Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Sheraton San Diego Hotel & Marina Bay Tower Exterior Improvements and Interior Common Area Refresh

Forecast
2024-026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A

Full Description

Show more
The proposed project would involve renovations at the Sheraton San Diego Hotel & Marina Bay Tower (Bay Tower Project) by SSD Holdings, LLC, in the city of San Diego, California. The proposed project would involve the rehabilitation of the existing pool and event lawn areas, including the refreshment of existing landscape areas, and a new publicly accessible seating and view area and improved path. Work to specifically complete the proposed project is outlined below: Pool and Event Lawn Proposed improvements to the pool and event lawn areas, which are located on the west side of the hotel, would consist of the following: · New furniture, fixtures, and equipment; · Refreshment of existing landscaping; · Replacement of existing artificial turf; · Replacement of existing fencing that would not exceed the existing fence height; · Installation of new fencing along the north side of the event lawn that would not exceed the existing fence height; · Replacement of light fixtures; · Replacement of the existing pool snack structure; o Replacement of existing 210 sf structure, with a new 260 sf structure in the same location o Placement of new footings, without change to existing foundational pad o Connection of plumbing to existing plumbing lines · Application of new finishes to existing cabana structures; · Resurfacing of the existing pool deck; · Installation of a new ADA ramp connecting the event lawn and pool areas; · Replacement of the existing wedding ceremony backdrop with one of the same size; and · Replacement of the existing arbor between the pool and event lawn areas with one of substantially the same shape and size. Public Seating area and Improved Path The proposed creation of a publicly accessible seating and view area, and improvements to the existing internal pathway adjacent to the pool and lawn area, would consist of the following: · Demolition of exiting lattice structure, which is currently utilized for storage and located at the northwesternmost corner of the property; · Removal of approximately 4 existing palm trees and replacement at a minimum 1:1 ratio with non-invasive species elsewhere onsite; · Creation of an approximately 650 square foot concrete pad area, extending off the existing concrete pathway between the path and the water; · Installation of benches within the concrete pad area and public access signs per District standards; · Widening of the concrete pathway from 5 feet to approximately 8-10 feet; · Reconfiguration of the western parking lot to accommodate widened pathway, including restriping and removal of parking median dependent on emergency vehicle access and stormwater requirements; and · If median is required to be removed, removal of approximately 20 existing palm trees within the median and replacement at a minimum 1:1 ratio with non-invasive species elsewhere onsite. The purpose of the creation of a publicly accessible seating and view area, and improvements to the existing pathway is to create new opportunities for enhanced public access in and through the leasehold. The new seating and view area would create a connection to the neighboring leasehold to the west that doesn’t currently exist, and would create a welcoming entrance into the Sheraton leasehold for members of the public. The proposed scope of the project would not involve the expansion of the existing spaces or event capacity, and would be limited to the existing footprint. The proposed renovations are anticipated to begin in Winter 2025/2026 and are anticipated to take approximately 4 months to complete. The laydown area would utilize approximately 34 parking spaces within the parking lot immediately south of the pool and event lawn areas. There would be no permanent loss of parking spaces as a result of the project. Due to its nature and limited scope, construction of the proposed project would generate a minor number of vehicle trips and would require limited use of equipment. Minimal truck trips associated with the removal of debris and transportation of materials are anticipated to be generated by the project. The proposed project would not result in a change in size, capacity, or operations of the hotel facility from that which is currently existing. Therefore, the Project would not result in impacts related to air quality, greenhouse gas emissions, and transportation and traffic. Furthermore, the Applicant would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater. In addition to the above-described work, in May 2025 the San Diego Unified Port District (District) became aware of certain work completed in 2025 through a staff site visit. The following work was completed without the benefit of District-issued permits or approvals at the project site: · Replacement of carpet, wallcoverings, and draperies; · Replacement of new furniture, fixtures, and equipment in the restaurant and lobby; · Electrical upgrades and replacements including lighting, sound systems, and cabling; · Remodeling of common area bathrooms; · Exterior painting at restaurant patio area; · Restoration of irrigations lines surrounding the restaurant patio area; and · Repurposing of a meeting room as the new fitness center. With the exception of exterior painting and restoration of irrigation lines, all work completed was on the interior of the existing building. The completed work did not involve the expansion of the existing spaces or event capacity, and were be limited to the existing footprint.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical system upgrades encompass HVAC, exhaust extraction, compressed air, and a full NFPA-compliant fire suppression system, alongside updated electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements involve paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, as well as hazardous materials abatement. The project has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Proposals are evaluated based on the lowest price for two primary line items: building renovation and paving work. Bidders must adhere to Davis-Bacon Act wage determinations and Buy American requirements. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The contract mandates strict quality control through a three-phase inspection process and requires a 20-year no dollar limit warranty on specific roofing components. All invoicing must be processed through Wide Area WorkFlow using specific NAVFAC forms.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 12 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This solicitation issued by J&J Contractors, Inc. seeks pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The scope of work is extensive, covering demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevators, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside project subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project aims to restore dormitory, administrative, medical, and dental areas across the first, second, and third floors following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, flooring replacement with a required 20-year warranty for Luxury Vinyl Plank, rubber wall base installation, electrical repairs, and vanity or cabinet replacement. All work must comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Prospective bidders must have attended a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract mandates Net 30 payment terms and requires subcontractors to adhere to Davis-Bacon Act labor standards, including specific minimum wage and paid sick leave requirements.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance, equipment clearances, and sealed penetrations are maintained. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive description of proposed work methods including project phasing and occupied-building protection, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100. Awardees must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD requires the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS