Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Sidewalk Repair - Bureau of Street Services (StreetsLA) Package No. 60

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Los Angeles, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Los Angeles
Contacts1 person available
OfficeN/A

Full Description

Show more
The Sidewalk Repair - Bureau of Street Services (StreetsLA) Package No. 60 project (Project) consists of the repair of existing sidewalks pursuant to the City of Los Angeles’ obligations under the Witlits Settlement Agreement (U.S. Dist. Court Case No. CV10-05782 CBM [RZX]). The scope of work is limited to the removal of the specific Americans with Disabilities Act (ADA) access barrier(s) and adjacent work for the purpose of barrier removal, as identified by requestor/resident with a disability, in accordance with the applicable accessibility requirements, including those required by the ADA. The beneficiaries of the Project include the public and local businesses. The Project includes the removal of two street trees: One at Site 7548 at 7942 N. Wish Ave and one at Site 6584 at 6511 W Olympic Blvd. Both need to be removed as part of the sidewalk repair which would require separate discretionary approval by the Bureau of Street Services, Urban Forestry Division or the Board of Public Works. Please see the project description continuation in the narrative for more details. The Bureau of Engineering IS / The Board of Public Works ? determined the project ject was exempt from the California Environmental Quality Act (CEQA) and approved the project on November 19, 202

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
SLED
Emerald Drive Complete Streets Project
Solicitation # 8357
The Emerald Drive Complete Streets Project (C.I.P. No. 8357) is a comprehensive roadway improvement initiative managed by the City of Vista, California, located between Timothy Place and Galbar Street in Vista and Oceanside. The scope of work involves the removal of existing asphalt concrete roadways, curb and gutters, sidewalks, dirt shoulders, and driveways, replacing them with new concrete sidewalks, ADA curb ramps, medians, bus pads, street lights, landscaping, irrigation, and traffic signage. A key feature of the project is the installation of six new roundabouts designed to manage traffic flow and divide lanes. The project is federally funded by HUD Community Project Funding (CPF) and requires strict adherence to federal labor standards, environmental regulations, and the Americans with Disabilities Act. The contract will be awarded to the lowest responsible bidder based on the total amount of the Base Bid Items. Bidders must submit their proposals electronically via the OpenGov Procurement portal by December 16, 2026. Required documentation includes a bid bond, performance and payment bonds, and certificates of insurance, all of which must be provided within ten working days of the Notice of Intent to Award. The project mandates compliance with the Greenbook Standard Specifications for Public Works Construction, the National Electric Code, and California Labor Code prevailing wage requirements. Construction must begin within ten working days of the Notice to Proceed, with punchlist items completed within twenty working days of the Engineer's notification. There is no specific set-aside status designated for this solicitation.
CITY OF VISTA

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
SLED
Construction Management, Inspection, And Quality Assurance Services For Hazel Avenue Interchange Project - Segment 1
Solicitation # 81820
The Sacramento County Community Services Agency is soliciting proposals for construction management, inspection, and quality assurance services for the Hazel Avenue at U.S. 50 Interchange Improvements Project – Segment 1. The scope of work includes the development of construction management and inspection plans, quality assurance sampling and testing for materials such as concrete and asphalt, and administrative support including the preparation of meeting agendas and daily inspection reports. The project requires adherence to Caltrans Local Assistance Program processes, AASHTO Audit Guides, and FHWA sampling and testing requirements. There is no set-aside status specified for this solicitation. Proposals must be submitted via the OpenGov Procurement portal by December 16, 2026. The selection process involves a multi-stage evaluation consisting of a technical proposal review and a shortlist interview. Technical evaluations are weighted based on personnel qualifications (30%), prior transportation project experience (25%), firm capabilities (20%), experience with public agencies (15%), and references (10%). The consultant is required to comply with the California Labor Code regarding prevailing wages and must provide all necessary personnel protection equipment and safety training for its staff. Invoices must be submitted via U.S. mail or personal delivery and must include the contract number, project name, and a detailed breakdown of services provided.
SACRAMENTO COUNTY Community Services Agency Community Development Department

POSTED

about 4 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
Safe Routes To School
Solicitation # PW 26-14
The City of El Segundo is soliciting bids for the Safe Routes to Schools project (Project No. PW 26-14), located in El Segundo, California. The scope of work involves the construction of public improvements in strict conformity with the project's plans and specifications, adhering to the latest edition of the Standard Specifications for Public Works Construction (Greenbook). The project requires compliance with ADA standards for ladder crosswalks and push button housings, and the contractor must obtain necessary Encroachment and Building/Safety permits. The City will award the contract to the lowest responsive bidder, calculated based on the lump sum base bid, unit prices, contractor delay damages, and accepted alternates. Contractors must comply with the State Labor Code, including the payment of prevailing wages for Los Angeles County and registration under Labor Code section 1725.5. Required insurance includes commercial general liability and automobile coverage on specific ISO forms. Bidders must provide a bid bond of at least 10% of the base bid, and the successful contractor must furnish both a faithful performance bond and a labor and material payment bond, each equal to 100% of the contract sum. Bids must be submitted in a sealed envelope to the City Clerk by December 16, 2026. There is no specified set-aside status for this solicitation.
City of El Segundo

POSTED

about 4 hours ago

DEADLINE

in 26 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS