Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on March 7, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sensor Array and Vector Measurement-Based RF Exposure Measurement System

Closed
FCC-WL-2017-03-07Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

Agency

N/A

NAICS

334111 - Electronic Computer Manufacturing

Place of Performance

Federal Communications Commission, WASHINGTON, DC, 20554, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Mar 21, 2018 to Mar 28, 2018. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
William LevensonContracting Officer
Timothy G. SmithChief of Contracts and Purchasing Center

Full Description

Show more
This is a Request for Information for the equipment listed below. If your organization can provide this equipment, please contact the Contracting Officer. Sensor Array and Vector Measurement-Based RF Exposure Measurement System List of Specifications Sensor array and vector measurement-based RF exposure measurement system shall include: 1) Sensor array and vector measurement-based RF exposure measurement system (the system) to perform Specific Absorption Rate (SAR) measurements in the 650 MHz to 6 GHz frequency range according to the IEC Publically Available Specification PAS 63151 and, via system upgrades and updates, according to any new or additional requirements introduced through voting drafts of the corresponding International Standard (IS) established under IEC TC106 PT 62209-3 (CD, CDV and FDIS). The vendor shall demonstrate its ability and continued commitment to provide service and support for the system in accordance with IEC PAS 63151 and IEC 62209-3 requirements. 2) All components, including the head (left and right) and body (flat) phantoms (human anatomical models) specified by the IEC 62209 series of SAR measurement standards, system verification reference sources, and all supporting accessories required for accurate placement of the verification sources and test devices against the phantom to perform SAR measurements according to IEC PAS 63151 and IEC 62209-3 protocols. 3) All firmware and hardware, including accessories such as computer systems, controllers, cables, connectors, cabinets and electrical connections, and system documentation required to operate the system. 4) Detailed system validation results shall be available for the delivered system, to demonstrate compliance with IEC PAS 63151 and applicable draft IEC 62209-3, at the time of system installation according to ptotocols and procedures specified in such documents. 5) System measurement accuracy shall be fully demonstated at the time of installation, to comply with IEC PAS 63151 and most recent draft or final version IEC 62209-3. 6) The system shall be delived in fully calibrated conditions at no additional cost. Overall system and sub-system or component calibration shall be traceable to acceptable national or international requirements and clearly identified in the calibration certificates and associated documents for acceptance at the time of installation. 7) The worst-case measurement uncertainty under all operating circumstances supported by the system shall not be higher than 30% for a confidence interval of k=2. Operating configurations and measurement conditions that may result in higher than 30% measurement uncertainty shall be fully disclosed in response to this procurement request to determine if it is acceptable and shall be confirmed during system installation. 8) Installation and training on operation of the system. 9) Incidential costs; inculding but not limited to shipping to destination, tax and duty, travel and accomodation expenses for the training. 10) Recommended and required system maintenance, components and overall system calibration schedule shall be fully specified. All costs and estimates for subsequent annual system calibrations, maintenance, and other support services (including but not limited to firmware and hardware upgrades) after initial system deployment shall be clearly identified and contained in the cost proposal for at least the first 5 years from the date of completion of installation. 11) All conditions and requirements to operate the system shall be fully disclosed in the response to this procurement request. 12) All optional equipment or components that are not required for the system to operate or to satisfy IEC PAS 63151 and IEC 62209-3 requirements shall be clearly identified. 13) Any advantages in the implementation of the system to provide additional functionality and associated costs and value shall be specified.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS