Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Connecticut was posted on June 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shady Lane Reconstruction

Closed
37514State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 10 hours ago

DEADLINE

in 26 days
NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Town of Durham is accepting sealed bids for the Shady Lane Reconstruction project until 9:00 AM local time on July 23, 2026. Bids can be submitted electronically via the designated internet bidding service or as hard copies delivered by mail or drop box to the issuing office. At the deadline, all received bids will be publicly opened and read aloud through a teleconference, allowing for transparency and public participation. The scope of work includes comprehensive roadway reconstruction involving full depth pavement, retaining wall installation, and storm drainage systems, all to be completed under a single prime contract. Bidders are required to submit proposals using a lump sum and unit price format as outlined in the bid documents, which are freely available for download from the project's online bidding service. The solicitation is managed by the DAS Procurement agency in Connecticut, with Nathan L. Jacobson & Associates, Inc. serving as the primary point of contact. The project location is in Connecticut, and all related materials and submission details can be accessed via the official bidding portal. This contract offers contractors an opportunity to work on a public infrastructure improvement initiative with a clearly defined bidding and award process governed by the state's procurement standards.

General Info

Durham seeks bids for Shady Lane Reconstruction by July 23, 2026, via electronic or mail submission.

Agency

Connecticut → DAS ProcurementView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CT, USA

Set-Aside

NONE

Documents

(1)

DAS - Invitation to Bid Shady Lane Reconstruction

PDFitb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
Contacts1 person available
OfficeCT, USA
Organization / Agency
Connecticut → DAS Procurement
View Agency Profile
Office AddressCT, USA
Contacts
Nathan L. Jacobson & Associates IncPrimary Contact

Full Description

Show more
Sealed Bids for Shady Lane Reconstruction will be received by the Town of Durham electronically via the internet bidding service or by hard copy via mail or drop box at the Issuing Office until 9:00 AM local time on July 23, 2026 at which time the Bids received will be opened and read aloud via teleconference open to the public. The Project primarily consists of full depth roadway, retaining wall, and storm drainage construction. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. Bidding Documents are available for free download from the Project’s bidding service webpage Bidding service homepage: http://www.bidexpress.com/businesses/27674/home

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 238220
New
SLED
Westside Classroom Building Boiler Replacement Project - Westside Campus
Solicitation # 2027-WCSU-ITB-002
Western Connecticut State University is soliciting bids for the replacement of a non-functioning boiler and associated equipment at the Westside Classroom Building on its Westside Campus in Danbury, Connecticut. The project requires the contractor to provide all labor and materials for the installation of a new in-kind boiler while ensuring a second existing boiler remains operational throughout the process. The contract is reserved for vendors holding a current SBE/MBE set-aside certificate from the State of Connecticut Department of Administrative Services. Award will be granted to the apparent lowest qualified bidder who meets all technical and qualification requirements. The project is supported by 350,000 dollars in state funding and is subject to strict state contract compliance, including the CT Department of Labor’s Prevailing Wage Rates. Specific spending allocation goals have been established, with an SBE goal of 10.45 percent (36,567 dollars) and an MBE sub-goal of 3.26 percent (11,398 dollars). Key requirements include a 10 percent bid bond at the time of proposal and performance and material bonds upon award. The installation must comply with ASME Boiler and Pressure Vessel Code, NFPA 31, BOCA, and NFPA 54 standards. Deliverables include a complete, code-compliant system with an 18-month warranty on general components and a 5-year warranty on the heat exchanger and burner. Bids must be submitted by October 13, 2026.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS