Secondary RAS SS Pumps and Valves Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Toledo DPU/Water Reclamation is seeking professional engineering services for the Secondary RAS SS Pumps and Valves Replacement project at the Water Reclamation Plant. The scope of work involves the final detailed design, bidding assistance for construction services, and limited construction management support to replace aging Return Activated Sludge pumps, suction isolation valves, and motor operators. The selected consultant will serve as the engineer of record, ensuring the design addresses constructability, safety, and the maintenance of continuous operations, with deliverables reviewed at the 60% and 90% design stages. This is a professional services agreement utilizing a direct labor times a factor method of payment. Proposals will be evaluated based on ten weighted criteria, including background experience, project understanding, fee, and DBE participation, with the award granted to the proposal achieving the highest cumulative point total. Submissions must be limited to 26 pages and include a detailed price proposal with a not-to-exceed figure. Required documentation includes a variety of city-specific forms, including a Living Wage Affidavit, EEO compliance certification, and a notarized child support affidavit. There is no specified set-aside status for this solicitation.
General Info
Place of Performance
Set-Aside
Documents
9Read all 9 documents
Due in 19 daysEvery page of every file, in your free workspace.
Read the documentsAI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
252 mandatory294 requirements in 11 areas
- Submission78 · 68 must001
The signatory for the Consultant warrants they have…
- Compliance65 · 61 must100
All claims, counterclaims, disputes and other matters between…
- Technical65 · 56 must165
The Consultant shall not use project data, software…
- 291 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 294 requirementsEverything you need to bid on this one
Open the full contract in your free workspace.
- 9 solicitation documentsRead every page
- AI contract breakdown13 sections, Uniform Contract Format
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Submission deadline
Organization & Contact Information
Full Description
Notes: City forms must be filled out and attached to the proposal: Project Paperwork (Acknowledgment and Acceptance of Conditions Contract Specifications; Primary and Subcontractor Certificates and Living Wage Contract Addendum); Professional Services Contract; Current Worker’s Compensation Certificate; If not previously provided, City Paperwork: Vendor Registration Form; Business Tax Registration Form; Child Support Affidavit, notarized; Vendor Utility. If this is your first bid with COT for 2026, the following will be required, Annual Paperwork: W-9; Insurance Certificate, naming the City of Toledo as an additional insurer – requirements available on the “Documents” Tab of PlanetBids; EEO Compliance; Debarment Certification; and Living Wage Affidavit.
The following items will be required prior to awarding the contract: Independent Contractor PERS forms; and additional Insurance as Required.
Bid Bond: 0.00%
Similar Contracts
Same NAICS industry code
More opportunities from Ohio → DPU/Water Reclamation Department of City of Toledo
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
