Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SFOBB West Bay Fender System Replacement and Skirt Modification

Closed
20260626028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 11 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 16 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The contract pertains to the replacement of the fender system and modification of the concrete skirt on the west bay piers (W3, W4, W5, W6) of the San Francisco-Oakland Bay Bridge, with all work to be conducted from marine-based equipment over San Francisco Bay. The project involves demolition of existing fender components—treated wood, plastic lumber, and steel—as well as portions of the concrete skirt, followed by new construction including galvanic anodes, structural concrete with polymer fiber and RSC, precast concrete posts, stainless steel reinforcement, and miscellaneous metals. A new upper fender system will be installed featuring rubber fender units and Fiber Reinforced Polymer (FRP) panels, along with FRP walers and a new FRP drainage system, and stainless steel pipe handrailing. The work must comply with Caltrans Standard Specifications, PIANC performance data for fender systems, and federal regulations including the Clean Water Act and U.S. Army Corps of Engineers Nationwide Permit 15, with environmental protections for marine species and habitat required. All materials, particularly stainless steel and iron products, must be coated in the United States to meet Buy America provisions, and certifications of origin, mill test reports, and compliance documentation for all delivered materials are mandatory. Performance is expected to commence within 55 days of contract approval by the Attorney General, with a baseline Critical Path Method schedule submitted within 14 days of award. The estimated contract value is $110 million, with specific line items including mobilization, dispute resolution board meetings at $7,500 per session, and stainless steel reinforcing steel totaling 576,500 pounds. The Department of Transportation will conduct inspections and accept deliverables based on material test reports, performance verification data for rubber fenders, and submittal of the Stormwater Pollution Prevention Plan and Water Pollution Control Plan. Special requirements include a qualified safety representative with CSP, CIH, CHMM, or OHST certification, an asbestos survey before demolition, coordination with BCDC and USCG, and attendance at a mandatory prebid meeting. All proposals must be submitted via the Department’s Bidders Inquiries portal by the August 27, 2026 deadline, and the work will be performed exclusively at the Oakland, California location on the Bay Bridge’s west piers. Payment processing is electronic through Caltrans’ prompt payment system, with no formal contracting officer identified, but oversight is provided by a Contract Manager and Task

General Info

Replace fender system and concrete skirt on Bay Bridge piers with corrosion-resistant materials, FRP, stainless steel, and marine-safe designs.

Agency

State of California, Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Oakland, CA, 94607, USA

Set-Aside

NONE

Documents

(7)

Contract 04-0W1404 Notice to Bidders and Special Provisions for SF Highway Construction

PDFrfp

Addendum No. 1 for 04-0V1404 San Francisco Highway Construction

PDFamendment

Addendum No. 2 for Contract 04-0W1404 San Francisco Highway Construction

PDFamendment

BCDC Permit No. M1987.042.08 Amendment No. 8 for Caltrans Maintenance

PDFpermit

04-0W1404 California DOT Project Plans for San Francisco-Oakland Bay Bridge West Bay

PDFproject-plans

California DOT Bridge 34-0003 Demolition Plan Addendum 2

PDFspecifications

California Construction Wage Determination CA20260018

PDFwage-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of California, Department of Transportation
Contacts1 person available
OfficeN/A
Organization / Agency
State of California, Department of Transportation
View Agency Profile
Office AddressN/A
Contacts
GORDON W. JEONG

Full Description

Show more
Bid #04-0W1404: The project consists of replacing the bridge fender system and modifying the concrete skirt on the west bay piers (W3, W4, W5, W6) of the San Francisco-Oakland Bay Bridge. Work includes demolition of the existing fender system (treated wood, plastic lumber, steel) and portions of the concrete skirt. New construction involves installing galvanic anodes, placing structural concrete (polymer fiber and RSC), furnishing and erecting precast concrete posts, and installing stainless steel reinforcement and miscellaneous metals. A new upper fender system with rubber fender units and Fiber Reinforced Polymer (FRP) panels, as well as FRP walers and a new FRP drainage system, will be installed. The scope also includes new stainless steel pipe handrailing. All work will be performed from marine-based equipment over the San Francisco Bay.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS