Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Design and Engineering for Davis Lake Road MP 1.67 Slide Repair Project

Active
CMP 2653State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Lewis County Public Works Roads is soliciting statements of qualifications for the Davis Lake Road MP 1.67 Slide Repair Project under solicitation number CMP 2653. The selected consultant will enter into a Negotiated Hourly Consultant Agreement based on WSDOT Local Agency Guidelines to provide geotechnical analysis and structural design for a permanent roadway slide repair. The scope of work includes conducting site investigations with at least two drilled borings, producing a written geotechnical report, and developing conceptual plans and cost estimates for three repair alternatives. The consultant will then develop the county's selected option into 100 percent plans, specifications, and estimates for construction advertisement. All designs must adhere to current regulations, permitting requirements, and specific standards for boring backfill and cultural resource surveys. The project is expected to last approximately eighteen months, with the county retaining the option to extend the agreement. Proposals are due by November 13, 2026, and will be evaluated on a points-based system focusing on the ability to meet schedules, a voluntary small business enterprise approach, and an overall evaluation by the selection team. The top three ranking firms will be invited for interviews. Required submittals include a one-page cover letter, evidence of competence with FHWA funded projects, an organizational chart, and resumes for key personnel. The primary point of contact for this effort is Senior Engineer Rod Lakey.

General Info

Solicitation for geotechnical analysis and structural design for Davis Lake Road repair.

Place of Performance

WA, USA

Set-Aside

NONE

Documents

2

Design and Engineering for Davis Lake Road MP 1.67 Slide Repair Project (CMP 2653)

PDF, High priority: read this first9 pages · rfq
High

Lewis County RFQ - Davis Lake Road MP 1.67 Slide Repair Project

PDF, High priority: read this first6 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Public Works- Roads
Contacts2 people available
OfficeChehalis, WA, 98532, USA
Office AddressChehalis, WA, 98532, USA
Contacts
Public Works Contract Team PW ContractsContract Administrator

Interested Companies (10)

Loowit Consulting GroupCastle Rock, WA
KGS Group InternationalBellevue, WA
Sage GeotechnicalTumwater, WA

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The work to be performed by the CONSULTANT consists of providing a geotechnical analysis with on-site drilling, development of conceptual plans with cost estimates for three alternative repair options, and development of the selected repair option through 100% plans, specifications and estimate for construction advertisement. Project designs must meet all permitting requirements and utilize the most recent design guidance, standards, and regulations. A detailed outline of the type of work necessary for the anticipated project is provided in the below Scope of Work. This project will include cooperative project development and management with the COUNTY. At this time, the tasks provided are general and are subject to change if deemed necessary during discussions between the CONSULTANT and the COUNTY.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
International
Fire Hydrant Flow Testing and Hydraulic Modelling Services
Solicitation # WS-RFP-26-077
The Town of Whitchurch-Stouffville is soliciting bid proposals under solicitation number WS-RFP-26-077 for Fire Hydrant Flow Testing and Hydraulic Modelling Services. The project involves a multi-year engagement focused on annual flow monitoring and hydrant testing across Stouffville, Ballantrae, and Gormley. Key technical requirements include the installation and rotation of six continuous pressure monitors, quarterly data analysis and quality assurance from years one through five, and the final removal of equipment in year five. All field testing must adhere to the AWWA M17 manual, and any work performed on rights-of-way must comply with the Ministry of Transportation Book 7 of the Ontario Traffic Manual. The contract will be awarded to the proponent achieving the highest total score, with the lowest bid price receiving full points for the pricing component. Qualified proponents must be legally operating in Ontario and provide a project team led by a dedicated Project Manager, with all work performed by Ontario licensed trade personnel. Mandatory insurance requirements include a minimum of 2 million dollars for both automobile and professional liability coverage, with the latter remaining in force for 24 months post-completion. Payments will be processed via Electronic Funds Transfer within 28 days of approved invoice receipt. Proposals must be submitted electronically through the Bids and Tenders portal by November 2, 2026, at 3:00 p.m. local time.
Town of Whitchurch-Stouffville

POSTED

about 12 hours ago

DEADLINE

in 25 days
View Details
NAICS: 541330
New
SLED
Professional Engineering Services Lincoln Street Complete Streets Project
Solicitation # 26-09-02
The City of Oroville Public Works Department is soliciting proposals for professional engineering services for the Lincoln Street Complete Streets Project in Oroville, California. The scope of work requires a full-service team to manage the Project Approval and Environmental Document phase, Right-of-Way acquisition, Plans, Specifications and Estimates, and provide support during bidding and construction. Key technical requirements include civil and traffic engineering, environmental services, landscape architecture, topographic and boundary surveys, and modern roundabout design. The project must maintain Federal-Aid compliance, with Right-of-Way services adhering to Caltrans LAPM Chapter 13 and utility coordination following Caltrans guidelines. The City has currently secured 1.5 million dollars in Congestion Mitigation and Air Quality funds to initiate the first phase. Qualified proposers must have at least ten years of experience providing similar services in northern California and a proven track record with local agencies. Key discipline leads must hold appropriate professional licenses, and the firm must be registered with the Department of Industrial Relations. Proposals are due by 4:00 PM PDT on October 29, 2026, and must include three spiral-bound hard copies and one PDF copy on a USB drive. Award selection is based on a weighted scoring system, with the City negotiating with the highest-ranked qualified consultant. Successful contractors will be required to provide monthly progress reports and detailed invoices tracking tasks, contract balances, and reimbursable expenses. The target date for contract execution is December 1, 2026.
City of Oroville Public Works Department

POSTED

about 13 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
SLED
Construction Management, Inspections, And Materials Testing For Tuolumne Boulevard Pavement Rehabilitation
Solicitation # 2026-01
The City of Modesto is soliciting proposals under RFP/RFQ 2026-01 for construction management, inspections, and materials testing services for the Tuolumne Boulevard Pavement Rehabilitation project in Modesto, California. The selected consultant will be responsible for full-service construction coordination, site inspection, time-lapse camera services, and the oversight of ADA-compliant curb installation. A critical requirement is that the materials tester provided by the consultant must be independent and cannot be the same entity used for the contractor's quality control testing. The anticipated project timeline includes opening bids on October 20, 2026, with a construction contract award in December 2026 and a notice to proceed in January 2026. Proposals must be submitted via the OpenGov Procurement portal by October 20, 2026, at 11:00 am. Submissions must be split into a main technical proposal and a separate cost file, as the City will only open pricing after evaluating qualifications to negotiate with the top-ranking firm. Evaluation is based on a points-based system, with priority given to qualified local firms. The top three firms may be invited for interviews. Awarded consultants must maintain minimum insurance coverage of $1,000,000 for commercial general liability, automobile liability, and employer's liability, and must adhere to California Labor Code prevailing wage requirements for public works. Administration involves monthly detailed invoicing, with the City Manager authorized to approve additional services up to 10% of the maximum compensation.
City of Modesto

POSTED

about 13 hours ago

DEADLINE

in 12 days
View Details
NAICS: 541330
New
SLED
LIFT STATION 47 REDUNDANT FORCE MAIN CONSTRUCTION ADMINISTRATION & INSPECTION SERVICES
Solicitation # WS90501000
The City of Phoenix, through the Office of the City Engineer, is seeking a qualified consultant team to provide construction administration and inspection services for the Lift Station 47 Redundant Force Main project. The scope of work involves the construction of a new 12-inch high density polyethylene redundant force main approximately 9,480 linear feet in length, extending from the lift station at 4102 West 113th Drive to 99th Avenue and Indian School Road. Key responsibilities include the reconfiguration of the lift station discharge header, coordination of utility relocations, documentation review of assessment reports and CCTV recordings, and performing field inspections to ensure work conforms to construction documents. The consultant must maintain pipe fusion records, evaluate quality control testing, and prepare a final punch list of corrective work. Selection will be conducted via a qualifications-based process where a Selection Panel evaluates Statements of Qualifications (SOQ) without formal interviews. The evaluation is based on a 1,000-point scale for the SOQ, with additional points awarded through reference checks. Interested firms must be registered in the City's Vendor Management System and submit a single PDF SOQ of no more than 10 pages by 12:00 pm Phoenix time on October 30, 2026. Technical requirements include the potential use of the UNIFIER project management database and the maintenance of all project records in electronic format. While the estimated construction cost for the project is 7.9 million dollars, the specific value for the administration and inspection services is not provided.
Design and Construction Procurement

POSTED

about 13 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Washington → Public Works- Roads

Same awarding agency

NAICS: 237310
SLED
2023 County Safety Program
Solicitation # CRP 2205
The 2023 County Safety Program (Project CRP 2205, Federal Aid Project No. HSIP-000S(675)) is a solicitation by Lewis County Public Works for safety improvements along Centralia Alpha Road from MP 2.31 to 17.49 near Chehalis, Washington. The scope of work includes site preparation, vegetation clearing, the removal of approximately 284 linear feet of barbed wire fence, slope flattening, shoulder widening, and the installation or replacement of guardrails. The project is governed by the 2026 WSDOT and APWA Standard Specifications for Road, Bridge and Municipal Construction, with an engineer's estimate valued between 1.75 and 1.95 million dollars. The period of performance is scheduled from May 1, 2026, to March 17, 2027. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, October 15, 2026. Proposals must include a bid deposit equal to 5 percent of the bid amount, a non-collusion declaration, and a wage law compliance certification to be considered responsive. The contract will be awarded to the lowest responsible and responsive bidder. Successful contractors must provide payment and performance bonds, adhere to Washington State Prevailing Wage Rates, and comply with Buy America material standards and federal non-discrimination laws, including Title VI of the Civil Rights Act of 1964. Progress payments will be based on monthly estimates prepared by the Engineer, with materials on hand paid at 100 percent of invoiced cost.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS