Signal Pole Foundation Construction
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the excavation, formwork, rebar installation, and concrete pouring necessary to construct foundations for traffic signal poles, with strict adherence to structural and depth requirements such as a minimum depth of 7.5 feet. All work must comply with engineering specifications to ensure the stability and longevity of the signal infrastructure under varying environmental and load conditions. The project is classified as a subcontract under NAICS code 238210 and is managed by the New Mexico Department of Transportation, with performance limited to the San Juan area. The solicitation was posted and had a response deadline on August 21, 2026, indicating a tightly scheduled procurement process. The contractual obligations are focused solely on the foundational elements of the signal poles, excluding any associated signage, wiring, or above-ground installation.
General Info
Agency
NAICS
Place of Performance
San Juan, NM, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
