Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on April 26, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sector Delbay gate opener install

Awarded
HSCG4217QCV715Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation is soliciting bids for a fee-for-service subcontract to provide panic hardware installation services for electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The project requires the contractor to bypass internal lock mechanisms and install Grade I commercial-grade panic bars, exterior trim, rim cylinders, strikes, and door closers at five specific locations: the Cafeteria, Men's Dorm, Women's Dorm, Recreation, and Vocational buildings. All installations must ensure doors open in the direction of exit travel under simple pressure and must comply with NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and the Americans with Disabilities Act. Performance verification requires a minimum of 10 consecutive cycle tests to ensure fail-safe operation. Eligible bidders must be licensed in the State of Idaho and provide a lump sum price for the project. This is a small business set-aside opportunity open to various SBA certifications, including VOSB, SDVOSB, WOSB, and HUBZone. Required submission documents include a bid sheet, a completed supplier packet with a W-9 and self-certification form, and three references, all due by December 1, 2026. The contract is subject to federal regulations, including the Davis-Bacon Act for prevailing wages, FAR clauses regarding the combating of trafficking in persons, and strict security requirements for protecting sensitive government information. Final award will be based on the best value as determined by MTC.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
Federal
Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services
Solicitation # FA446027Q0005
Solicitation FA446027Q0005 is a non-personal services contract for the comprehensive management, maintenance, repair, and inspection of real property vertical transportation equipment (VTE) at Little Rock Air Force Base, Arkansas. The scope of work covers freight and passenger elevators, escalators, and potentially wheelchair lifts, dock levelers, and dumbwaiters. The contractor is required to maintain a VTE availability rate of 95 percent and adhere to strict response times, including in-person arrival for emergency calls within two hours and commencement of routine work within 24 hours. All services must comply with ASME A17.1, ANSI/ASME A17.2, and other applicable safety and fire protection standards. A written Maintenance Control Program must be delivered within 30 calendar days of the award. This is a total small business set-aside under NAICS code 238290. The government will award the contract to the responsible offeror based on a lowest-price technically acceptable sequence, where the lowest-priced offer is selected if they possess an acceptable past performance rating, defined as at least two years of similar experience within the last four years. Proposals are due by November 18, 2026, and must be submitted via email to the designated points of contact. Payment and invoicing will be processed through Wide Area WorkFlow (WAWF) by the 10th of each month. Access to the base requires a valid REAL ID, and a single site visit is scheduled for October 26, 2026, requiring an RSVP by October 22, 2026.
FA4460 19 Cons Pka

POSTED

about 15 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
N099--JLM Roll Up Door Replacement
Solicitation # 36C25627Q0092
Solicitation 36C25627Q0092 is a combined synopsis and request for quote issued by the Department of Veterans Affairs for the replacement of a motorized roll-up door at the John L. McClellan Veterans Hospital. This is a 100% set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238290. The project requires the contractor to provide all labor, tools, and equipment, including a scissor lift and forklift, to remove and dispose of the existing door and install one grey 7 by 9 foot motorized rolling steel rapid slat door with insulated slats and an obstruction safety device. The award will be a firm-fixed-price contract with a performance period of 30 days from the Notice to Proceed and includes a one-year warranty. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation process, focusing on technical capability, price reasonableness, and the completion of the VA Notice of Limitations on Subcontracting. Interested offerors must submit a three-volume quote package consisting of technical capabilities, a completed price schedule, and the required VAAR certification. Quotes must be emailed to Joseph Warren by 3:00 PM CST on November 18, 2026. A site visit is scheduled for November 6, 2026, at 10:00 AM, and all inquiries must be submitted by November 10, 2026. Performance will take place at the Central Arkansas Veterans Healthcare System in North Little Rock, Arkansas, and contractors must comply with all OSHA, ANSI, CAN, and UL standards.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 15 hours ago

DEADLINE

in 20 days
NAICS: 238290
New
Federal
J039--561A4-25-500 Elevator Repair Building 6 and 53
Solicitation # 36C24226R0097
Solicitation 36C24226R0097 is a Request for Proposal issued by the Department of Veterans Affairs for the emergency upgrade and modernization of four elevators at the VA New Jersey Healthcare System Lyons Campus, specifically targeting one passenger elevator in Building 6 and one service and two passenger elevators in Building 53. The scope of work requires the contractor to provide all labor, materials, and supervision to install non-proprietary microprocessor-based control systems, new geared machines, car operating panels with braille markings, hall fixtures at ADA compliant heights, and complete shaft wiring. All work must adhere to current safety codes, including fire recall features and door lock monitoring, and comply with the Davis-Bacon Act for prevailing wage rates. This procurement is a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 238290. To be eligible, the prime contractor must be a licensed elevator maintenance company with a full-time mechanic on staff and a clean safety record, certifying no more than three serious, one repeat, or one willful OSHA or EPA violation in the last three years. Proposals are evaluated based on technical capability, past performance, and price, with a requirement to submit a current Experience Modification Rate (EMR) and certifications for the Buy American Act and limitations on subcontracting. Following several extensions to accommodate requests for information, the final deadline for proposal submission is 1:00 PM on Thursday, October 29, 2026.
242-NETWORK Contract Office 02 (36C242)

POSTED

about 15 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract requires the provision of all labor, materials, and equipment to replace the gate motor on the north gate located at 1 Washington Ave, Philadelphia, PA. The scope of work includes the removal and disposal of the existing gate operator, loop detectors, Miller edges, and receiver, followed by the installation of a Hy-Security Slide Driver 15-M UPS gate operator or equivalent. The installation must include two loop detectors, one Miller edge, one receiver, thru beam photo beams, and two Linear keypads compatible with the existing Lenel System. To prevent flood damage, equipment must be installed three feet above grade, and the contractor is responsible for all new wiring and ensuring the gate closes completely to prevent unauthorized entry. The project must be completed within 65 days after the award, with work commencing no later than 20 days after the notice to proceed. The contractor is responsible for obtaining all necessary permits and adhering to strict safety and environmental regulations, including OSHA and EPA standards. Personnel and vehicle identification must be submitted five days prior to starting work. All work must be supervised by experienced personnel and is subject to inspection and acceptance by the designated Quality Assurance Evaluator and the Contracting Officer.

General Info

Contract Value

$0

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

Washington Ave. Philadelphia, PA 19147, Phila, PA, 19147, USA

Set-Aside

NONE

Award Issued Date

Documents

5

RFI.doc

DOC

RFQ_Solicitation_SDB_Gate.doc

DOC

SOW_DELBAY_NORTH_GATE_MOTOR.doc

DOC

SOW_DELBAY_NORTH_GATE_MOTOR.doc

DOC

Wages.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Tracen Cape MAY(00042)
Contacts1 person available
OfficeCAPE MAY, NJ, 08204, USA
Office AddressCAPE MAY, NJ, 08204, USA
Contacts

Full Description

Show more
11Apr2017: Changes completion timeframe to 65 days after award. SCOPE OF WORK HSCG4217QCV715 1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment as required to replace gate motor on north gate located at 1 Washington Ave. Philadelphia, PA 19147 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the Contractor shall commence work NLT twenty (20) days after notice to proceed and work diligently to complete the entire work ready for use by thirty five (35) working days after contract award. 3. SCOPE OF WORK: 1. Remove and dispose of existing gate operator, loop detectors, Miller edges, and receiver. Dispose of demolished materials at an approved site. 2. Provide and install a Hy-Security Slide Driver 15-M UPS gate operator (or equivalent) with (2) loop detectors, (1) Miller edge (or equivalent), (1) receiver, (1) set of thru beam photo beams, and (2) Linear keypad (or equivalent) in accordance with manufacturer installation procedures to the existing footings and posts. Keypads must be compatible with current Lenel System on site. 3. Provide all new wiring and connections to new gate operator. Utilize existing line in AC service once deemed safe for use by a certified installation technician. Current power supply is 208 Volts, on a 20 Amp breaker. 4. Install equipment 3 feet above grade to mitigate chance of flood damage. 5. Ensure gate closes completely to prevent unauthorized entry. 6. Set up new equipment and test all safety functions and operation in accordance with manufacturer installation instructions. 4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with DCC Spencer Wilson. 5. DESIGNATED CONTRACTING OFFICER'S QA EVALUATOR (QAE) REPRESENTATIVE: The designated Contracting Officer's QAE representative and Point of Contact for this project is DCC Spencer Wilson @ +1 (555) 000-0000. Inquiries concerning any phase of the specification before or after award shall be made to CWO3 Louis Bevilacqua @ +1 (555) 000-0000. 6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specifications or related documents. 7. AFTER AWARD OF THE CONTRACT: The Contractor must immediately notify the Contracting Officer's QAE representative of his intended start date. The work shall be done in accordance with the specification. 7.1. The Contractor shall consider items in BOLD as having mandatory due dates. Items in italics are deliverables or events that must be reviewed and/or approved by the QAE prior to proceeding to next deliverable or event in this SOW. See SOW 8. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract. 9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer. 10. PERMITS: The Contractor shall without additional expense to the Government, obtain all appointments, licenses, and permits required for the prosecution of the work. The Contractor shall comply with all applicable Federal, State and local laws. 11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner. 12. WORK OUTSIDE REGULAR HOURS: If the Contractor desires to carry on work on Saturday, Sunday, holidays, or outside the unit's regular hours, must submit their request in writing to the Contracting Officer's QAE Representative for approval consideration. The Contractor shall allow ample time to enable satisfactory arrangements to be made by the Government for inspecting the work in progress. 13. UPON COMPLETION OF WORK: Contact the Contracting Officer's QAE Representative and CWO3 Bevilacqua to arrange for inspection/acceptance of work. 14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The Contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee's full name, date and place of birth, current address, and last four (4) of SSN. The Sector Delaware Bay Security Officer, David Pilitowski will be given a copy of the employee list and grant access for entry. Each Contractor provided vehicle or towed trailer shall show the Contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on Government property shall be maintained in a good state of repair. 15. SAFETY REQUIREMENTS: 1. Responsibilities: a. All Contractors working on CG Sector Delaware Bay shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Safety Officer prior to starting work. b. Written notification must be provided to the Sector Delaware Bay Safety Officer, DCC Spencer Wilson in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that change or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: A fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, or blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Safety Officer. c. Copies of the following must be provided to the Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work. d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a Contractor on Sector Delaware Bay. A Facilities Division representative is required for all Contractor Lock Out/Tag Out needs and shall be coordinated by the Safety Officer listed above. 2. Rights: a. Every employee working on Sector Delaware Bay has the right to a safe and healthy work place. The Contractor has the responsibility and right to stop unsafe work. QAE's and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations. 16. ENVIRONMENTAL PROTECTION REQUIREMENTS: a. All Contractors working on Sector Delaware Bay shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR(series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist DCC Spencer Wilson, prior to starting work and must be in accordance with the Unit Environmental Guide. b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation at Sector Delaware Bay. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment. c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent. d. Hazardous materials used by a Contractor are required to be disposed of by that Contractor. Disposal must be in accordance with federal, state, and local guidelines. 11April2017: Change completion timeframe to 65 days after award.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS