Silver Lake Restroom Roof Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Silver Lake Restroom Roof Replacement project involves the complete removal and replacement of a damaged timber-framed roof structure at the Silver Lake restroom, with damage stemming from winter conditions in 2023. The scope of work includes dismantling the existing roof framing while safeguarding all on-site amenities, disconnecting and salvaging ceiling-mounted electrical components, and then reinstalling them following reconstruction. The new roof must be built strictly in accordance with the provided plans and specifications to ensure structural integrity and compliance. This is a small business set-aside contract under the SBA program, designated for total small business participation, with the North American Industry Classification System code 238160. The solicitation, identified as 1240LT26Q0120, was posted on July 2, 2026, with proposals due by 11:00 PM Mountain Time on July 29, 2026. The contract is managed by the Unita-Wasatch-Cache National Forest under the U.S. Department of Agriculture, with performance taking place in Salt Lake City, Utah. Primary point of contact is Derrick A. Dodson, reachable at derrick.dodson@usda.gov, with Jason Day as the secondary contact at jason.day@usda.gov. The opportunity is posted on SAM.gov and is structured as a combined solicitation, open exclusively to qualified small businesses aiming to deliver a durable, code-compliant roof replacement in a high-use public facility.
General Info
Agency
NAICS
Place of Performance
Salt Lake City, UT, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
This project consists of removing and replacing the Silver Lake restroom timber framed roof
structure that was damaged in the winter of 2023. Work includes the removal of existing roof
framing, protecting in place all existing amenities, disconnecting, salvaging, reinstalling all ceiling
mounted electrical, and reconstructing the roof as shown on the plans and in the specifications.
