This Solicitation opportunity from Department Of Defense was posted on September 22, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the Shared Early Warning System (SEWS) under solicitation number FA8723-14-R-0005, managed by the Department of Defense at the Aflcmc Wi office located at Tinker AFB, Oklahoma. This sources-sought notice was posted on September 22, 2016, and is focused on identifying potential small business contractors capable of providing services classified under NAICS code 541512, which covers computer systems design services. A key update to the contract, dated September 10, 2015, includes a revision of the Point of Contact details, specifically updating the Contracting Officer's phone number, and formally designates the acquisition as a Small Business set-aside to encourage participation from qualifying small businesses.
The contract emphasizes the acquisition of early warning system capabilities, likely involving IT and system integration services critical to defense operations, with a strong preference for small business entities. Point of Contact for the solicitation is Ms. Natalia Buchanan, who can be reached via email at [email hidden] or by phone at [phone hidden]. The solicitation is part of the Department of Defense’s efforts to enhance early warning systems through streamlined acquisition processes, aligning with federal goals to support small business involvement in government contracting.
General Info
DoD seeks small businesses for Shared Early Warning System IT services under NAICS 541512.
PDF, High priority: read this first1 page · specifications
HighAI Summary for AFLCMC/HBQK H001 Key Personnel (FEB 2016): A draft clause specifying the requirements for five essential leadership positions under contract H001. It outlines the process for notifying the Contracting Officer and obtaining written consent before diverting or substituting key personnel.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Draft CLIN Structure: This document outlines a draft Contract Line Item (CLIN) structure for a procurement involving Foreign Military Sales (FMS) and U.S. support. It details various CLINs (e.g., 0001 through 2051) categorized by labor, travel, equipment, and surge requirements, specifying contract types such as CPIF, CPFF, FPIF, and T&M across multiple periods of performance (PoP) from 2017 through 2023.
PDF
PDF, High priority: read this first24 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 04 C1 PWS: Draft Performance Work Statement (PWS) dated 05 February 2016 for the Shared Early Warning System (SEWS) II Prime Contract Re-compete. This document specifically addresses Task Order 03 for Foreign Military Sales (FMS) case C1, focusing on operations, maintenance, support, and systems engineering for SEW architecture within the USCENTCOM Area of Responsibility.
PDF
PDF, High priority: read this first24 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 05 - C2 PWS: Draft Performance Work Statement (PWS) dated February 5, 2016, for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II). This document specifically addresses Task Order 04 for Foreign Military Sales (FMS) Case AE-D-DAA (C2), focusing on operations, maintenance, support, and system architecture migration within the USCENTCOM Area of Responsibility.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 06 - C3 PWS: Draft Performance Work Statement (PWS) dated February 5, 2016, for the Shared Early Warning System (SEWS II) Prime Contract Re-compete. This document specifically outlines the requirements for Foreign Military Sales (FMS) Case SR-DAC (C3) under Task Order 05, focusing on operations, maintenance, support, system architecture migration, and cybersecurity integration within the USCENTCOM Area of Responsibility.
PDF
PDF, High priority: read this first23 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 07: C4 Performance Work Statement: Draft Performance Work Statement (PWS) dated February 5, 2016, for the Shared Early Warning System (SEWS II) Prime Contract Re-compete. This document specifically outlines the requirements for Task Order 06 regarding Foreign Military Sales (FMS) Case KU-D-DAA (C4). The scope includes operations, maintenance, and support (OM&S), system architecture migration, systems engineering, installation, and cybersecurity for seven sites within the USCENTCOM Area of Responsibility.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 08 C7 PWS: Draft Performance Work Statement (PWS) dated February 5, 2016, for Task Order 07 under the Shared Early Warning System (SEWS) II Prime Contract Re-compete. The document outlines the scope of work for Foreign Military Sales (FMS) case C7, focusing on operations, maintenance, and support (OM&S) of SEW systems within the USCENTCOM Area of Responsibility, including systems engineering, cybersecurity, and program management requirements.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 09: SEWS II E1 PWS: Draft Performance Work Statement (PWS) dated 05 February 2016 for the Shared Early Warning System (SEWS) II Prime Contract Re-compete, specifically addressing Foreign Military Sales (FMS) Case IS-D-DAG (E1). The document outlines the scope of work including operations, maintenance, and support (OM&S), system architecture migration, systems engineering, and cybersecurity requirements for four main sites. It also details program management, task order management, and applicable DoD and Air Force publications.
PDF
PDF, High priority: read this first26 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 10: P3 Performance Work Statement: Draft Performance Work Statement (PWS) dated February 5, 2016, for the Shared Early Warning System (SEWS II) Prime Contract Re-compete. This document specifically outlines the requirements for Foreign Military Sales (FMS) Case P3, focusing on operations, maintenance, and support (OM&S) of the PACOM sponsored partner. Key tasks include migrating systems to a standardized architecture, systems engineering integration, cybersecurity implementation, and program management across Task Order 09.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 11 P4 PWS: Draft Performance Work Statement (PWS) dated 05 February 2016 for the Shared Early Warning System (SEWS II) Prime Contract Re-compete. This document specifically outlines the requirements for Foreign Military Sales (FMS) Case JA-D-DDM (P4) within the USPACOM Area of Responsibility, covering operations, maintenance, system migration, cybersecurity, and program management.
PDF
PDF, High priority: read this first14 pages · specifications
HighAI Summary for FA8723-14-R-0005 Attachment 12 - CDRL Instructions: Draft instructions dated February 5, 2015, for the Shared Early Warning System (SEWS II) Prime Contract Re-Compete (Solicitation FA8723-14-R-0005). This document provides detailed guidance on the preparation, submission, naming conventions (DIN), and government approval process for Contract Data Requirements List (CDRL) deliverables using DD Form 1423.
PDF
PDF, High priority: read this first13 pages · specifications
HighAI Summary for FA8723-14-R-0005 Attachment 17 - SEWS II Labor Category Descriptions: Draft document dated 05 February 2016 for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II). It defines generic labor levels (Principal, Senior, Journeyman, Entry) and provides specific education and experience requirements for various labor categories, including Business/Contracts Managers, Business Systems Analysts/Managers, Configuration Management Specialists, and Cybersecurity Specialists.
PDF
PDF, High priority: read this first24 pages · qasp
HighAI Summary for FA8723-14-R-0005 Attachment 18 - SEWS II QASP: Draft Quality Assurance Surveillance Plan (QASP) dated February 4, 2016, for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II). The document outlines the methods and procedures the Government will use to ensure services are delivered according to the Performance Work Statements (PWS), defining the roles and responsibilities of the Procuring Contracting Officer (PCO), Program Manager (PM), Contracting Officer's Representative (COR), and the Contractor.
PDF
PDF, High priority: read this first9 pages · specifications
HighAI Summary for FA8723-14-R-0005 Attachment 21: Transition Incentive Fee Plan: Draft Transition Incentive Fee Plan (dated 05 February 2016) for the SEWS II Prime Contract Re-compete (Solicitation FA8723-14-R-0005). The document outlines the Cost Plus Incentive Fee (CPIF) structure for transition CLINs, including target, minimum, and maximum fees, and a 80/20 government/contractor share ratio. It defines Quality Performance Indicators (QPIs) used to determine performance incentives, specifically focusing on Transition Plan Execution, and details the QPI assessment and adjudication process.
PDF
PDF, High priority: read this first14 pages · specifications
HighAI Summary for FA8723-14-R-0005 Attachment 22 - US Sustainment Incentive Fee Plan: Draft Incentive Fee Plan (IFP) dated February 5, 2016, for the Shared Early Warning System (SEWS II) U.S. Sustainment Task Order 0002. It defines the Cost Plus Incentive Fee (CPIF) structure, including target fees, share ratios (80/20), and the use of Quality Performance Indicators (QPIs) and 'No Fail' items to determine contractor profit and performance incentives.
PDF
PDF, High priority: read this first3 pages · supporting-documents
HighAI Summary for FA8723-14-R-0005 Attachment 23 - Associate Contractor Agreements: Draft document dated 5 February 2016 for the Shared Early Warning System (SEWS II) re-compete. It outlines the requirements for Associate Contractor Agreements (ACAs) when contractors must cooperate or share resources. It specifies the necessary content for ACAs, lists associate contractors (including Lockheed Martin and Ticom Geomatics), and mandates that the Contracting Officer review all ACAs before execution.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for FA8723-14-R-0005 Attachment 25: Mission Essential Plan (Draft): A draft Mission Essential Plan for the Shared Early Warning System (SEWS II) prime contract re-compete (Solicitation FA8723-14-R-0005). The document outlines requirements for the contractor to provide 24x7x365 support at the Centralized Distribution Facility (CDF), which is designated as a Mission Essential Function (MEF). It specifies that personnel must report to work during crises, natural disasters, or base closures to ensure continued operation of all Task Order tasks.
PDF
PDF, High priority: read this first2 pages · past-performance
HighAI Summary for FA8723-14-R-0005 Attachment 4 - Client Authorization Letter: Draft client authorization letter template for solicitation FA8723-14-R-0005 (SEWS II). This document provides a template for offerors to obtain consent from commercial customers to release past performance information to the Air Force Materiel Command for evaluation purposes.
PDF
PDF, High priority: read this first35 pages · rfp
HighAI Summary for FA8723-14-R-0005 Draft Section L - Instructions to Offerors: Draft Section L (Instructions to Offerors) for solicitation FA8723-14-R-0005 regarding the Shared Early Warning System (SEWS) Prime Contract Re-Compete (SEWS II). The document outlines program objectives for sustainment and operations, general submission instructions, proposal formatting requirements, page limitations, and administrative guidelines for offerors.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for FA8723-14-R-0005 Industry Day #2 Notification Amendment: Dated 22 January 2016, this amendment provides a notification regarding Industry Day #2 (18 Feb 2016) for the Shared Early Warning System (SEWS II) procurement. It specifies that one-on-one sessions will be restricted to Small Businesses eligible under NAICS code 541512.
DOCX
DOCX, High priority: read this first6 pages · past-performance
HighAI Summary for FA8723-14-R-0005 Past Performance Information Sheet: This document is Section L Attachment 01 of solicitation FA8723-14-R-0005 for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II). It serves as a Past Performance Information Sheet for bidders to provide historical performance data.
DOCX
DOCX, High priority: read this first6 pages · past-performance
HighAI Summary for FA8723-14-R-0005 Section L Attachment 02 - Past Performance Questionnaire: A Past Performance Questionnaire for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II), identified as Solicitation No. FA8723-14-R-0005, Section L Attachment 02.
PDF
PDF, High priority: read this first2 pages · past-performance
HighAI Summary for FA8723-14-R-0005 Section L Attachment 3 - Consent Letter: Draft consent letter dated February 5, 2016, for the Shared Early Warning System (SEWS II) Prime Contract Re-compete (Solicitation FA8723-14-R-0005). This document provides a template for joint venture partners and subcontractors to authorize the Government to disclose their past performance information to the prime contractor during the source selection process.
DOCX
DOCX, High priority: read this first31 pages · sow
HighAI Summary for FA8723-14-R-0005 Section L - Instructions to Offerors: Draft Section L (Instructions to Offerors) for the Shared Early Warning System (SEWS) Prime Contract Re-Compete (SEWS II), solicitation number FA8723-14-R-0005.
PDF
PDF, High priority: read this first35 pages · rfp
HighAI Summary for FA8723-14-R-0005 Section L - Instructions to Offerors: Draft Section L (Instructions to Offerors) for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II), solicitation FA8723-14-R-0005. The document outlines the program objectives for sustainment and OM&S, provides general submission instructions, formatting requirements, page limitations, and administrative guidelines for proposal volumes.
PDF
PDF, High priority: read this first22 pages · rfp
HighAI Summary for FA8723-14-R-0005 Section M - Evaluation Factors for Award: Draft Section M of solicitation FA8723-14-R-0005 for the Shared Early Warning System (SEWS II) prime contract re-compete. This document outlines the evaluation factors for award, specifying a trade-off source selection process based on Technical, Technical Risk, Past Performance, and Cost/Price. It details the relative importance of factors, where Technical is most important, and defines the specific subfactors for technical evaluation including Operations, Sustainment, and Program Integration.
PDF
PDF, High priority: read this first18 pages · rfp
HighAI Summary for FA8723-14-R-0005 Section M - Evaluation Factors for Award: Draft Section M of solicitation FA8723-14-R-0005 for the Shared Early Warning System (SEWS) Contract 2.0. This document outlines the evaluation factors for award, including technical ratings, past performance confidence assessments, and cost/price realism assessments. It details the source selection process, the relative importance of factors, and incorporated FAR/DFARS solicitation provisions.
DOCX
DOCX, High priority: read this first20 pages · sow
HighAI Summary for FA8723-14-R-0005 Section M - Evaluation Factors for Award: Draft Section M of Solicitation No. FA8723-14-R-0005 for the Shared Early Warning System (SEWS) Prime Contract Re-Compete (SEWS II). This document outlines the evaluation factors for award.
PDF
PDF, High priority: read this first22 pages · rfp
HighAI Summary for FA8723-14-R-0005 Section M Evaluation Factors for Award: Draft Section M of solicitation FA8723-14-R-0005 for the Shared Early Warning System (SEWS) Prime Contract Re-Compete (SEWS II). This document outlines the source selection process, basis for award (trade-off), and the evaluation factors and subfactors, including Technical (Operations, Sustainment, Program Integration), Past Performance, and Cost/Price.
PDF
PDF, High priority: read this first6 pages · sow
HighAI Summary for FA8723-14-R-0005 SEWS II Overarching Contract Scope: Draft Overarching Contract Scope dated February 5, 2016, for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II), solicitation FA8723-14-R-0005. The document defines the boundaries for sustainment, operations, maintenance, and support (OM&S) services, including program management, systems engineering, cybersecurity, mission system sustainment, on-site training, help desk monitoring, and project-based technical refreshes for both U.S. and Foreign Military Sales (FMS) activities.
PDF
PDF, High priority: read this first7 pages · sow
HighAI Summary for FA8723-14-R-0005 SEWS II Overarching Contract Scope: Draft Overarching Contract Scope (dated 15 December 2015) for the Shared Early Warning System (SEWS) Prime Contract Re-compete (SEWS II), solicitation FA8723-14-R-0005. The document defines the boundaries for support services including program management, systems engineering, mission system sustainment, and cybersecurity for both U.S. and Foreign Military Sales (FMS) activities.
PDF
PDF, High priority: read this first25 pages · sow
HighAI Summary for FA8723-14-R-0005 SEWS II Overarching Scope Document: Dated October 16, 2015, this document defines the overarching scope for the Shared Early Warning System (SEWS) II contract (FA8723-14-R-0005). It outlines the program's mission to provide ballistic missile launch early warning information to NATO and foreign partner nations. The document details the Contractor Logistic Support (CLS) requirements, including sustainment, migration, integration, and operational support, while describing the technical architecture involving GOTS/COTS components, data distribution networks, and information security controls.
PDF
PDF, High priority: read this first31 pages · sow
HighAI Summary for FA8723-14-R-0005 SEWS II U.S. Sustainment PWS: Draft Performance Work Statement (PWS) dated February 5, 2016, for the Shared Early Warning System (SEWS) II Prime Contract Re-compete, Task Order 02. The document outlines the U.S. Sustainment requirements, including operations, maintenance, and support (OM&S), system architecture migration, cybersecurity implementation, and technical assistance for situational awareness feeds across USCENTCOM, USPACOM, and USEUCOM areas of responsibility.
PDF
PDF, High priority: read this first7 pages · sow
HighAI Summary for FA8723-14-R-0005 Transition PWS: This document is the Transition Performance Work Statement (PWS) for the Shared Early Warning System (SEWS) Prime Contract Re-Compete (SEWS II), dated 5 February 2016. It outlines the requirements for a seamless 90-day transition of sustainment responsibility from the incumbent contractor (Lockheed Martin) to the new SEWS II contractor, including staffing, risk mitigation, asset transfer, and the execution of a Transition Plan.
PDF
PDF, High priority: read this first130 pages · rfp
HighAI Summary for FA8723-16-R-0005 Solicitation for SEWS II Support: Draft Request for Proposal (RFP) issued on February 5, 2016, by AFLCMC/HBQK for the SEWS II program. The document includes Standard Form 33 and a detailed schedule of CLINs for transition labor, travel, and base year U.S. support labor. It specifies a Cost Plus Incentive Fee (CPIF) contract structure and references a Transition Performance Work Statement (PWS) and an Overarching Contract Scope Document.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section J Atch 19 Draft DD Form 254: A draft Department of Defense Contract Security Classification Specification (DD Form 254) for solicitation FA8723-14-R-0005. The document outlines security requirements for the operation, maintenance, and support of the Shared Early Warning System (SEWS), specifying a Top Secret facility clearance and safeguarding level, as well as access requirements for COMSEC, Restricted Data, and Intelligence information.
PDF
PDF, High priority: read this firstspecial-notice
HighAI Summary for SEWS Bidders’ Library Instructions: Instructions for prospective bidders to gain access to the Shared Early Warning System (SEWS) Bidders’ Library. The document outlines a three-step process including contacting the Contracting Officer, completing a registration form with mandatory fields (Cage Code, DLIS JCP Certificate, etc.), and guidance on obtaining External Certification Authority (ECA) certificates for those without a CAC.
DOCX
DOCX, High priority: read this first1 page · special-notice
HighAI Summary for SEWS Bidders' Library Instructions (Rev 24Sep15): Revised instructions for prospective bidders to gain access to the Shared Early Warning System (SEWS) Bidders' Library. The document outlines a three-step process including contacting the Contracting Officer, completing a registration form with mandatory fields (Cage Code, DLIS JCP Certificate, etc.), and guidance on obtaining External Certification Authority (ECA) certificates for those without a CAC.
XLSX
XLSX, High priority: read this first100 pages · specifications
HighAI Summary for SEWS II Cost Workbook - Section J Attachment 24: A draft cost workbook and Work Breakdown Structure (WBS) for the SEWS II contract. It defines labor categories and activities for Program Management and Systems Engineering support, including specific allocations for various project codes (C-1 through P-4) and US funding.
PDF
PDF, High priority: read this first12 pages · specifications
HighAI Summary for SEWS II Draft WBS Dictionary: A draft Work Breakdown Structure (WBS) Dictionary for the SEWS II contract. It defines the labor and resource requirements for Program Management (WBS 1.1) and Systems Engineering (WBS 1.2), including specific allocations for various regional and functional support elements (e.g., CENTCOM, EUCOM, PACOM).
XLSX
XLSX, High priority: read this first1 page · specifications
HighAI Summary for SEWS-II IDIQ FY18-22 Draft CLIN Structure: A draft CLIN (Contract Line Item Number) structure for the SEWS-II IDIQ for Fiscal Years 2018-2022. The document details the pricing structure, including labor, travel, and materials across multiple task orders (TO-0001 through TO-5002), specifying contract types such as CPIF and Cost Reimbursement (CR) for transition and sustainment support.
PDF
PDF, High priority: read this first14 pages · q-and-a
HighAI Summary for SEWS II Industry Day #2 Consolidated Q&As: This document contains a consolidated list of questions and government responses following the second Industry Day for the Shared Early Warning System II (SEWS II) procurement. It addresses critical topics including transition risks, EVMS expectations, incentive fee structures, past performance evaluation criteria, small business requirements (including the 50% labor rule), and clarifications on Section L and M regarding proposal submissions and CLIN mappings.
PDF
PDF, Low priority1 page · q-and-a
LowAI Summary for FA8723-14-R-0005 SEWS II Industry Day #1 Q&A: Consolidated Questions and Answers from Industry Day #1 for the Shared Early Warning System (SEWS) Prime Contractor Re-Compete (SEWS II), dated 22 December 2015. The document provides updates to draft RFP materials, including the overarching scope, CLIN structure, and Sections L and M, following industry briefings and facility tours.
DOCX
DOCX, Low priority2 pages · industry-day
LowAI Summary for FA8723-14-R-0005 SEWS II Industry Day Agenda: Agenda and informational notice for the Shared Early Warning System (SEWS II) Industry Day #1 held on October 23, 2015, at Peterson AFB. The event aimed to provide industry stakeholders with an overview of the acquisition, facility tours, and the opportunity to comment on draft RFP documents, including the CLIN structure, PWS, and evaluation criteria.
DOCX
DOCX, Low priority2 pages · industry-day
LowAI Summary for FA8723-14-R-0005 SEWS II Industry Day Notification: Notification dated 23 October 2015 for the Shared Early Warning System (SEWS II) Prime Contractor Re-Compete Industry Day at Peterson AFB, CO. The document outlines the event schedule, registration requirements by 19 October 2015, attendance limits, security requirements for facility tours, and rules of engagement for prospective offerors.
PDF
PDF, Low priority1 page · presolicitation
LowAI Summary for FA8723-14-R-0005 SEWS II Solicitation Release Date Notice: Informational notice dated September 8, 2016, regarding the Shared Early Warning System (SEWS II) procurement. It notifies prospective bidders that the solicitation (FA8723-16-R-0005) is estimated to be released between September 16 and September 30, 2016, with a pre-proposal conference planned for approximately October 18, 2016.
PDF
PDF, Low priority1 page · presolicitation
LowAI Summary for FA8723-14-R-0005 SEWS Notice to Interested Vendors: Dated 12 February 2015, this notice provides an updated status of the Shared Early Warning System (SEWS) U.S. and Foreign Military Sales (FMS) Support contract recompete. It outlines a tentative timeline including an Industry Day in October 2015, a Draft RFP in December 2015, and a final RFP in March 2016. The notice indicates the solicitation is anticipated to be a Small Business set-aside under NAICS 541512.
PDF
PDF, Low priorityq-and-a
LowAI Summary for FA8723-14-R-0005 SEWS Recompete Information Sharing #1: Dated 15 July 2014, this document provides government responses to industry questions regarding the Shared Early Warning System (SEWS) Recompete (FA8723-14-R-0005). Key topics include the availability of a Bidder's Library, workload factor data, facility requirements for sustainment and testing, transition duration (30-60 days), and the potential for single or multi-award contracts starting October 1, 2016.
DOC
DOC, Low priority4 pages · rfi
LowAI Summary for FA8723-14-R-0005 SEWS Request for Information: Request for Information (RFI) regarding the Shared Early Warning System (SEWS) support for U.S. and Foreign Military Sales. The government is seeking industry feedback on a proposed transition from a single-award to a multiple-award IDIQ contract structure to stimulate competition and small business participation. Responses are requested by September 18, 2013, to assist in formulating the acquisition strategy for engineering and Contractor Logistics Support (CLS).
PDF
PDF, Low priority3 pages · rfi
LowAI Summary for FA8723-14-R-0005 SEWS Support RFI: Request for Information (RFI) issued on 17 November 2014 regarding the Shared Early Warning System (SEWS) U.S. and Foreign Military Sales (FMS) Support contract recompete. The Air Force is seeking industry input to shape its acquisition strategy, specifically targeting small businesses under NAICS 541512. The RFI requests feedback on a potential small business set-aside IDIQ strategy, draft evaluation criteria (Section M), past performance recency, and potential organizational conflicts of interest. Responses were due by 9 December 2014.
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from Jun 10, 2014 to Oct 20, 2014. NAICS code changed from 541512 to 541712.
Notice updated
Response deadline changed from Oct 20, 2014 to Dec 9, 2014. NAICS code changed from 541712 to 541512. The notice description changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
The response deadline was removed. Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed. The point of contact changed.
Notice updated
Set-aside removed. The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
The notice description changed.
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Link to Solicitation FA8723-16-R-0005: https://www.fbo.gov/index?s=opportunity&mode=form&id=fe5ebb0ceef70dcfef09649e8e38a7e0&tab=core&_cview=0 See attached Sources Sought notice PDF document. The purpose of this modification/amendment dated 10 September 2015 is to update the Point of Contact information, including updating Contracting Officer's phone number. Also, to indicate that this acquisition is a Small Business setaside.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.