Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sewer Line Chemical Root Control Services for the City of Chattanooga

Closed
200969-2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes of 18 and 24 inches. Specialized requirements include trenchless crossings for 24-inch DIP sewers with associated launch and receiving shafts, the installation of standard and doghouse manholes up to 84 inches in diameter, and a CSO regulator fit out. Site preparation tasks include clearing and grubbing over 5,130 square yards of wooded areas, seeding, and fine grading. Key project deliverables and requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Additionally, the project requires specific railroad insurance. All work must adhere to the provided technical drawings and project sheets.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system in accordance with the provided bid documents. Key deliverables include AC paving, pipe and fitting installation, traffic loops, and demolition, alongside specialized services such as jack and bore, cold planing, potholing, welding, and SWPPP compliance. This solicitation specifically targets certified HUBZone Small Business and Disadvantaged Business Enterprise partners, including DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The response deadline for this solicitation is November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc.
Norstar Plumbing and Engineering, Inc

POSTED

about 2 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This is a four-year contract for Sewer Line Chemical Root Control Services to be performed for the City of Chattanooga Wastewater Department in Tennessee. The solicitation, identified by number 200969-2, was posted on July 29, 2026, with responses due by August 4, 2026. The contract is being managed by the City of Chattanooga Business Unit, and all services are expected to be delivered within Tennessee. Robin L Powell, listed as the Buyer, is the point of contact and can be reached at [email hidden]. The agreement does not specify a particular set-aside status or NAICS code, and the place of performance is limited to the City of Chattanooga’s wastewater infrastructure. No physical office address or zip code is provided for the agency, and all work must be completed in accordance with the city’s operational requirements over the term of the contract.

General Info

Four-year sewer root control contract for Chattanooga wastewater, managed by Robin L Powell, performance in Tennessee.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → City of Chattanooga Business Unit
Contacts1 person available
OfficeN/A

Full Description

Show more
This shall be a four year agreement for Sewer Line Chemical Root Control Services for the City of Chattanooga Wastewater Department.

More opportunities from Tennessee → City of Chattanooga Business Unit

Same awarding agency

NAICS: 237110
New
SLED
RFP/Construction Manager at Risk (CMAR) Pump Station Improvements - Hixson 2
Solicitation # W-19-026-202
The City of Chattanooga is soliciting a Construction Manager at Risk (CMAR) for the Hixson 2 pump station improvements as part of its Consent Decree program. The project involves the replacement of an aging wastewater pump station with a new facility featuring a 40-foot deep, cast-in-place concrete wet well, three submersible pumps, a controls building, valve and meter vaults, and associated electrical gear and flow monitoring equipment. The scope of work includes the installation of gravity sewer and force main piping, providing temporary bypass pumping during construction, and the demolition of the existing station after commissioning. The selected contractor will provide pre-construction services, collaborating with the City, WSP, and Jacobs to develop construction documents and a Guaranteed Maximum Price (GMP) proposal. Proposals are evaluated based on corporate experience in CMAR or Progressive Design-Build (20%), water/wastewater facilities experience (30%), complex project experience involving karst topography or deep foundations (30%), resources and stability (10%), and proposed fees (10%). Requirements for the proposer include providing a statement of bonding capacity, a ten-year history of project completion and bankruptcy status, and a five-year litigation history. The contractor must provide performance and payment bonds and maintain insurance listing the Owner and consultants as additional insureds. Work must commence within seven to ten days of a Notice to Proceed, with substantial completion requiring full, uninterrupted operation and successful functional testing as certified by the Engineer.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS