Sewer Highway Crossings Retrofit Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Sewer Highway Crossings Retrofit Project aims to replace three aging gravity sewer lines beneath U.S. Highway 101 in McKinleyville, California, with more resilient and higher-capacity pipelines to withstand seismic events and accommodate increased stormwater flows. The existing pipes will be substituted with parallel installations of High Density Polyethylene (HDPE) and Fusible Polyvinyl Chloride (FPVC) pipes, enhancing structural durability and hydraulic performance. Work will occur at three specific crossing locations within a 15.2-acre project area and involves extensive earthmoving, excavation, linear grading, stabilization, and utility installation, all with strict compliance to environmental regulations. Construction is scheduled in phases: linear grading and excavation from July 2026 to January 2027, drainage and utilities from January to April 2027, and final stabilization from April to June 2027. All activities must adhere to State Water Resources Control Board stormwater permits, Cal/OSHA safety standards, and Humboldt County wetland protection codes, with mandatory dust control, spill prevention, and erosion mitigation measures. Environmental compliance is central, requiring adherence to CEQA guidelines, submission of biological survey data to CNDDB, preservation of sensitive habitats, and use of NSF 060-compliant drilling fluids during trenchless methods. The McKinleyville Community Services District is the lead agency and contracting authority, with General Manager Patrick Kaspari serving as the primary point of contact for all project oversight. No federal acquisition regulation clauses, contract type, pricing data, or federal accounting identifiers are specified, indicating this is a local government procurement not governed by typical federal procurement frameworks. Attachments include site figures, biological resource assessments, photodocumentation, and wetland delineation reports, all supporting environmental reviews under CEQA. While no formal evaluation factors, payment terms, invoicing systems, or submission deadlines are outlined, contractors must comply with extensive environmental and operational requirements including worker training on protected species, establishment of protective buffers around rare flora, and prohibition of refueling within 50 feet of water bodies. Labeling of hazardous materials must follow Cal/OSHA hazard communication standards, and all documentation—such as sign-in records for training and stormwater pollution prevention reports—must be maintained for regulatory inspection. The project is not subject to federal small business set-asides, CAGE codes, SAM.gov registration, or military standards, and procurement details are managed entirely at the state and local level with no indication of bid submission portals or electronic
General Info
Agency
NAICS
Place of Performance
CA, 95519Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
