This Solicitation opportunity from Colorado was posted on February 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Contract 25172.1 involves the design and construction of a 25 KW photovoltaic solar energy system at the Shaw Creek Rest Area in Denver County, Colorado. Managed by the Colorado Department of Transportation’s CPCS & Property Management, the project aims to install solar panels on the roofs of new buildings to promote renewable energy use at the site. The solicitation was posted on February 24, 2025, with a response deadline of March 26, 2025, and falls within a contract size range of $500,000 to $2,000,000. The project emphasizes sustainable infrastructure development and is part of Colorado’s broader efforts to incorporate renewable energy solutions into transportation facilities. Interested parties can contact Robert L Wilson via email for further information and access the solicitation details through the provided online link.
HighAI Summary for Shaw Creek Rest Area 25KW PV System Scope of Work: Scope of Work dated January 30, 2025, for a Design/Build contract to install a 25KW photovoltaic (PV) system at the Shaw Creek Rest Area (Project #25172) for the Colorado Department of Transportation. The document details technical specifications for solar panels and inverters, design and permitting requirements, installation coordination with the General Contractor, acceptance testing, and owner training.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shaw Creek Rest Area Redevelopment - Information for Bidders: Appendix A for the Colorado Department of Transportation project 25172 (Shaw Creek Rest Area Redevelopment). This document provides critical instructions for bidders, including bid form requirements, bid security (5% for bids over $50,000), 'or equal' submission rules, and the method for determining the lowest responsible bidder using additive and deductible alternates.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Shaw Creek Rest Area Solar - Appendix B - Bid Form: A formal bid submission form for the Colorado Department of Transportation project 25172 (Shaw Creek Rest Area Solar), dated February 24, 2025. The document outlines requirements for the base bid, including completion timelines, Colorado labor compliance (80%), SDVOSB certification, bid guarantees, and execution of contract documents.
PDF
PDF, High priority: read this firstbid-bond-form
HighAI Summary for Shaw Creek Rest Area Solar - Bid Bond Form: Appendix B1 of the Colorado Department of Transportation project 25172 (Shaw Creek Rest Area Solar), providing the required template for a Bid Bond. It specifies a guaranty amount of 5% of the total bid price and outlines the obligations of the Principal and Surety to ensure the proposal remains valid for 30 days post-opening.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Shaw Creek Rest Area Solar Design/Build - Advertisement for Bids: Advertisement for Bids (Notice 25172.1) issued by the Colorado Department of Transportation (CDOT) for the design and installation of a 25 KW photovoltaic (PV) system at the Shaw Creek Rest Area. Estimated contract cost is $70,000. The project requires a Design/Build Lump Sum Agreement and includes mandatory attendance at a pre-bid conference on March 12, 2025. Minimum requirements include specific contracting experience, bonding capability, and compliance with DBRA wage requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shaw Creek Rest Area - Specifications of the Rest Area Building: Technical specifications for the Shaw Creek Rest Area (CDOT # 25172), dated 01.27.2025, marked '100% For Construction'. The document provides a comprehensive Table of Contents covering multiple divisions including General Requirements, Concrete, Masonry, Metals, Thermal and Moisture Protection, Openings, Finishes, Specialties, Plumbing, HVAC, Electrical, Communications, Earthwork, Exterior Improvements, and Utilities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shaw Creek Solar - Appendix C - Direct Labor Burden Calculation: A required submission form for contractors and major subcontractors to calculate and disclose labor overhead percentages (taxes, insurance, pensions). This data is used to establish the labor burden for the contract's Exhibit A and for calculating future Change Order Proposals.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Shaw Creek Solar - Appendix D - Prevailing Wages: General Decision Number C020250001 (dated 02/07/2025) for building construction projects in various Colorado counties. The document specifies minimum prevailing wage rates and fringes for multiple labor classifications, including electricians, plumbers, carpenters, and ironworkers, in compliance with the Davis-Bacon Act and applicable Executive Orders.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Shaw Creek Solar - Appendix E - Contract Wage Compliance Form: A Colorado Department of Transportation (CDOT) Contractor Wage Compliance Statement for Project Number 25172 (Shaw Creek Rest Area Redevelopment). This document is a certification form used by prime contractors and subcontractors to verify weekly payroll compliance, fringe benefit payments, and adherence to applicable wage rates and apprenticeship programs under the Copeland Act.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Shaw Creek Solar - Appendix K - Construction Drawings: This document contains technical specifications and design parameters for the Shaw Creek Solar project. It includes detailed guidelines for the protection of existing vegetation (SM-2), including tree protection zones, wetland preservation, and erosion control, as well as specific design parameters for water systems (Qmax/Qavg) and pump specifications from Orenco Systems.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Shaw Creek Solar - Sample Design/Build Lump Sum Agreement (SC-8.0): A sample Design/Build Lump Sum (LS) Agreement (State Form SC-8.0) from the Colorado Office of the State Architect. The document outlines the legal framework for a design-build project, including performance of work, design services, contract sum, and signature requirements. It serves as a template for the State of Colorado to engage a Design/Build Entity for project execution.
PDF
PDF, Low prioritybond-form
LowAI Summary for Shaw Creek Rest Area Redevelopment - Appendix G - Labor and Material Bond: A standard Colorado Labor and Material Bond form for the Colorado Department of Transportation project 25172 (Shaw Creek Rest Area Redevelopment). The document outlines the legal obligations of the Principal and Surety to ensure payment to subcontractors and suppliers for labor and materials used in the contract.
PDF
PDF, Low priorityperformance-bond
LowAI Summary for Shaw Creek Rest Area Redevelopment - Performance Bond (Appendix F): A standard Performance Bond template for the Colorado Department of Transportation (CDOT) regarding Project No. 25172, Shaw Creek Rest Area Redevelopment. The document outlines the legal obligations of the Principal and Surety to ensure the faithful performance of the contract terms.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Shaw Creek Rest Area Redevelopment - Procedural Documents: A collection of procedural templates for the Colorado Department of Transportation project 25172 (Shaw Creek Rest Area Redevelopment). The document includes forms for Notice of Award, Notice to Proceed, Notice of Substantial Completion, Contract Close Out Final Punch List, and Notice of Approval of Occupancy/Use.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Contract 25172.1 pertains to the Shaw Creek Rest Area, focusing on the design and construction of a solar energy system. This project, located in Denver County, Colorado, is managed by CDOT CPCS & Property Management. The work involves designing and installing a 25 KW photovoltaic (PV) system, with the PV panels mounted on the roofs of new buildings.
More opportunities from Colorado Department of Transportation