Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Connecticut was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sidewalk and Walking Trail Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utility installation involving tunneling, boring, jacking, and micro tunneling, as well as site work such as land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including storm water pollution prevention and waste management. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 6 days
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Sidewalk and Walking Trail Installation project is a subcontract opportunity managed by DAS Procurement for the state of Connecticut. The scope of work involves the construction of new concrete sidewalks and walking trails, with a strict requirement for ADA compliance and adherence to CT Form 819 standards. The project falls under NAICS code 237310, which pertains to highway, street, and bridge construction. Interested parties must submit their responses by the deadline of August 25, 2026, at 2:00 PM. The solicitation was officially posted on July 30, 2026, and further details or application processes can be accessed through the CTSource Bid Board portal.

General Info

Connecticut subcontract for ADA concrete sidewalks and trails. Deadline August 25, 2026.

Documents

This scope was carved out of BID 2027-02.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Stratford Arboretum - Ketcham Road & Philo Street

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → DAS Procurement
ContactsNo contacts available
OfficeN/A
Organization / AgencyConnecticut → DAS Procurement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Construction of new concrete sidewalks and walking trails with ADA compliance and CT Form 819 adherence.

More opportunities from Connecticut → DAS Procurement

Same awarding agency

NAICS: 238350
New
SLED
Copernicus Hall 5th Floor Door Replacement Project
Solicitation # 2027 03
Central Connecticut State University is seeking vendors for the Copernicus Hall 5th Floor Door Replacement Project under solicitation 2027-03. The scope of work involves the removal and replacement of existing doors and hardware on the fifth floor, primarily utilizing solid core prefinished wood doors and some hollow metal doors. The contractor is responsible for installing new hardware, preparing and painting door frames and hollow metal doors, and handling the removal and disposal of asbestos-containing material (ACM) door panels. Key deliverables include a detailed replacement schedule to ensure room security and the delivery of locksets to the CCSU Locksmith for programming. Performance is targeted for Spring Break 2027, with alternative windows during Winter Break 2026-2027 or off-hours. Contracts will be awarded to the lowest responsible qualified bidder based on factors such as past performance, integrity, and conformity to specifications. Bidders must provide a 10% bid bond, a current certificate of insurance naming CCSU as additionally insured, and a statement of qualifications including five institutional references. The project requires compliance with prevailing wage rates, OSHA safety training, and various industry standards including NFPA 80 for fire-rated units, ADA standards for accessibility, and ANSI/SDI A250.10 for steel surfaces. Payment is issued via invoice upon completion and sign-off by the Facilities Department.
Finish Carpentry Contractors

POSTED

about 5 hours ago

DEADLINE

in 29 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS