Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Services professionnels pour l’inventaire des arbres municipaux hors boisé

Closed
20123008International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
PA-2400377 Conditional Use Permit / Camp Goldstar Project
Solicitation # PA-2400377
Conditional Use Permit PA-2400377 authorizes the construction and operation of Camp Goldstar, a private resort located on McDonald Island in the Sacramento-San Joaquin River Delta within San Joaquin County, California. The development features 25 prefabricated mobile lodges, four of which must be ADA accessible, and a 6,160-square-foot L-shaped marina dock with a capacity for 33 to 44 boats. Supporting infrastructure includes a 6,500-square-foot two-story clubhouse with a caretaker's unit, a 1,440-square-foot garage, a 2,500-square-foot pool and spa area with five cabanas, and various recreational facilities such as bocce ball, volleyball, and pickleball courts. Additional site amenities consist of a picnic shelter, dog run, communal restrooms, a housekeeping and laundry building, a gazebo, two observation towers, and 27 fire pits. The project will utilize on-site private water, sanitary sewer, and storm drainage systems. The project was approved by the Planning Commission on November 6, 2025, following a Mitigated Negative Declaration under CEQA, which determined that proposed mitigation measures would reduce environmental effects to insignificant levels. Key regulatory requirements include compliance with AG-80 zoning and OS/RC General Plan designations, as well as adherence to California Health and Safety Codes for septic systems and specific county standards for storm drainage and lighting. Special mandates include the registration of mobile lodges as recreational vehicles with the State of California and strict adherence to CalGEM guidelines regarding the abandonment of oil and gas wells on the property. Construction is scheduled to begin in January 2026, progressing through site preparation, grading, underground utilities, and building construction, with a projected completion date of November 30, 2026.
San Joaquin County

POSTED

about 18 hours ago

DEADLINE

N/A
NAICS: 541620
New
SLED
Mid-Town Area/Specific Plan Initial Study/Initial Environmental Checklist/Negative DeclarationThe City of South Lake Tahoe is advancing the Mid-Town Area Plan, a comprehensive land use and zoning revision for approximately 780 acres in the heart of the community, designed to align with regional environmental goals set by the Tahoe Regional Planning Agency. This plan expands the existing Town Center overlay from 65 acres to 339 acres, introducing more flexible development standards for height, density, and land coverage to encourage mixed-use, residentially-oriented redevelopment that fosters a walkable, vibrant downtown core. Key environmental designations overlay portions of the plan area, including a stream restoration zone and Shorezone Tolerance District 4, ensuring that development proceeds within the ecological constraints of the Lake Tahoe Basin. The initiative is supported by an Initial Environmental Checklist and Negative Declaration, affirming that the proposed changes, when implemented with specific mitigation measures, will not result in significant environmental impacts under CEQA and TRPA regulations. The project focuses on sustainable growth, targeting improvements in housing availability, transportation efficiency, greenhouse gas reduction, and stormwater management while respecting local infrastructure capacities and noise thresholds defined by CNEL standards. The planning effort is led by the City of South Lake Tahoe with technical support from Ascent Environmental Inc., with primary coordination managed by the City’s Senior Planner, Anna Kashuba. Although this initiative is fundamentally a zoning and environmental planning document rather than a procurement contract, it involves formal administrative review processes requiring compliance with TRPA Code, California Building Code, and state environmental regulations. Inspection and acceptance responsibilities are shared between City and TRPA authorities, who oversee adherence to performance criteria such as erosion controls, hazardous materials handling, geotechnical standards, and wastewater system limits. While no formal contract value, payment terms, solicitation number, or federal acquisition clauses are present, the project operates under a defined timeline for public review from July 21 to August 19, 2026, with subsequent implementation dependent on regulatory approval and community input. The plan serves as the foundational regulatory framework for future development in the designated area, integrating environmental sustainability with urban revitalization objectives without invoking traditional federal contracting mechanisms or procurement structures.
City of South Lake Tahoe

POSTED

about 18 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

The City of Salaberry-de-Valleyfield is seeking the professional services of an urban forestry consulting firm to complete the inventory of approximately 42,000 municipal trees located outside forested areas. This inventory involves identifying tree species and assessing their overall health to pinpoint vulnerable sectors within the urban forest and to better guide and prioritize arboricultural efforts. The targeted trees, which have not yet been inventoried or have unknown health status, are situated on various municipal properties including streetsides, waterfront zones, parks, and green spaces throughout the city's entire territory. The inspection requires a thorough 360-degree visual examination from the base to the crown of each tree, with detailed data on location, species, and health condition to be integrated into the City's database via a web application provided by the municipality. The work will commence on May 1, 2026, and must be completed by July 31, 2028. The city territory is divided into five sectors, and the inventory must be conducted sequentially according to a priority order established by the City. Bidders are required to submit a unit price per tree in their pricing proposal. The solicitation is managed by the City's Procurement Authority with responses due by March 16, 2026.

General Info

Salaberry-de-Valleyfield seeks urban forestry firm for 42,000 tree inventory by July 2028.

Agency

Government of Canada → Ville de Salaberry-de-Valleyfield

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Montérégie, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Ville de Salaberry-de-Valleyfield
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Ville de Salaberry-de-Valleyfield
Office AddressN/A
Contacts
ApprovisionnementContracting Authority

Full Description

Show more
La Ville désire s’adjoindre les services professionnels d'une firme de consultants en foresterie urbaine pour finaliser l’inventaire de ses arbres municipaux hors boisé, incluant l’identification de l’espèce et l’évaluation de leur état de santé général, dans le but d’identifier ses secteurs de vulnérabilité de la forêt urbaine et de mieux orienter et prioriser ses actions en matière d’arboriculture. L’inventaire couvrira les arbres de propriété municipale situés sur des terrains municipaux bâtis, en bordure de rue, en bande riveraine, en parc ou sur un espace vert, et ce, sur l’entièreté du territoire de la Ville de Salaberry-de-Valleyfield. Dans le but d’établir un diagnostic précis de l’état de santé de la forêt urbaine, le présent contrat comprend l’ensemble des arbres publics hors boisé qui n’ont pas encore été inventoriés ou dont l’état de santé est inconnu, soit environ quarante-deux mille (42 000) arbres. Ceux-ci devront faire l’objet d’une inspection visuelle, du pied jusqu’ à la cime sur 360° et les informations sur la localisation, l’espèce et l’état de santé devront être intégrés à la base de données de la Ville via l’application web qui sera fournie par la Ville. Les travaux d’inventaires débuteront le 1er mai 2026 et devront être complétés avant le 31 juillet 2028. Le territoire de la Ville est séparé en 5 secteurs et l’inventaire devra être réalisé et complété secteur par secteur en respectant l’ordre de priorité établi par la Ville (les secteurs sont présentés en annexe). Les soumissionnaires devront proposer un tarif unitaire par arbres, qui devra être inscrit au bordereau de prix.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS