Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Special Notice opportunity from Department Of Agriculture was posted on May 27, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sherman Creek Bridge Replacement, Colville National Forest

Closed
1205G120R0009SNFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sherman Creek Bridge Replacement project in the Colville National Forest, located near Kettle Falls, Washington, involves the restoration and upgrade of a failing bridge on Forest Service Road 2000136 (Bangs Mountain Road) near the Canyon Creek Campground. This project includes replacing the existing treated timber bridge with a pre-fabricated steel structure, upgrading the adjacent trailhead parking area, and repaving the road from Highway 20 past the parking area. The scope of work covers stream diversion, structural excavation, removal and disposal of the existing bridge, installation of the new bridge, reshaping streambanks, embankment and roadway excavation, placement of riprap and barrier rocks, grading of the parking area, and hot mix asphalt placement. The contractor is responsible for providing all necessary management, labor, equipment, materials, supervision, and insurance, adhering to contract specifications and provisions, and using biobased products where feasible. This project is solicited under a HUBZone small business set-aside with NAICS code 237310, with estimated funding between $250,000 and $500,000. The period of performance is projected to begin on August 1, 2020, with completion expected by October 15, 2020. The solicitation is expected to be issued around March 1, 2020, with proposals due by March 31, 2020. A bid guarantee, along with payment and performance bonds, will be required from the awarded contractor. Funding is currently not available but anticipated for fiscal year 2020, and no awards will be made until funds are secured. The Government reserves the right to cancel the solicitation at any time without obligation to reimburse offerors. Potential offerors are encouraged to visit the project site to fully understand site conditions and scope of work before submitting proposals. The primary points of contact for this solicitation are Brian Johnson, the Contracting Officer, and Cathy E. Van Alyne for general inquiries.

General Info

Replace Sherman Creek Bridge with prefabricated steel, upgrade parking, repave road, HUBZone set-aside.

NAICS

23731

Place of Performance

Kettle Falls, WA, USA

Set-Aside

HZC

Documents

2
PDF, Low priorityother
Low
PDF, Low priority2 pages · special-notice
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

special-notice

Notice updated

The notice description changed.

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Colville National Forest
Contacts1 person available
OfficeCOLVILLE, WA, 99114, USA

Full Description

Show more
This project is currently being advertised as a seed project under solicitation 1205M620R0002, IDIQ Road Construction for Mt. Baker-Snoqualmie, Okanogan - Wenatchee and Colville National Forest. The CO on the contract is Brian Johnson at Sign up to see this detail. His number is Sign up to see this detail. Special Notice / Prospectus 1205G120R0009SN Sherman Creek Bridge Replacement Three Rivers Ranger District Colville National Forest The Three Rivers Ranger District on the Colville National Forest located in North Eastern Washington State plans to restore upgrade a failing bridge on Forest Service Road 2000136 Bangs Mountain Road near the Canyon Creek Campground. The proposal is estimated to be solicited during the winter/spring of 2019/2020. The project is located in Ferry County, Washington State. The site is approximately 12 miles west of Kettle Falls, WA. A georeferenced pdf map is attached to this notice. The replacement structure will be a pre-fabricated steel bridge. This project will also include upgrading a trailhead parking area adjacent to the bridge and re-paving the 2000136 road from the intersection of highway 20 past the trail head parking area. Improvements will consist of, but are not limited to, diversion of the stream, structural excavation, removal and disposal of the existing treated timber bridge, installation of the new bridge, reshaping of the streambanks, embankment and excavation of roadway approaches, placement of riprap and barrier rocks, grading of the adjacent trailhead parking area, and placement of hot mix asphalt. The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman's compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract. This procurement requires the use of Biobased products to the extent that such products are reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. The products should first be acquired from the USDA designated products categories. The period of performance for the contract is estimated to begin August 1, 2020 with a completion date of October 15, 2020. The project is currently estimated between $250,000 to $500,000. A bid guarantee will be required. The awarded Contractor will be required to provide a payment and performance bonds. Funding for this requirement is currently not available, but is anticipated for this fiscal year 2020. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation's closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred. This project will be advertised as a written request for proposals. Estimated issue date of the solicitation is on or about March 1, 2020. Proposals are estimated to be due March 31, 2020. The actual due date will be listed in the solicitation. This acquisition is 100% set-aside for HubZone small business concerns. NAICS code is 237310, size standard is $39.5 million. All responsible sources may submit a proposal which will be considered. An electronic copy of the solicitation will be posted at this site on the issue date. Notes: Potential offerors are encouraged to visit the units this fall to ascertain the extent of work involved and to satisfy themselves regarding all general and local conditions that may affect the price of their offeror to the extent the information is obtainable. The enclosed information is provided so that potential offerors will have an opportunity to visit the representative sites while they are still accessible. Some changes from this notice may occur from the actual solicitation, but the enclosed information is a representative of work to be done. In no event shall failure to inspect the site constitute grounds for a claim after the contract has been awarded (reference FAR Clause 52.236-27). For information about site location, please contact Lucy Reeves at the Colville National Forest Supervisor's Office at Sign up to see this detail. The Government assumes no responsibility for any understanding or representation concerning conditions made by any of its officers or agents prior to the execution of a contract, unless such understanding or representation the Government is expressly stated in a subsequent solicitation and contract. Funding for this requirement is currently not available, but is anticipated for this fiscal year 2020. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation's closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred. All inquiries concerning this potential project must be directed to me a Sign up to see this detail. You may also e-mail me at Sign up to see this detail.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS