LETTING LOCATION: Contracts Administration Office
POSTING DATES: 12/17/2025 and 12/31/2025
CONTRACT DAYS: 1715
CONTRACT EXECUTION DAYS: 10
SPECIAL START DATE: N/A
ACQUIS./FLEXIBLE START TIME: 120 Days
The Improvements under this Contract consist of, but are
not limited to, MOT (standard, special detour, traffic
control officer, barrier, crash cushion, PCMS, barricade,
removable tape), protections (sediment, turbidity, soil
tracking), bridge replacement (removal of existing Bridge
No. 880005, construction of new Bridge No. 880007, deck
grooving and planning, expansion joint, bearing pads,
prestressed beam), reef establishment, earthwork
(excavation, embankment), reinforcing steel (retaining
wall, superstructure, substructure, approach slab),
reinforcing bars (fiber polymer), concrete (removal, steps,
seal, approach slab, superstructure, substructure, mass,
railing, parapet, barrier, shoulder barrier, coating,
gravity wall, curb, curb and gutter, end wall, sidewalk,
driveway, ditch pavement, bumper guards), piling (preformed
holes, splice, inspection, prestressed, steel, steel sheet,
polyethylene sheet, soldier wall, test piles, redrive),
retaining wall (permanent, temporary), asphalt (milling,
resurfacing, miscellaneous), fender system, navigation
lights (system, solar), aluminum (ped/bike rail, pole F&I,
pole remove), crash cushion, fence (standard, gate), riprap
(rubble), bedding stone, gabion (mattress), monitor
structures (inspection, settlement, vibration), drainage
(inlets, manholes, pipe culvert, pipe fill/plug, French
drain), conduit (trench, embedded), manatee grate, traffic
monitoring site (cabinet, modem, sensor, solar power, surge
suppressor), pavement markings (rumble strip, RPM,
thermoplastic, painted, keyhole bike lane, permanent tape),
signing (single-column, multi-column, sign strip), lighting
(bollards, conductors luminaire, luminaire and light pole
removal), box (pull/splice, junction), electric service
(overhead power, wire, disconnect, load center), and sod
along State Road A1A (Jimmy Buffett Memorial Highway) over
Sebastian Inlet, for 1.098 miles, in Sebastian Inlet State
Park, and in unincorporated portions of, Indian River
County and Brevard County. For projects in excess of $50
million, in addition to meeting all other qualification
requirements of Section 337.14, Florida Statutes, and Rule
Chapter 14-22, Florida Administrative Code, any Contractor
who is not prequalified and in good standing with the
Department as of January 1, 2019, must submit evidence
which demonstrates satisfactory completion of at least two
projects, each in excess of $15 million, for the Florida
Department of Transportation or for any other state
department of transportation. Acceptability of the evidence
related to the two projects is at the sole discretion of
the Department. THERE WILL BE A MANDATORY PRE-BID MEETING
FOR THIS PROJECT AT 10:30 AM EST ON TUESDAY, SEPTEMBER 23,
2025, AT THE FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT
4 RICK CHESSER AUDITORIUM, 3400 W COMMERCIAL BLVD, FT.
LAUDERDALE, FL 33309. IF YOU HAVE ANY QUESTIONS CONCERNING
THIS MATTER, PLEASE CONTACT MARGARET SIMPKINS AT (954)
777-4612. THIS PRE-BID MEETING IS MANDATORY BECAUSE OF THE
COMPLEXITY OF THE PROJECT. ONLY PLANS AND SPECIFICATIONS
WILL BE AVAILABLE PRIOR TO THE PRE-BID MEETING. THE
PROSPECTIVE BIDDER SHALL BE PREQUALIFIED ACCORDING TO THE
REQUIREMENTS OF FDOT RULE CHAPTER 14-22 AND SECTION 2-1 OF
THE STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION. PROPOSALS (BIDDING DOCUMENTS) WILL BE ISSUED
ONLY TO THE PROSPECTIVE BIDDERS WHO HAVE ATTENDED THE
PRE-BID MEETING AND MET THE QUALIFICATIONS FOR THIS
PROJECT. PROSPECTIVE BIDDERS ORDERING BID DOCUMENTS PRIOR
TO THE PRE-BID MEETING WILL BE GIVEN ACCESS TO DOWNLOAD THE
BID DOCUMENTS WITHIN 24 HOURS AFTER THE PRE-BID MEETING.
THOSE PROSPECTIVE BIDDERS ORDERING THE DOCUMENTS AFTER THE
PRE-BID MEETING WILL NEED TO CONTACT THE OFFICE ADVERTISING
THE PROJECT TO CONFIRM ATTENDANCE AND RECEIVE ACCESS TO
DOWNLOAD THE BID DOCUMENTS. PLEASE CONTACT THE OFFICE AT
LEAST TWO WORKING DAYS PRIOR TO THE DEADLINE FOR OBTAINING
BID DOCUMENTS TO ALLOW TIME FOR PROCESSING.