Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Sewer Main and Lateral Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the replacement of aging sewer collection infrastructure for the City of Portola in California. The scope of work focuses on the installation of a comprehensive wastewater collection system, including various sizes of piping such as 21,370 feet of 8-inch, 1,930 feet of 15-inch, 480 feet of 12-inch, and 150 feet of 10-inch mains. Additionally, the project requires the installation of approximately 22,950 feet of 4-inch laterals and two-way cleanouts. The project is categorized under NAICS code 237110 and is performed as a subcontract for prime contractors. All work is located within Portola, California, zip code 96122, with the primary objective of delivering a fully installed system of mains and laterals to modernize the city's wastewater infrastructure.

General Info

Subcontract for replacing sewer infrastructure and installing wastewater mains and laterals in Portola, California.

Agency

California → City of Portola

Place of Performance

Portola, CA, 96122

Set-Aside

NONE

Documents

This scope was carved out of 2630.20.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of Portola Water Distribution System and Wastewater Collection System Improvements Projects

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom City of Portola Water Distribution System and Wastewater Collection System Improvements Projects
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Portola
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Portola
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs replacement of aging sewer collection infrastructure for prime contractors on City of Portola wastewater projects. Installs ~1,930 ft of 15-inch, ~480 ft of 12-inch, ~150 ft of 10-inch, and ~21,370 ft of 8-inch piping, plus ~22,950 ft of 4-inch laterals and two-way cleanouts. Delivers an installed wastewater collection system including mains and laterals.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS