This Solicitation opportunity from Florida was posted on July 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
SEC New Diesel Fuel Tank
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the removal, cleaning, and replacement of a 20,000-gallon above-ground diesel fuel tank at an Orlando Utilities Commission facility in Florida. The scope begins with pumping out the existing fuel for use elsewhere, followed by cleaning and preparing the tank for transport in compliance with government regulations. A closure integrity evaluation will be conducted on the new tank, with a report submitted to the Florida Department of Environmental Protection. The old tank and associated equipment will be disposed of or scrapped at an approved facility. A new double-wall, horizontal cylindrical fuel tank made of carbon steel, compliant with UL 142 standards, will be procured, delivered, and installed, including all necessary electrical and plumbing connections, with piping from the tank to the existing pumps replaced as needed. The new tank will feature a ladder, catwalk, primer and polyurethane coating, and will utilize existing pumps, ensuring the system remains operational. The project is valued between $200,000 and $500,000, with a response deadline of August 13, 2024, and is managed by the Orlando Utilities Commission, with primary contact being Jose Rodriguez.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The new fuel tank must have a 20,000-gallon capacity, a double-wall design, be horizontal cylindrical on saddles, and UL 142 compliant. It should be made of carbon steel, include a ladder and catwalk, and have a coating of primer and polyurethane finish.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
