Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on August 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Seattle-Tacoma International Airport South Concourse Evolution (SCE), Bid Package 2.1.01 - Building Concrete - New

Closed
MC-0321006_2.1.01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Cabot Tower Signal Mast Replacement, Signal Hill National Historic Site
Solicitation # 5P468-26-0234/A
Parks Canada Agency is soliciting bids for the removal and in-kind replacement of the 6m wooden signal mast and associated rooftop equipment repairs at the Cabot Tower, located within the Signal Hill National Historic Site in St. John's, Newfoundland and Labrador. The project requires the contractor to remove the existing mast, measure it, and install an identical replacement to ensure existing equipment can be reattached. All work must comply with the National Parks Act, the 2025 National Building Code of Canada, and provincial occupational health and safety laws. The project is scheduled to be completed no later than March 31, 2027, with work specifically timed for the off-season when the tower is closed to the public. The contract will be awarded based on a weighted evaluation consisting of 90 percent price and 10 percent for an Indigenous Participation Plan, which must include firm guarantees for Indigenous labor and business involvement. Bids must be submitted via email to [email hidden] or by fax to [phone hidden], with a final closing deadline of November 3, 2026. Submissions must be divided into two separate volumes for qualifications and pricing. Key operational requirements include maintaining a Health and Safety Plan on-site, providing security personnel after hours, and adhering to strict staging limitations due to the restricted space at the historic site.
Parks Canada Agency

POSTED

about 21 hours ago

DEADLINE

in 5 days
NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Hensel Phelps, acting as the General Contractor and Construction Manager, is seeking bids for the S Concourse Evolution project at Seattle-Tacoma International Airport. Specifically, Bid Package 2.1.01 focuses on new building concrete with an estimated budget range between 8 million and 10 million dollars. Interested qualified firms can access bid documents starting August 31, 2026, by emailing the designated Hensel Phelps contact. While not mandatory, a virtual pre-bid meeting and a site walk are highly encouraged for all potential bidders. Completed bids must be submitted to the Port of Seattle via email by 2:00 PM PDT on October 15, 2026. This is a Project Labor Agreement project requiring a bid bond upon submission and 100 percent payment and performance bonds for any subcontracts exceeding 100,000 dollars. Additionally, all subcontractors must provide a Workers Compensation Waiver of Subrogation and execute contracts using standard Hensel Phelps forms.

General Info

Hensel Phelps seeks $8-10M concrete bids for Sea-Tac airport by October 15, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Aviation Facilities & Infrastructure
Contacts1 person available
OfficeWA
Office AddressWA
Contacts

Full Description

Show more
Seattle-Tacoma International Airport S Concourse Evolution (SCE) Project Bid Package 2.1.01
Pursuant to RCW 39.10.380, Hensel Phelps as the General Contractor / Construction Manager (GC/CM) for the project is requesting Bids from qualified firms for Bid Package 2 of the S Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport.
Additional information on this bid package and upcoming bid opportunities is available from: https://app.buildingconnected.com/public/5bc50ee0c2890a001fbbce30/projects/69b0319400f8674c93726802
Bid Package 2.1 includes: Subsystem 2.1.01 – Building Concrete – New
Total Bid Items (evaluated total) Budget Range: $8 mil to $10 mil
Bid Documents are available August 31st, 2026. Email requests to access Bid Documents to contact@example.gov. An Invitation to Bid will be sent via Building Connected to those requesting access to the Bid Documents.
A non-mandatory but highly encouraged virtual pre-bid meeting (date, time and location to be determined and issued via Amendment) will be held for Bidders of Bid Package 2.1 in-person and via Teams. Refer to Instructions to Bidders for location and access via Teams.
A non-mandatory site walk will be conducted for Bidders of Bid Package 2.1 (date, time and location to be determined and issued via Amendment). Refer to Instructions to Bidders for location to meet, site walk limitations, requirements, pre-registration, and which Subsystems are to attend each of the site walks. Pursuant to RCW 39.10.390(2), Hensel Phelps, as the General Contractor/Construction Manager (GC/CM), hereby notifies the Port of Seattle and the public of its intent to submit a bid for Bid Package No. 2.1, Subsystem 2.1.01 - Building Concrete - New. The bid opening and receipt of bids will be managed by the Port of Seattle as indicated in RCW 39.10.390 (2)(b).
Bids are due no later than 2:00PM PDT October 15th, 2026. Submit bids the Port of Seattle via email at contact@example.gov via the bid form included in the Bid Documents document titled Instructions to Bidders.
Successful Bidder will be required to furnish 100% Payment and Performance Bonds for all subcontracts exceeding $100,000 on the Bond Forms provided with the Bid Documents. A Bid Bond is required to be submitted with the bid and on the forms provided with the Bid Documents. Subcontracts shall be executed on the Hensel Phelps standard subcontract forms, copies of which are included with the Bid Documents. This is a Project Labor Agreement (PLA) project. Workers’ Compensation Waiver of Subrogation will be required of all Subcontractors.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS