: read this firstamendment
High

Amendment 01 - Seattle FOB ABAAS Upgrade HUD-DOL TI Site Visit Attendance Sheet

DOCX, High priority: read this firstamendment
High

Amendment 01 to Solicitation - SF30 8.4.21

PDF, High priority: read this firstamendment
High

Amendment 02 - Q and A for DOL/HUD/ABAAS Project

DOCX, High priority: read this firstamendment
High

Amendment 02 to Solicitation EQ10PCPB1-21-0016 dated 07/02/2021

PDF, High priority: read this firstamendment
High

Amendment 03 - Q and A Document for DOL/HUD/ABAAS Project

DOCX, High priority: read this firstamendment
High

Amendment 03 to Solicitation EQ10PCPB1-21-0016

PDF, High priority: read this firstamendment
High

DBA General Decision WA20210011 Mod 4

PDF, High priority: read this firstwage-determination
High

Exhibit 0 - Controlled Unclassified Information (CUI) Document

DOCX, High priority: read this firstspecial-notice
High

Exhibit 6 - Offeror Representations and Certifications 7.2.21

DOCX, High priority: read this firstreps-and-certs
High

Exhibit 7 - Key Personnel Resume Format

DOCX, High priority: read this firstsow
High

Model Subcontracting Plan Template

PDF, High priority: read this firstmodel-subcontracting-plan
High

PBS Past Performance Questionnaire - Commercial Client

DOCX, High priority: read this firstpast-performance
High

Seattle FOB ABAAS Upgrade & HUD-DOL TI Construction Contract Agreement 7.2.2021

DOCX, High priority: read this firstcontract-document
High

Seattle FOB ABAAS Upgrades and DOL/HUD TI Space Build-out SOW

DOCX, High priority: read this firstsow
High

Solicitation 8.4.2021 - Seattle FOB ABAAS Upgrade & HUD-DOL TI Construction Contract

DOCX, High priority: read this firstrfp
High

Solicitation EQ 10 PCPB 1-21-0016 - Seattle FOB ABAAS Upgrade and HUD-DOL TI

PDF, High priority: read this firstsf1442
High

Amendment 01 Exhibit 2.2 DOL Agency USF and Cost Share Matrix

XLSX, Low priorityamendment-exhibit
Low

Exhibit 8 - Project Experience

PDF, Low prioritypast-performance
Low

GSA Affiliated Customer Accounts for Google Drive and Sites May 2014

DOCX, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from May 28, 2021 to Jun 4, 2021. The notice description changed.

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Aug 16, 2021 to Aug 31, 2021.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R10 Construction Acquisitions Branch
Contacts1 person available
OfficeTacoma, WA, 98401, USA
Office AddressTacoma, WA, 98401, USA

Full Description

Show more
Project Summary Project Name: ABAAS UPGRADES and DOL/HUD TI SPACE BUILD-OUT Project Number: EQ10PCPB1-21-0016 Region: NORTHWEST / ARCTIC [Region 10] Building Name: SEATTLE FEDERAL OFFICE BUILDING [WA0036ZZ] Building Address: 909 1st AVENUE, SEATTLE WA 98104 The United States General Services Administration requires construction services to enable the Housing & Urban Development (HUD) and the Department of Labor (DOL) agencies in Seattle to down-size and meet their OMB footprint utilization rate (UR) targets. This project also requires construction services to bring the Seattle Federal Office Building (FOB) into ABAAS (Architectural Barriers Act Accessibility Standards) compliance, in accordance with GSA policies and directives relative to Capital-Funded Repair and Alteration (R&A) projects. The Historic Seattle Federal Office Building (FOB) was constructed in 1931 - 1933 and was the first building in Seattle specifically designed for offices of the federal government. This building is listed on the National Register of Historic Places. All work and workers are required to comply with the Secretary of Interior's Guidelines for the Treatment of Historic Properties. The Contractor is required to coordinate all construction activities with the GSA Historic Preservation Office. The FOB is a Modern Art Deco architectural style with a distinct stepped massing and facades. Art Deco qualities of the design are enhanced by the cascading effect provided by light-colored terra cotta decoration applied as vertical fluting to the parapets atop the red brick-faced facades. The FOB has nine (9) floors as well as a partial basement level. It is a frame of concrete encased steel beams and columns and is supported on wood piles with concrete pile caps. The roof is multi-tiered, cascading down symmetrically from the 9-story central tower fronting 1st Ave to the two 5-story wings extending west along Madison St. and Marion St. Exterior walls are faced with masonry. Interior walls are constructed of hollow-clay and hollow terra cotta tile faced with plaster. The exterior is currently under renovation; specific areas of work are the exterior brick, granite, terra cotta and aluminum panel restoration; roof replacement; and window restoration. Expected completion of the exterior renovation is March 2022. Project Goals and Objectives: HUD is currently located in the (FOB) occupying 67,360 USF on the lower level, 1st-4th & 6th floors. The goal is for HUD to consolidate and occupy the entire 3rd floor, and part of the 4th floor, and therefore reduce HUD's space to ~30,534 USF. HUD will reduce space by 45% with future rent costs savings. DOL is currently located in the Seattle 5th and Yesler Building (leased space) occupying 74,832 USF. This project proposes to reduce DOL space to ~28,000 USF relocating the agency to the FOB Building, to occupy part of the lower level, part of the 1st floor, and all of the 2nd floor. The FOB is not ABAAS compliant. This project also includes bringing the FOB into ABAAS compliance, including the existing ABAAS entrance, and installation of new restrooms on each floor. A lactation room will also be constructed as part of this project. The overall goal is to utilize a highly collaborative Integrated Project Delivery (IPD) approach for this project (ABAAS Upgrades and DOL/HUD TI Space Build-out). Accordingly, the Contractor must work closely with all the stakeholders to deliver a project that: meets the expectations and needs of all stakeholders; avoids disruptions to the tenants ongoing operations and well-being; and satisfies GSA's requirements for a high performing building and tenant spaces. Care must be exercised when considering construction phasing and any potential project impact(s) to the means of egress and egress pathways from occupied space to the building exits. At no time during the project must there be less than (2) means of egress from any space to building exits. Space access and means of egress & egress pathways must be maintained throughout the project that satisfy ABAAS and GSA Fire, Life, Safety code requirements. This is of critical importance given the expectation that the project occurs within a fully occupied and functional Federal Office Building. The Contractor must work with GSA and the larger Project Delivery Team to ensure that the project: Complies with all project requirements, including (but not limited to) GSA PBS P-100 standards (Baseline, unless noted otherwise) ABAAS upgrades to the building Minimizes impact to tenants and public users Maintains an adequate, code compliant number and proper configuration of access and egress pathways throughout the facility, including within tenant spaces, during and after construction Maintains/upgrades the facility features impacted by project work to be ABAAS compliant The DOL/HUD TI Space Build-out project's Substantial Completion Date (SCD) is established as No-Later-Than (NLT) 15-Aug-2023, in order to permit DOL's subsequent full occupancy of their newly renovated/constructed space, and to vacate their existing leased location, prior to their existing lease expiration date. This SCD date for DOL's TI Space Build-out is a critical driving factor for the project's schedule.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS