Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Self Realization Fellowship (ENV-2025-6443-CE)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Self Realization Fellowship project, identified as ENV-2025-6443-CE, involves the rehabilitation, expansion, and maintenance of historic church-related facilities at the Self-Realization Fellowship International Headquarters and Mount Washington Hotel, a designated Los Angeles Historic Cultural Monument No. 845. Located within the Mount Washington-Glassell Park Specific Plan area, the project scope is limited to approximately 3.5 acres of a 12.47-acre lot. The development includes a net addition of 12,631 square feet, bringing the total area to 44,853 square feet. Key construction elements consist of an addition to the headquarters building, a new garden and maintenance workshop with two wings, a garden shrine, a mechanical central plant, a fire pump room, a pedestrian bridge, an entry kiosk, and the reconstruction of the historic Cable Car Building with a basement addition and a remodeled visitor center. The project also requires the demolition of approximately 3,773 square feet of existing floor area. The project is eligible for Class 31 and 32 Categorical Exemptions under CEQA due to its status as an in-fill development and its adherence to the Secretary of the Interior's Standards for historic resource rehabilitation. Technical requirements include the grading of 10,361 cubic yards, with a required haul route for the export of 7,505 cubic yards of earth. The site plan incorporates 34 retaining walls and a comprehensive tree management strategy, including the removal of 10 protected trees and the replacement of 40 protected trees as approved by the Urban Forestry Division. Compliance is mandatory with the California Building Code, the City's Landform Grading Manual, and specific fire safety regulations for Very High Fire Hazard Severity Zones, including a 200-foot brush clearance. All work must align with the Geology and Soils Report Approval Letter and approved plans from the Department of Public Works for any right-of-way activities.

General Info

Rehabilitate and expand historic Self Realization Fellowship headquarters with 12,631 sq ft net addition, preserve cultural monument, manage grading and trees.

Agency

California → City of Los Angeles

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

San Rafael Ave & Mount Washington Dr, Los Angeles, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption ENV-2025-6443-CE Self Realization Fellowship Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Nicole SanchezCity Planner
Victor De la CruzRepresentative
Joseph Paul BouchardApplicant

Full Description

Show more
The proposed project includes the rehabilitation, expansion, and construction, use, and maintenance of historic church-related facilities measuring approximately 16,404 square-feet of new construction. This scope includes an addition to the existing Self Realization Fellowship International Headquarters building, a new garden and maintenance workshop consisting of two connected wings, garden shrine, mechanical central plant, fire pump room, and a pedestrian bridge/walkway within an existing garden. The project also includes an entry kiosk and the reconstruction of the historic Cable Car Building with a basement addition, and remodel of the existing visitor center, following the demolition of approximately 3,773 square-feet of existing floor area, on a 543,278.2-square-foot lot that is within the Mount Washington-Glassell Park Specific Plan area. The project would result in a net addition of 12,631 square-feet and a total of 44,853 square-feet. Although the site comprises approximately 12.47 acres of lot area, the project scope is limited to a portion of the site that is approximately 3.5 acres. As a project located on a portion of a site that is less than or equal to five (5) acres, the proposed scope of work is eligible for a Class 32 Categorical Exemption. Additionally, the project site has been identified as a historic resource by the City of Los Angeles and is improved with designated Historic Cultural Monument No. 845 (Self-Realization Fellowship International Headquarters / Mount Washington Hotel). Per an email from Office of Historic Resources (OHR) staff dated October 11, 2024, a Secretary of the Interior’s Standards Compliance Report was prepared for the project by Jenna Snow, Historic Preservation Consulting, in August 2024. The Report was reviewed by OHR and staff confirmed in this email that the report is acceptable. As a project involving the rehabilitation, maintenance, and reconstruction of a historical resource consistent with the Secretary of Interior’s Standards, the proposed scope of work is eligible for a Class 31 Categorical Exemption. Approximately 10,361 cubic yards of total grading is proposed in conjunction with an application for a haul route for the export of approximately 7,505 cubic yards of earth. The proposed grading for cut is 8,933 cubic yards and the proposed grading for fill is 1,428 cubic yards. A project requires a haul route when a site is located in the Hillside Area or a Special Bureau of Engineering (BOE) Grading Area and involves the import or export of earth material of 1,000 cubic yards or more. The subject site is located within the Hillside Area and a Special Bureau of Engineering (BOE) Grading Area and proposes the export of approximately 7,505 cubic yards of earth. Therefore, a haul route is required. Additionally, the project proposes a total of 34 retaining walls, 12 of which are new walls, 14 of which are full or partial replacements of existing walls (some of which are block walls), five (5) of which are decorative garden walls, and three (3) of which are small walls to protect trees on the property. The proposed retaining walls range from 15 feet to 210 feet in length and range from 0.5 feet to 9.9 feet in maximum height above finished grade. The Applicant retained an arborist to perform a survey of trees on and adjacent to the project site. Per the Arborist Report that was prepared by Christy Cuba, ASCA Registered Consulting Arborist #502; Cy Carlberg, ASCA Registered Consulting Arborist #405; Scott McAllaster, ISA Certified Arborist #WE7011A; and Daniel Cowell, Staff Arborist; dated March 4, 2026, there are 45 street trees in the adjacent public right-of-way, 93 Protected Trees on-site, and 1,164 non-protected trees on-site. There are also 20 off-site private property trees. 10 Protected Trees (four (4) Southern California Black Walnuts, one (1) Coast Live Oak, two (2) Mexican Elderberry shrubs, and three (3) Toyon shrubs) are proposed for removal and 40 Protected Trees (16 Southern California Black Walnuts, four (4) Coast Live Oaks, eight (8) Mexican Elderberry shrubs, and 12 Toyon shrubs) are proposed for replacement on the subject lot. The Arborist Report was reviewed, and the Urban Forestry Division Referral Form was signed by Urban Forestry Division staff on March 20, 2026. Additionally, Urban Forestry Division staff stamped a Tree Replacement plan on April 9, 2026. This environmental analysis does not authorize the removal of any street trees without the prior approval of Urban Forestry, in compliance with LAMC Section 62.9169 and 62.170 and their applicable findings.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order for the remediation, preparation, and painting of 22 designated barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The project focuses on the complete eradication of active microbial growth using EPA-registered disinfectants and the application of mold- and mildew-resistant sealing primers and paints. The scope includes preparing and painting approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces, requiring a minimum of two coats of paint that match the existing color and sheen. The government estimates the project value to be between 25,000 and 100,000 dollars, with the award based on the lowest price. The contractor must provide all labor, supplies, and equipment, completing all work within 60 calendar days of the award. Key requirements include adherence to the Davis-Bacon Act, Buy American statutes, and specific bonding requirements based on the final proposal value. A qualified Quality Control Manager is required, who may also serve as the Superintendent and Site Safety and Health Officer. Proposals were due by September 16, 2026, and must be submitted via email to the designated Navy contacts. The contractor is responsible for site cleanup and returning the area to its original condition upon completion.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 1 day
View Details
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. The scope of work is extensive, encompassing demolition of 18 existing magazines and two buildings, as well as the construction of a new Ordnance Operations building, a Truck Inspection area, and a Sentry building. Technical requirements include specialized foundations with rigid inclusions and load transfer mats, grounding and lightning protection, intrusion detection systems, and comprehensive site work involving rock excavation and wetland mitigation. The contract requires a wide array of trades, including structural steel, mechanical, electrical, plumbing, fire protection, and roofing. Infrastructure improvements include primary and secondary electrical distribution, telecommunications, access roads, and paved loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and access to the full project documentation.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS