Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Texas was posted on March 18, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sewer Line Installation & Relocation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 16 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract involves the installation of new sewer lines and the relocation of existing utilities in accordance with TxDOT 2014 specifications. Work includes all necessary activities such as trenching, pipe laying, jointing, backfilling, and system testing to ensure compliance with established standards. The project falls under NAICS code 238910 and is structured as a subcontract opportunity posted by Brazos Valley in Texas. The solicitation was made public on March 18, 2025, with proposals due by July 15, 2025. The location of performance is within the Brazos Valley region, though specific city or zip details are not provided. All work must adhere strictly to the technical and procedural requirements outlined in the referenced TxDOT guidelines to ensure safety, durability, and regulatory compliance.

General Info

Install sewer lines and relocate utilities per TxDOT 2014 specs in Brazos Valley, Texas, by July 15, 2025.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 25-053.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Apa For Topsoil, Sand, Concrete Rip Rap

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Brazos Valley
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → Brazos Valley
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of new sewer lines and relocation of existing utilities including trenching, pipe laying, jointing, backfilling, and testing per TxDOT 2014 specifications.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS