Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on May 16, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Seawall Replacement - Palm Harbor near Bella Harbor

Closed
2004353State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves the removal of an existing seawall and the construction of a new seawall measuring 30 linear feet near Bella Harbor in Palm Coast, Florida. The new seawall will feature a 10-foot return section and a concrete cap measuring 12 inches by 14 inches, reinforced with No. 5 rebar, and will include sleeved tie backs positioned every 10 feet along with deadmen for added stability. The project must adhere to the specifications outlined in the City of Palm Coast Technical Manual. The scope of work encompasses all necessary labor, materials, site cleanup, backfill, sod installation, preparation of drawings, and obtaining local permits. The project’s estimated value ranges from $30,000 to $60,000, with a response deadline of May 20, 2024. The solicitation is issued by the Palm Coast agency under NAICS code 237990, which covers other heavy and civil engineering construction.

General Info

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Palm Coast
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Palm Coast
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removal of existing and replacement of 30 lf of seawall. The new seawall shall include (1) 10' return, a 12"x14" concrete (5000 psi) cap w/ No. 5 rebar, sleeved tie backs @ 10'and deadmen and shall meet City of Palm Coast Technical Manual requirements .The quote shall include all labor, materials, clean-up ,backfill, sod, drawings and local permitting.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS