This Solicitation opportunity from Florida was posted on March 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Bradenton is undertaking a rehabilitation project for the sedimentation basin and flocculator Unit No. 2 at its Water Treatment Plant. This plant, originally constructed in 1989, uses a conventional surface water treatment method involving coagulation, flocculation, and sedimentation, with alum initially used as a coagulant. Since 1993, the process has switched to ferric sulfate, which operates at a process pH between 4 and 5. Over time, key components such as the flocculation cells, sedimentation basins, and associated structures have deteriorated, prompting the need for rehabilitation to extend the facility’s operational life.
The solicitation for this project was issued by Bradenton's Engineering Department under solicitation number 26-027NT, with responses due by April 7, 2026. The project is based in Bradenton, Florida, and managed by senior engineering and purchasing officials. The rehabilitation efforts will focus initially on Unit No. 2 to restore functionality and ensure continued compliance with treatment standards. Interested parties are directed to contact the city's procurement team or access the official project portal for further details.
General Info
City of Bradenton to rehabilitate sedimentation basin and flocculator Unit No. 2 by April 2026.
HighAI Summary for City of Bradenton IFB 26-027NT Sedimentation Basin and Flocculator No. 2 Rehabilitation: This Invitation for Bid (IFB) document, released by the City of Bradenton on March 12, 2026, solicits bids for the rehabilitation of Sedimentation Basin and Flocculator No. 2 at the Bradenton Water Treatment Plant. The document outlines the project scope, bid submission instructions, contractor qualifications, and includes attachments such as technical specifications and plans. Key dates include a non-mandatory pre-bid meeting on March 20, 2026, a question submission deadline of March 27, 2026, and a bid response deadline of April 7, 2026. The IFB emphasizes compliance with specified technical standards and requires bidders to demonstrate relevant experience and licensing.
PDF
PDF, High priority: read this first169 pages · technical-specifications
HighAI Summary for City of Bradenton Sedimentation Basin and Flocculator No. 2 Technical Specifications: This document contains the technical specifications and contract documents for the City of Bradenton Project No. 40859000-563000-26511, titled Sedimentation Basin and Flocculator No. 2 Rehabilitation. Dated January 2026, it includes detailed divisions covering general requirements, site construction, concrete, finishes, and equipment. Key sections address project scope, contractor responsibilities, public utility installations, quality requirements, environmental protection, and project closeout procedures. The document serves as a comprehensive guide for bidding and construction, outlining the work to be performed, materials, labor, and compliance standards necessary for successful project completion.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Detail Flocculator Mixer 2A 2B (anco) - Bradenton Florida Project: This document provides detailed specifications for the Flocculator Mixer Model 320BT-2V used in the Bradenton, Florida project (S.O. NO.: 88958). It includes motor data, control and driver details, impeller dimensions and performance, materials used, and design parameters such as turbine horsepower, gear ratios, and torque requirements. The document also contains operating data, electrical specifications, insulation ratings, and base plate dimensions. The mixer is designed for flocculation service with multiple equipment item numbers listed. The document is technical and intended for use in equipment manufacturing and installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Detail Flocculator Mixer 2C 2D (anco) Data Sheet: This document dated 3-10-88 provides detailed technical specifications and design calculations for the Flocculator Mixer Model 320BT-1.5V used in the Bradenton, Florida Water Treatment Plant project (S.O. No. 88958). It includes motor data, mounting options, reducer details, impeller shaft and impeller descriptions, materials used, and performance calculations such as torque, velocity gradient, and turbine horsepower. The document also contains multiple data sheets and design calculations relevant to the mixer equipment, ensuring proper selection and operation parameters for the specified application.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Detail Specification for Flocculator Mixer Model 320BT-2V: This document provides detailed specifications for the Flocculator Mixer Model 320BT-2V used in Bradenton, Florida project S.O. NO. 88958. It includes motor data, control and driver details, impeller dimensions and performance, materials used, and design parameters such as turbine horsepower, gear ratios, and torque requirements. The document also covers electrical specifications, operating data, and base plate dimensions. It serves as a technical reference for the equipment's design, operation, and installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Flocculator Mixer 2C 2D Data Sheet S.O. 88958 Bradenton Florida: This document dated 3-10-88 provides detailed technical specifications and design calculations for the Flocculator Mixer Model 320BT-1.5V used in Bradenton, Florida Water Treatment Plant, S.O. No. 88958. It includes motor details (1 HP, 1800 RPM, 230/460V, 3-phase), mounting options, reducer and impeller shaft design, impeller type and materials, and performance parameters such as velocity gradient and torque requirements. The document also contains motor data sheets and mixer design calculations relevant to the equipment's operation and service factors.
PDF
PDF, High priority: read this first7 pages · construction-drawings
HighAI Summary for FY 2026 Sedimentation Basin No. 2 Rehabilitation Construction Drawings: This document contains the construction drawings for the FY 2026 Sedimentation Basin No. 2 Rehabilitation project at the City of Bradenton Water Treatment Plant. Prepared by the City of Bradenton Public Works and Utilities Department in January 2026, it includes site vicinity and location maps, and detailed scope of work. Key tasks involve coating removal, interior and exterior recoating of the sedimentation basin and flocculator, with specifications for surface preparation, application of NSF-approved coatings, color matching, and quality control measures. The engineer of record is Kristofer S. Eccles, P.E., who has digitally signed and sealed the document.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Mixer Data Sheet 321BT-7.5V Bradenton Florida WTP: This document dated 3-10-88 is a detailed specifications sheet for four rapid mixers model 321BT-7.5V intended for the Bradenton, Florida Water Treatment Plant project (S.O. No. 88958). It includes technical data on the motor (7 HP, 1800 RPM, 230/460 volt, 3-phase), mounting options, reducer type, impeller shaft design, impeller type and materials, and operational parameters such as velocity gradient and torque requirements. The document also provides calculations for turbine horsepower, gear ratios, and velocity gradients, along with detailed motor data including electrical specifications and operating data. This comprehensive technical specification supports procurement and installation of the mixers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Mixer Model 321BT-7.5V Data Sheet for Bradenton Florida WTP: This document dated 3-10-88 provides detailed technical specifications for four rapid mixers model 321BT-7.5V intended for the Bradenton, Florida Water Treatment Plant project (S.O. No. 88958). It includes motor details (7 HP, 1800 RPM, 230/460 volt, 3-phase, TEFC), mounting options, reducer and impeller shaft design, impeller type and materials, and operational parameters such as velocity gradient and torque requirements. The document also contains calculations for mixer drive sizing, gear ratios, and operating data including electrical and mechanical characteristics. This comprehensive data sheet supports procurement and installation of the specified mixers.
PDF
PDF, High priority: read this first7 pages · specifications
HighAI Summary for Sedimentation Basin No. 2 Rehabilitation Construction Drawings Jan 2026: This document contains the construction drawings and specifications for the FY 2026 Sedimentation Basin No. 2 Rehabilitation project at the City of Bradenton Water Treatment Plant. Prepared by the City of Bradenton Public Works and Utilities Department and engineered by Kristofer S. Eccles, P.E., it includes detailed scope of work for coating removal, interior and exterior coating applications, surface preparation, and quality control measures. The document is digitally signed and sealed, dated January 2026, and outlines requirements for labor, materials, equipment, and services necessary for the rehabilitation work, including abrasive blasting, coating application, and color matching.
PDF
PDF, High priority: read this first169 pages · specifications
HighAI Summary for Specs - Sedimentation Basin No. 2 Rehabilitation Technical Specifications: This document contains the technical specifications and contract documents for the rehabilitation of Sedimentation Basin and Flocculator No. 2 for the City of Bradenton, Project No. 40859000-563000-26511, dated January 2026. It includes detailed divisions covering general requirements, site construction, concrete, finishes, and equipment. Key content includes project scope, contractor responsibilities, public utility installations and structures, quality requirements, testing, environmental protection, and project closeout procedures. The document serves as a comprehensive guide for bidding and construction activities related to this public works project.
PDF
PDF, High priority: read this first42 pages · general-conditions
HighAI Summary for Standard General Conditions of the Construction Contract 2002: This document titled 'Standard General Conditions of the Construction Contract' was prepared by the Engineers Joint Contract Documents Committee and published jointly by professional engineering organizations including the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. The version is copyrighted 2002. It contains detailed general conditions applicable to construction contracts, including definitions, contract documents, bonds and insurance, contractor responsibilities, owner responsibilities, engineer's status, changes in work, payments, suspension and termination, dispute resolution, and miscellaneous provisions. The document serves as a foundational contractual framework for construction projects, outlining rights, duties, and procedures for involved parties.
PDF
PDF, High priority: read this first18 pages · supplementary-conditions
HighAI Summary for Supplementary Conditions to Construction Contract EJCDC C-700 (2007): This document titled 'Supplementary Conditions' amends or supplements the Standard General Conditions of the Construction Contract EJCDC C-700 (2007 Edition). It includes definitions, preliminary matters, contract document intent and precedence, availability of lands, subsurface and physical conditions, bonds and insurance requirements, and other contract provisions. The document specifies changes to insurance certificates, bonds, notice to proceed, and order of precedence among contract documents. It is intended to modify and clarify the original contract conditions for a construction project, dated as per the 2007 edition referenced.
PDF
PDF, Low priority18 pages · inspection-report
LowAI Summary for Inspection Report - Sedimentation Basin 2 - City of Bradenton WTP - 251008: This document is an inspection report dated October 8, 2025, for the flocculation and sedimentation basin No. 2 at the City of Bradenton Water Treatment Plant. It includes a preliminary scope evaluation prepared by Kristofer Eccles, P.E., and reviewed by Kim Clayback, P.E. The report covers visual inspections of exterior and interior basin conditions, equipment, and piping systems, noting issues such as cracking, seeping, corrosion, and aging equipment. Photographs of inspection findings and equipment drawings are included. The report aims to evaluate repairs required or recommended for continued service of the basin system.
PDF
PDF, Low priority18 pages · inspection-report
LowAI Summary for Inspection Report Sedimentation Basin 2 WTP: This document is an inspection report dated October 8, 2025, for the City of Bradenton Water Treatment Plant's Flocculation/Sedimentation Basin No. 2. Prepared by Kristofer Eccles, P.E. and reviewed by Kim Clayback, P.E., it provides a preliminary scope evaluation including visual inspections of exterior and interior basin conditions, equipment, and piping. The report details findings such as cracking and seeping in basin walls, corrosion in mechanical systems, and recommendations for repair and coating to prevent further deterioration. It includes photos of inspection findings and equipment drawings.
PDF
PDF, Low priority13 pages · other-contract-forms
LowAI Summary for Performance Bond Form - Other Contract Forms: This document is a Performance Bond form included in a collection titled 'Other Contract Forms.' It outlines the obligations and responsibilities of the Contractor, Surety, and Owner under a contract, including conditions for Contractor Default, Surety's obligations, and legal provisions. The form includes signature blocks for Contractor and Surety, and details on bond amount, contract description, and execution requirements. The document is intended to be used as a legal bond to ensure contract performance and compliance.
The City of Bradenton Water Treatment Plant (WTP) employs a conventional surface water treatment process that is dependent upon coagulation, flocculation and sedimentation. The original design intent and subsequent construction of the WTP (1989) incorporated the use of alum as a coagulant. In 1993, rules were established that required the City implement the use of ferric sulfate as a coagulant. Following chemical addition, the working pH of the process stream varies between four (4) and five (5). Over the course of time, the flocculation cells, sedimentation basins, and appurtenances have all experienced deterioration. In in effort to extend the life of the WTP, the City will be rehabilitating the sedimentation and flocculation system, starting with Unit No. 2.