Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Sewer Collection System Design & Engineering

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Sewer Collection System Design and Engineering involves providing detailed engineering and design services for sewer service extensions on municipal projects in Shasta Lake, California. The scope of work includes designing layouts for sewer mains and lateral connections for 340 residences, calculating flow rates and pipe sizing, and developing comprehensive technical specifications. The selected provider will utilize CAD and hydraulic modeling software to deliver final design plans and engineering reports. The project is managed under the State Water Resources Control Board, Division of Financial Assistance, and falls under NAICS code 541330. A critical requirement for this contract is that the performing engineer must hold a valid Professional Engineer license in the state of California.

General Info

Engineering design for sewer extensions in Shasta Lake, CA, requiring a California PE license.

Agency

California → SWRCB, Division of Financial Assistance

Place of Performance

Shasta Lake, CA

Set-Aside

NONE

Documents

This scope was carved out of C-06-8821-110.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Summit City Septic-to-Sewer Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Financial Assistance
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Financial Assistance
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs detailed engineering and design for sewer service extensions for prime contractors on City of Shasta Lake municipal projects. Designs layouts for sewer mains and lateral connections for 340 residences, develops technical specifications, and calculates flow rates and pipe sizing. Utilizes CAD and hydraulic modeling software. Requires a Professional Engineer (PE) license in California. Delivers final design plans, technical specifications, and engineering reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Orange County Managed Lanes Segment Advancement Study C265256
Solicitation # C265256
The Orange County Transportation Authority is soliciting professional services for the Orange County Managed Lanes Segment Advancement Study, a project with an estimated budget of 350,000 dollars and a duration of 18 months. The primary objective of the study is to evaluate existing, planned, and potential managed lane facilities to identify priority segments ready to advance into the Project Initiation Document phase. The work is structured into four key tasks: project management and coordination, segment inventory and screening, priority segment advancement assessment for up to two segments, and the delivery of a final study report with technical appendices. This is a firm fixed price contract requiring the consultant to provide designated key personnel and adhere to Level 1 Health, Safety, and Environmental specifications, including compliance with CCR Title 8. Invoicing occurs on a monthly basis, with payments remitted within 30 calendar days of approval, and final acceptance is contingent upon the release of retention. Proposals must be submitted electronically via the OpenGov portal by November 30, 2026, and must include a detailed cost proposal across the four specified tasks. Consultants are also required to disclose any conflicts of interest and may be required to file Statements of Economic Interest.
Planning-Planning & Analysis

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS