Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Self Realization Fellowship (ENV-2025-6443-CE)

Forecast
ENV-2025-6443-CEState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Self Realization Fellowship project, identified as ENV-2025-6443-CE, involves the rehabilitation, expansion, and maintenance of historic church-related facilities at the Self-Realization Fellowship International Headquarters and Mount Washington Hotel, a designated Los Angeles Historic Cultural Monument No. 845. Located within the Mount Washington-Glassell Park Specific Plan area, the project scope is limited to approximately 3.5 acres of a 12.47-acre lot. The development includes a net addition of 12,631 square feet, bringing the total area to 44,853 square feet. Key construction elements consist of an addition to the headquarters building, a new garden and maintenance workshop with two wings, a garden shrine, a mechanical central plant, a fire pump room, a pedestrian bridge, an entry kiosk, and the reconstruction of the historic Cable Car Building with a basement addition and a remodeled visitor center. The project also requires the demolition of approximately 3,773 square feet of existing floor area. The project is eligible for Class 31 and 32 Categorical Exemptions under CEQA due to its status as an in-fill development and its adherence to the Secretary of the Interior's Standards for historic resource rehabilitation. Technical requirements include the grading of 10,361 cubic yards, with a required haul route for the export of 7,505 cubic yards of earth. The site plan incorporates 34 retaining walls and a comprehensive tree management strategy, including the removal of 10 protected trees and the replacement of 40 protected trees as approved by the Urban Forestry Division. Compliance is mandatory with the California Building Code, the City's Landform Grading Manual, and specific fire safety regulations for Very High Fire Hazard Severity Zones, including a 200-foot brush clearance. All work must align with the Geology and Soils Report Approval Letter and approved plans from the Department of Public Works for any right-of-way activities.

General Info

Rehabilitate and expand historic Self Realization Fellowship headquarters with 12,631 sq ft net addition, preserve cultural monument, manage grading and trees.

Agency

California → City of Los Angeles

Place of Performance

San Rafael Ave & Mount Washington Dr, Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Los Angeles
Office AddressN/A
Contacts
Nicole SanchezCity Planner
Victor De la CruzRepresentative
Joseph Paul BouchardApplicant

Full Description

Show more
The proposed project includes the rehabilitation, expansion, and construction, use, and maintenance of historic church-related facilities measuring approximately 16,404 square-feet of new construction. This scope includes an addition to the existing Self Realization Fellowship International Headquarters building, a new garden and maintenance workshop consisting of two connected wings, garden shrine, mechanical central plant, fire pump room, and a pedestrian bridge/walkway within an existing garden. The project also includes an entry kiosk and the reconstruction of the historic Cable Car Building with a basement addition, and remodel of the existing visitor center, following the demolition of approximately 3,773 square-feet of existing floor area, on a 543,278.2-square-foot lot that is within the Mount Washington-Glassell Park Specific Plan area. The project would result in a net addition of 12,631 square-feet and a total of 44,853 square-feet. Although the site comprises approximately 12.47 acres of lot area, the project scope is limited to a portion of the site that is approximately 3.5 acres. As a project located on a portion of a site that is less than or equal to five (5) acres, the proposed scope of work is eligible for a Class 32 Categorical Exemption. Additionally, the project site has been identified as a historic resource by the City of Los Angeles and is improved with designated Historic Cultural Monument No. 845 (Self-Realization Fellowship International Headquarters / Mount Washington Hotel). Per an email from Office of Historic Resources (OHR) staff dated October 11, 2024, a Secretary of the Interior’s Standards Compliance Report was prepared for the project by Jenna Snow, Historic Preservation Consulting, in August 2024. The Report was reviewed by OHR and staff confirmed in this email that the report is acceptable. As a project involving the rehabilitation, maintenance, and reconstruction of a historical resource consistent with the Secretary of Interior’s Standards, the proposed scope of work is eligible for a Class 31 Categorical Exemption. Approximately 10,361 cubic yards of total grading is proposed in conjunction with an application for a haul route for the export of approximately 7,505 cubic yards of earth. The proposed grading for cut is 8,933 cubic yards and the proposed grading for fill is 1,428 cubic yards. A project requires a haul route when a site is located in the Hillside Area or a Special Bureau of Engineering (BOE) Grading Area and involves the import or export of earth material of 1,000 cubic yards or more. The subject site is located within the Hillside Area and a Special Bureau of Engineering (BOE) Grading Area and proposes the export of approximately 7,505 cubic yards of earth. Therefore, a haul route is required. Additionally, the project proposes a total of 34 retaining walls, 12 of which are new walls, 14 of which are full or partial replacements of existing walls (some of which are block walls), five (5) of which are decorative garden walls, and three (3) of which are small walls to protect trees on the property. The proposed retaining walls range from 15 feet to 210 feet in length and range from 0.5 feet to 9.9 feet in maximum height above finished grade. The Applicant retained an arborist to perform a survey of trees on and adjacent to the project site. Per the Arborist Report that was prepared by Christy Cuba, ASCA Registered Consulting Arborist #502; Cy Carlberg, ASCA Registered Consulting Arborist #405; Scott McAllaster, ISA Certified Arborist #WE7011A; and Daniel Cowell, Staff Arborist; dated March 4, 2026, there are 45 street trees in the adjacent public right-of-way, 93 Protected Trees on-site, and 1,164 non-protected trees on-site. There are also 20 off-site private property trees. 10 Protected Trees (four (4) Southern California Black Walnuts, one (1) Coast Live Oak, two (2) Mexican Elderberry shrubs, and three (3) Toyon shrubs) are proposed for removal and 40 Protected Trees (16 Southern California Black Walnuts, four (4) Coast Live Oaks, eight (8) Mexican Elderberry shrubs, and 12 Toyon shrubs) are proposed for replacement on the subject lot. The Arborist Report was reviewed, and the Urban Forestry Division Referral Form was signed by Urban Forestry Division staff on March 20, 2026. Additionally, Urban Forestry Division staff stamped a Tree Replacement plan on April 9, 2026. This environmental analysis does not authorize the removal of any street trees without the prior approval of Urban Forestry, in compliance with LAMC Section 62.9169 and 62.170 and their applicable findings.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price construction project involves comprehensive renovations including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling of vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include upgrading lighting controls, replacing ceiling fans, updating doors and life-safety components, and replacing variable air volume systems. The contractor is also responsible for moving and protecting loose furniture and providing new ADA-compliant signage for all spaces. The period of performance is scheduled from January 11, 2027, to March 11, 2028, totaling 425 calendar days after the Notice to Proceed. Proposals are due by November 18, 2026, and will be evaluated based on price, past performance, and corporate relevant experience. Awardees must provide payment and performance bonds, and bidders are required to furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. Due to the nature of the facility, personnel must undergo background checks and adhere to strict security and safety protocols, including the DHS Non-Disclosure Agreement and FBI fingerprinting. All work must comply with applicable Davis-Bacon wage determinations and Buy American requirements.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are due by November 23, 2026, and will be awarded based on the lowest price. Bidders must provide pricing for two specific exhibit line items: building renovation and paving removal and replacement. Bonding requirements vary by proposal value, with those 150 thousand dollars and greater requiring bid, payment, and performance bonds. The contract is subject to the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines. Invoicing must be submitted monthly via Wide Area Work Flow using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 1 hour ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 1 hour ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile repair, and rubber wall base installation, as well as flooring replacement, vanity and cabinet restoration, and necessary electrical and plumbing work to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside solicitation open to Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60%), quality (20%), past performance (10%), and schedule (10%). Prospective bidders must attend a mandatory pre-bid site walk-through and submit a proposal by November 17, 2026, including a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring compliance with specific minimum wage rates and paid sick leave mandates. All work must adhere to OSHA, EPA, ADA, and NFPA-101 Life Safety Code standards, with payment terms set at Net 30.
Grafton Job Corps

POSTED

about 1 hour ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return them to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100. Proposing contractors must provide itemized pricing by room and trade, a detailed description of their proposed work methods for an occupied building, and evidence of relevant experience. Award requirements include the provision of payment and performance bonding for the full project value, as well as general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate, all within ten days of award. Final acceptance by CSD is contingent upon successful system testing, debris removal, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 1 hour ago

DEADLINE

in 12 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS