Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SFOBB West Bay Fender System Replacement and Skirt Modification

Closed
20260626028State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 13 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract pertains to the replacement of the fender system and modification of the concrete skirt on the west bay piers (W3, W4, W5, W6) of the San Francisco-Oakland Bay Bridge, with all work to be conducted from marine-based equipment over San Francisco Bay. The project involves demolition of existing fender components—treated wood, plastic lumber, and steel—as well as portions of the concrete skirt, followed by new construction including galvanic anodes, structural concrete with polymer fiber and RSC, precast concrete posts, stainless steel reinforcement, and miscellaneous metals. A new upper fender system will be installed featuring rubber fender units and Fiber Reinforced Polymer (FRP) panels, along with FRP walers and a new FRP drainage system, and stainless steel pipe handrailing. The work must comply with Caltrans Standard Specifications, PIANC performance data for fender systems, and federal regulations including the Clean Water Act and U.S. Army Corps of Engineers Nationwide Permit 15, with environmental protections for marine species and habitat required. All materials, particularly stainless steel and iron products, must be coated in the United States to meet Buy America provisions, and certifications of origin, mill test reports, and compliance documentation for all delivered materials are mandatory. Performance is expected to commence within 55 days of contract approval by the Attorney General, with a baseline Critical Path Method schedule submitted within 14 days of award. The estimated contract value is $110 million, with specific line items including mobilization, dispute resolution board meetings at $7,500 per session, and stainless steel reinforcing steel totaling 576,500 pounds. The Department of Transportation will conduct inspections and accept deliverables based on material test reports, performance verification data for rubber fenders, and submittal of the Stormwater Pollution Prevention Plan and Water Pollution Control Plan. Special requirements include a qualified safety representative with CSP, CIH, CHMM, or OHST certification, an asbestos survey before demolition, coordination with BCDC and USCG, and attendance at a mandatory prebid meeting. All proposals must be submitted via the Department’s Bidders Inquiries portal by the August 27, 2026 deadline, and the work will be performed exclusively at the Oakland, California location on the Bay Bridge’s west piers. Payment processing is electronic through Caltrans’ prompt payment system, with no formal contracting officer identified, but oversight is provided by a Contract Manager and Task

General Info

Replace fender system and concrete skirt on Bay Bridge piers with corrosion-resistant materials, FRP, stainless steel, and marine-safe designs.

Place of Performance

Oakland, CA, 94607, USA

Set-Aside

NONE

Documents

7

04-0W1404 California DOT Project Plans for San Francisco-Oakland Bay Bridge West Bay

PDF, High priority: read this firstproject-plans
High

Addendum No. 1 for 04-0V1404 San Francisco Highway Construction

PDF, High priority: read this firstamendment
High

Addendum No. 2 for Contract 04-0W1404 San Francisco Highway Construction

PDF, High priority: read this firstamendment
High

BCDC Permit No. M1987.042.08 Amendment No. 8 for Caltrans Maintenance

PDF, High priority: read this firstpermit
High

California Construction Wage Determination CA20260018

PDF, High priority: read this firstwage-determination
High

California DOT Bridge 34-0003 Demolition Plan Addendum 2

PDF, High priority: read this firstspecifications
High

Contract 04-0W1404 Notice to Bidders and Special Provisions for SF Highway Construction

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of California, Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
GORDON W. JEONG

Full Description

Show more
Bid #04-0W1404: The project consists of replacing the bridge fender system and modifying the concrete skirt on the west bay piers (W3, W4, W5, W6) of the San Francisco-Oakland Bay Bridge. Work includes demolition of the existing fender system (treated wood, plastic lumber, steel) and portions of the concrete skirt. New construction involves installing galvanic anodes, placing structural concrete (polymer fiber and RSC), furnishing and erecting precast concrete posts, and installing stainless steel reinforcement and miscellaneous metals. A new upper fender system with rubber fender units and Fiber Reinforced Polymer (FRP) panels, as well as FRP walers and a new FRP drainage system, will be installed. The scope also includes new stainless steel pipe handrailing. All work will be performed from marine-based equipment over the San Francisco Bay.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS