Sewer Lift Station S-29 Decommissioning and Force Main Replacement Harbor Development Permit No. 26-015
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Long Beach Utilities is seeking to decommission and abandon the Catalina Station Sewer Lift Station S-29 and replace existing force main infrastructure in Long Beach, California. The project involves the removal of a 3-inch PVC force main and the abandonment of approximately 700 lineal feet of a 10-inch asbestos cement force main. New installations include 858 lineal feet of a 6-inch sewer lateral and 471 lineal feet of a 10-inch high density polyethylene sewer force main, both requiring trenching through asphalt and soil. Additionally, the scope includes a trenchless installation of approximately 207 linear feet to place a 20-inch steel casing with a 10-inch HDPE carrier pipe specifically to serve the Queen Mary. This project is associated with Harbor Development Permit No. 26-015 and is managed through the Port of Long Beach and Long Beach Utilities.
General Info
Agency
NAICS
Place of Performance
Long Beach, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
