Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Sheep Creek Water Co. - Six Underground Water Wells

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sheep Creek Water Company project involves the installation of six groundwater production wells in Phelan, California, to increase the potable water supply in accordance with State Water Resources Control Board Compliance Order No. 05-13-18R-002. The project consists of four concurrent wells and two backup wells distributed across three parcels. Most wells will be drilled to approximately 1,500 feet using reverse rotary drill units and equipped with above-ground pump motors on 10-foot by 10-foot concrete pads. Well 13 is specifically noted as being drilled to 1,925 feet with a 5-foot by 5-foot concrete pad. To mitigate noise for nearby residences, pumps will be housed in masonry block buildings, and no new landscaping will be installed to conserve water. On August 6, 2025, the State Water Resources Control Board approved the project, determining that it would not have a significant effect on the environment regarding water resources within its jurisdiction. This determination followed a review of the Initial Study and Mitigated Negative Declaration prepared by the Lead Agency, the County of San Bernardino, pursuant to the California Environmental Quality Act. While a mitigation monitoring and reporting program was adopted, no specific mitigation measures were mandated as conditions of approval. The project is managed through the State Water Resources Control Board and the County of San Bernardino, with technical oversight provided by the District Engineer.

General Info

Six groundwater wells drilled in Phelan, CA, to expand potable supply, complying with State Water Board order, no environmental impact.

Agency

California → San Bernardino County

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Cambria Road to the north and Elsinore Road to the south along Mescalero Road, within Phelan, CA, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Sheep Creek Water Company Groundwater Wells

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts3 people available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts
WEI CHANGDistrict Engineer
MAGDA GONZALEZSENIOR PLANNER
CHRIS CUMMINGSASSISTANT MANAGER

Full Description

Show more
Environmental Review Unrelated to Planning Project for six (6) proposed groundwater production wells to increase Sheep Creek Water Company’s (SCWC) potable water supply in compliance with the State Water Resources Control Board’s Compliance Order No. 05-13-18R-002. The wells are to be located on three different parcels; four (4) wells will run concurrently while the other two (2) will serve as backup wells. The wells will each be equipped with an above ground pump motor on top of an approximate 10-foot x 10-foot concrete pad. At each new well, the new pumps will be enclosed with a masonry block building to minimize exterior noise levels at the nearest residences (about 200 feet from each well site). To minimize onsite water consumption no new landscaping will be installed at any of the three well sites. At each of the well locations, the closest connection to SCWC’s system is within the adjacent roadways. Each well will be drilled to approximately 1,500 feet deep using a reverse rotary drill unit. Well #13 is located between Cambria Road to the north and Elsinore Road to the south along Mescalero Road, within Phelan, CA. The well is equipped with a submersible pump motor on top of an approximate 5-foot x 5-foot concrete pad. To minimize onsite water consumption no new landscaping is installed at the Well 13 site. Well 13 is drilled to approximately 1,925 feet deep using a reverse rotary drill unit. This is to advise that the State Water Resources Control Board (Responsible Agency) has approved the above-described Project on August 6, 2025, and has made the following determinations regarding the above-described Project: 1. The project will not have significant effect on the environment. This determination is Page 2 of 2 limited to the environmental effects as it relates to water resources within the State Water Board’s permitting jurisdiction as a responsible agency. 2. The State Water Board has considered the Initial Study, and MND prepared by the Lead Agency for the Project pursuant to the provisions of CEQA. 3. A mitigation monitoring and reporting plan/program was adopted by the State Water Board for the Project. 4. A Statement of Overriding Considerations was not adopted by the State Water Board for the Project. 5. Findings were made by the State Water Board pursuant to the California Code of Regulations Section 15091. 6. Mitigation measures are not made as a condition of the State Water Board’s approval of the Project. A record of Project approval is available to the general public upon request at the State Water Board, DDW office listed above. The Negative Declaration/Mitigated Negative Declaration is available from the Lead Agency.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS