Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 9, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SEDIMENT REMOVAL FROM THE WATER TREATMENT PLANT SETTLING POND

Awarded
FA5004-20-P-0083Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, and OSHA regulations, with Indiana state laws prevailing if they are more stringent. Key deliverables include the provision of a Certified Industrial Hygienist, a detailed mold remediation plan featuring HEPA filtration and negative air pressure, and a one-year workmanship guarantee. The contract is awarded on a best-value basis, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal with a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Mandatory requirements include attendance at the site pre-bid walk-through and the provision of specific insurance coverages, including automobile liability and workers compensation. Performance must begin within 14 days of the Notice to Proceed, and the contractor must adhere to Davis Bacon Act wage determinations. Payment terms are Net 30.
Atterbury Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

This contract, solicitation FA5004-20-P-0083, tasks a contractor with the removal of approximately 800 cubic yards of sediment from the Water Treatment Plant settling pond at Eielson Air Force Base, Alaska. The project requires the use of a suction dredge and a sludge press to ensure all removed material is de-watered to meet the Paint Filter Liquids Test standards for no free liquids. The contractor is responsible for providing all labor, equipment, and materials to load, transport, and dispose of the sediment at the base's permitted landfill in the Quarry Hills area. Work must be performed without interfering with the plant's normal operations or violating wastewater discharge permits, and all activities must remain within the fenced water plant area to avoid contaminated soil. The government will handle administrative tasks related to the ADEC permit, including sludge sampling and analysis. The contractor must adhere to strict security protocols, including providing employee identification and maintaining a current personnel list. Environmental protections are emphasized, requiring the use of ground matting to protect vegetation and positive sealing devices on transport vehicles to prevent spillage. This 8(a) sole source acquisition, estimated at 675,000 dollars with a 60-day period of performance, requires the contractor to restore any damaged grass or dirt areas to their original state upon completion.

General Info

Contract Value

$716,126

NAICS

562910 - Remediation Services

Place of Performance

Eielson AFB, AK, 99702, USA

Set-Aside

8A

Award Issued Date

Documents

1

8(a) Sole Source Requirement Letter - Chemtrack Alaska, Inc.

PDF, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5004 354 Cons Pk
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-2200, USA
Office AddressEIELSON AFB, AK, 99702-2200, USA
Contacts

Full Description

Show more
Performance Work Statement Sediment Removal from the WTP Settling Pond Eielson AFB Alaska SECTION 1 Description of Services The Eielson AFB Water Treatment Plant uses six manganese oxide coated pressurized sand filters to remove the iron and manganese out of the bases drinking water. When the filters are backwashed, the backwash water is sent to a settling pond where the suspended matter settles out of the water. Over the years of backwashing the filters, there has been an accumulation of sediment in the settling pond which has reduced the depth to about 80% of its original capacity. The dimension of the pond is roughly 210 feet by 68 feet by 5 feet and has a capacity of approximately 306,000 gallons of water. The estimated amount of sediment accumulation is approximately two to three feet in the bottom of the settling pond, approximately 188,500 gallons, 800 cu. yards. The sediment is high in water content and must be de-watered to meet the requirement for no free liquids as determined by the "Paint Filter Liquids Test". The personnel at the Water Treatment Plant will collect a composite sample of the sediment and have it tested in accordance with the Toxicity Characteristic Leaching Procedure, test method 1311 as mentioned in 40 CFR 261.24 to ensure that the sediment is within the parameters for disposal. 1. SCOPE: Contractor shall provide all equipment, personnel, labor, and materials needed to perform sediment removal by using a suction dredge and use of a sludge press to obtain solids with no free liquid content as determined by the "Paint Filter Liquids Test". The Contractor shall also provide all equipment, personnel, labor, and materials needed to, load, transport and dispose of the sediment into Eielson's permitted land fill in the Quarry Hills area. The Contractor shall perform this work according to the following performance standards. 1.1. The settling pond has a gravel bottom; in the process of removing sediment the contractor shall disturb as little gravel as possible. 1.2. Removal of sediment should not interfere with the normal operation of the Water Treatment Plant. The plant will need to remain online during the operation and will need to have the ability to send backwash water to the settling pond for treatment. The contractor shall coordinate with Mr. Carter the WTP Supervisor at 907-377- 1449 or Mr. Hollowell, Water Systems Superintendent at +1 (555) 000-0000 as how this is to be accomplished. 1.3. During the course of work, the contractor should not interfere with the normal water flow of the settling pond or cause a situation that would lead to the water treatment plant violating their Wastewater Discharge Permit (#AKG380017), or any (ADEC) Alaska Department of Environmental Conservation or Air Force regulation. Run off or decanted water: Any and all water that comes out of the pond must go back into the pond. All work shall be done inside of water plant fenced in area; the area outside of the fence is a contaminated area. There shall be no work done on contaminated soil, and no equipment or vehicles parked on contaminated soil. Government will designate the area and mark the boundaries. Access to the site using the 'side gate' near the Garrison Slough pond outfall. Ground matting will be required to protect the grass and vegetation along the access route, from the paved road to the access gate. Small footprint is required. Any damage to the grass will be repaired by the contractor. 1.4. Transport dewatered sediment to the disposal site in vehicles or containers fitted with positive sealing devices. At a minimum, fit tailgates with a rubber seal, use additional tailgate locks, and cover the load with a securely fastened tarp. 1.5. Sediment disposal shall occur only within the designated disposal areas. Government will designate the area and mark the boundaries to ensure that the disposal area is within the location of one of the bases state permitted land fill in the Quarry Hill areas. 1.6. Clean accumulated sediment from transport trucks or vehicles within the confines of the disposal area immediately after depositing loads to prevent spillage and drag-out onto roadways. 1.7. Clean up area where the sediment was removed to ensure that no material is left behind and restore any grass or dirt areas that were damaged during the sediment removal process to their original state. SECTION 2 Government Special Instructions, Terms and Conditions 2. GOVERNMENT FURNISHED EQUIPMENT/PROPERTY: The Government will not furnish any facilities nor equipment for any work that needs to be accomplished in this Performance Work Statement. The contractor shall furnish all equipment and supplies needed to perform this contract according to all its terms. 2.1. HAZARDOUS MATERIALS: The Contractor shall comply with base regulations regarding Hazardous Material (HAZMAT) for all issues of hazardous material, and ensure procedures meet all applicable policies, publications, and protocols in this contract. Provide Bio-Environmental Engineer Service with a Material Safety Data Sheet (MSDS) on all first time purchases of hazardous items obtained through local sources of supply and obtain approval prior to purchase. 2.2. Government will perform administrative tasks required under the ADEC permit including notification to the state, sampling and analysis of sludge. 2.3. EMERGENCY MEDICAL SERVICE: The government will provide emergency medical treatment and emergency patient transportation service for contractor personnel who are injured or become critically ill while at Eielson AFB. Treated personnel will be responsible for reimbursing the government for the cost of medical treatment and patient transportation at the current inpatient or outpatient treatment rate. 2.4. GOVERNMENT REMEDIES. The contracting officer shall follow the requirements of FAR 52.212-4, Contract Terms and Conditions for Commercial Items (Feb 2007), for contractor's failure to correct nonconforming services and 52.233-2 Protection of Government Building, Equipment and Vegetation & (APR 1984). 2.4.1. The Contractor shall use reasonable care to avoid damaging existing building, equipment and vegetation on Government installation. If the Contractor's failure to use reasonable care and cause damage to any this property, the contractor's shall replace or repair the damage at no expense to the government as the contracting officer directs. If the contractor fails or refuses to make such repair or replacement, the contractor shall be liable for cost, which may be deducted from the contract price. 2.4.2. HOURS OF OPERATION. Services shall typically be performed Monday thru Friday from 7:00 am to 5:00pm local time unless a different time has been coordinated with the Government. 2.5. SECURITY REQUIREMENTS. The contractor shall ensure each employee obtains pass and identification items as applicable for contractor personnel and contractor-owned vehicles. The Security Forces Pass and Identification office located at 2677 Wabash Ave (Bldg. 3125) issues these forms. The contractor will be escorted if he or she enters the main water plant facility. 2.5.1. The contractor shall maintain a current listing of employees. The list will include employee names and date of birth. This list shall be provided to the contracting officer and servicing security forces organization. An updated listing shall be provided upon change of employees. The Contractor must provide all names, social security numbers and duty hours of all personnel who will be on site at start or anytime during this project. 2.6. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER. During times of crisis or national emergency, the contractor shall continue to provide services as scheduled, with minimal disruption of services if directed by a contracting officer.

More opportunities from Department Of Defense → FA5004 354 Cons Pk

Same awarding agency

NAICS: 811310
Federal
Central Heat and Power Plant (CHPP) Boiler Maintenance and Repair Services
Solicitation # FA500427
The Department of the Air Force, specifically the 354th Fighter Wing at Eielson Air Force Base, Alaska, is conducting market research through a Sources Sought notice to identify qualified contractors for on-call, critical emergency and scheduled maintenance and repair services for the Central Heat and Power Plant. The scope of work involves six coal-fired high-pressure power boilers, consisting of four Springfield Boiler Co. Model 1951 and two Indeck Keystone Energy Model 2013 units. Due to the extreme sub-arctic conditions at the installation, the requirement emphasizes rapid response, requiring a qualified technician to be physically on-site within 24 hours of notification and a Letter of Recommended Repair submitted within one business day following inspection. To be eligible, contractors must hold an active National Board R Stamp Certificate of Authorization and ensure all welding personnel are certified under ASME Section IX. All repairs must be inspected and accepted by a certified State of Alaska Boiler Inspector, with the contractor responsible for both scheduling and funding these inspections. The contractor must provide all necessary tooling, transportation, and equipment, as the government will provide no furnished property. Additionally, personnel must be vetted through the Defense Biometric Identification System and comply with all base HAZMAT and safety regulations. This is an informational notice to determine market capabilities and procurement strategy, and it does not constitute a formal solicitation.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

8 days ago

DEADLINE

in about 17 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS