Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 6, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Shoshone NF - NZ Fence

Awarded
AG-82X9-S-09-0129Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

2 days ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Solicitation AG-82X9-S-09-0129, issued by the USDA Forest Service Rocky Mountain Regional Office, is a Total Small Business Set Aside for the construction of the North Zone Fence on the Shoshone National Forest. The project scope is divided into three primary areas. At Dick Creek, the contractor will install three sections of three-strand, high-tension electric fencing totaling approximately 23,026 feet, along with braces, gates, and one cattle guard, while relocating an existing cattle guard. At Carter Mountain, the work involves reconstructing a three-strand barbed wire fence with a top rail on the north fence line to prevent sinking and relocating portions of the northeast and east exclosure sides to the west side of the road. Additionally, 500 feet of continuous fencing will be installed at the end of Forest Road 474.1V using government-furnished panels and posts. An alternate bid item is included for the Brown Mountain Campground, which requires replacing 490 feet of wood fence with two-rail steel pipe fencing. The contract estimated price range is between 25,000 and 100,000 dollars. Key technical specifications include the allowance of pre-manufactured cattle guards that meet HS-20 loading specifications. The solicitation process included amendments to extend the offer receipt date and clarify that an offer guarantee was not required. The project is managed by the Department of Agriculture and requires the contractor to provide most materials, except for the specific continuous fencing components provided by the government.

General Info

USDA Forest Service small business contract for North Zone Fence construction on Shoshone Forest.

Contract Value

$140,451.3

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CO, USA

Set-Aside

NONE

Award Issued Date

Documents

3
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 7:00 PM UTC to 5:00 PM UTC on Jun 17, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA
Contacts
David H. Johnson

Full Description

Show more
Scope of Contract The work shall consist of what is shown on the drawings, stated in the specifications and summarized below: 1.Dick Creek Fences: This work shall consist of furnishing and installing three strand, smooth wire, high-tension electric fence, braces, gates and one cattle guard. Fence construction is divided into three separate sections of approximately; 8,826 ft, 7,900 ft. and 6,300 ft. Also to include the removal and relocation of one cattle guard. 2. Carter Mountain Fences: The exclosure is a 3 strand barbed wire fence with a top rail. Posts and top rail are treated, >8 in diameter and are generally sound enough to be reused for this project. Any materials that need to be replaced will be provided by the contractor. The work to be done involves reconstructing in place the west half of the north fence line (see attached map). This part of the exclosure was built in a wet area and has gradually sunk into the ground. It cannot be moved as it was constructed on the Forest Service property boundary, and moving it to dry ground would place it on private land. Posts will be installed at ground level to prevent the fence from sinking in the future. The second aspect of the project is removing most of the northeast and east sides of the exclosure and reconstructing it on the west side of the road (see attached map). The first gate (in the northeast corner of the exclosure) will be removed. The second gate (in the southeast corner of the exclosure) will be retained along with enough fencing to tie into natural barriers preventing motorized vehicles from driving around the gate. This will be marked on the ground prior to initiation of contract work. Continuous Fence: Approximately 500 of continuous fencing will be installed at the end of Forest Road 474.1V to prevent motorized vehicles from going beyond the road's end (see attached map). Continuous fencing panels, wood posts, and hardware will be provided by the government and will be delivered on site. All other materials will be supplied by the contractor. 3. Brown Mountain Campground (Alternate Bid Item): This work shall include the removal and disposal of 490 feet of wood fence and the installation of 490 feet of two rail steel pipe fence and posts.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS