Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Sewer Highway Crossings Retrofit Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sewer Highway Crossings Retrofit Project aims to replace three aging gravity sewer lines beneath U.S. Highway 101 in McKinleyville, California, with more resilient and higher-capacity pipelines to withstand seismic events and accommodate increased stormwater flows. The existing pipes will be substituted with parallel installations of High Density Polyethylene (HDPE) and Fusible Polyvinyl Chloride (FPVC) pipes, enhancing structural durability and hydraulic performance. Work will occur at three specific crossing locations within a 15.2-acre project area and involves extensive earthmoving, excavation, linear grading, stabilization, and utility installation, all with strict compliance to environmental regulations. Construction is scheduled in phases: linear grading and excavation from July 2026 to January 2027, drainage and utilities from January to April 2027, and final stabilization from April to June 2027. All activities must adhere to State Water Resources Control Board stormwater permits, Cal/OSHA safety standards, and Humboldt County wetland protection codes, with mandatory dust control, spill prevention, and erosion mitigation measures. Environmental compliance is central, requiring adherence to CEQA guidelines, submission of biological survey data to CNDDB, preservation of sensitive habitats, and use of NSF 060-compliant drilling fluids during trenchless methods. The McKinleyville Community Services District is the lead agency and contracting authority, with General Manager Patrick Kaspari serving as the primary point of contact for all project oversight. No federal acquisition regulation clauses, contract type, pricing data, or federal accounting identifiers are specified, indicating this is a local government procurement not governed by typical federal procurement frameworks. Attachments include site figures, biological resource assessments, photodocumentation, and wetland delineation reports, all supporting environmental reviews under CEQA. While no formal evaluation factors, payment terms, invoicing systems, or submission deadlines are outlined, contractors must comply with extensive environmental and operational requirements including worker training on protected species, establishment of protective buffers around rare flora, and prohibition of refueling within 50 feet of water bodies. Labeling of hazardous materials must follow Cal/OSHA hazard communication standards, and all documentation—such as sign-in records for training and stormwater pollution prevention reports—must be maintained for regulatory inspection. The project is not subject to federal small business set-asides, CAGE codes, SAM.gov registration, or military standards, and procurement details are managed entirely at the state and local level with no indication of bid submission portals or electronic

General Info

Replace aging sewer lines under US-101 with HDPE and FPVC pipes, complying with strict environmental and safety regulations.

Agency

California → McKinleyville Community Services District

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, 95519

Set-Aside

NONE

Documents

(6)

12669030_MCSD_Sewer_Crossing_ISMND_Appendix

PDFenvironmental-study

12669030_MCSD_Sewer_Crossing_ISMND_Public - Initial Study/Proposed Mitigated Negative Declaration

PDFenvironmental-study

MCSD Sewer Highway Crossings Retrofit Project Summary Form

PDFenvironmental-summary

MCSD Sewer Highway Crossings Retrofit Project NOI

PDFnotice-of-intent

MCSD Sewer Highway Crossings Retrofit Project Notice of Completion

PDFnotice-of-completion

Notice of Determination for Sewer Highway Crossings Retrofit Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → McKinleyville Community Services District
Contacts2 people available
OfficeN/A
Organization / Agency
California → McKinleyville Community Services District
Office AddressN/A
Contacts
Patrick KaspariGeneral Manager
Andrea HiltonTechnical Director - Environmental Planning

Interested Companies (1)

Show more
GHD
Eureka, CA

Full Description

Show more
The Sewer Highway Crossings Retrofit Project would replace three existing gravity sewer lines across McKinleyville that cross under U.S. 101 with pipes that are more resilient to damage in a major earthquake and with a slightly larger capacity to handle larger storm event flows than the existing pipes. Specifically, the pipes would be replaced with parallel High Density Polyethylene (HDPE) pipe or Fusible Polyvinyl Chlorine (FPVC) pipe. The proposed replacement method for each highway crossing is Horizontal Auger Boring. The three Project sites total approximately 15.2 acres.

Similar Contracts

Same NAICS industry code