Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 30, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award

Awarded
FA2517-08-R-5002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Simplified Acquisition of Base Engineering Requirements (SABER) is a multi-award, indefinite delivery/indefinite quantity contract awarded to DWG & Associates, Olgoonik Specialty Contractors, LLC, and SB Construction, Joint Venture. With a total ceiling of 300,000,000 dollars, the contract provides maintenance, repair, design, and construction services across several Department of the Air Force installations, including Peterson AFB, Schriever AFB, Buckley AFB, the United States Air Force Academy, Cheyenne Mountain Air Force Station, FE Warren AFB, and Fort Carson. The initial performance period began on March 26, 2010, and runs through March 14, 2011, with four subsequent one-year option periods. The scope of work is comprehensive, covering diverse technical requirements such as utility monitoring and control systems, hydraulic elevators, masonry, active vehicle barriers, and air pollution control. Contractors must adhere to strict site-specific operational and security protocols for each installation, including specialized digging permits, historical preservation standards, and rigorous personnel access controls. Project management requirements mandate the submission of detailed Quality Control and Accident Prevention Plans, while pricing is structured using a coefficient schedule based on RS Means and e4Clicks software. All work must comply with federal and state environmental regulations and U.S. Department of Labor prevailing wage determinations for building, heavy, and highway construction across Colorado, Wyoming, and Nebraska.

General Info

Contract Value

$100,000

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

21 CONS/LGCA 580 Goodfellow St., Bldg. 1324 Peterson AFB, Colorado 80914-1648, COLORADO SPRINGS, CO, 80914-1648, USA

Set-Aside

NONE

Award Issued Date

Documents

124

Amend2 - Summary of Changes

DOC, High priority: read this first2 pages · amendment
High

Amend3 - Solicitation Amendment

DOC, High priority: read this first9 pages · amendment
High

Amendment 1 - SABER Services CLIN Updates

DOC, High priority: read this first3 pages · amendment
High

FA251708R5002 - SABER Services Solicitation

DOC, High priority: read this first67 pages · rfp
High

FA2517-08-R-5002 SABER Technical Specifications

PDF, High priority: read this first12 pages · specifications
High

FA2517-08-R-5002 Sample Client Authorization Letter

DOCX, High priority: read this first1 page · past-performance
High

FA2517-08-R-5002 Schedule of Material Submittals

XLSX, High priority: read this first1 page · specifications
High

FA2517-08-R-5002 Section 01 35 00 - Special Provisions for Airfield Work

PDF, High priority: read this first2 pages · specifications
High

FA2517-08-R-5002 Section 01 45 01 - Contractor's Quality Control

PDF, High priority: read this first4 pages · specifications
High

FA2517-08-R-5002 Section 01 55 06 - Security Requirements

PDF, High priority: read this first2 pages · specifications
High

FA2517-08-R-5002 Section 01 62 35 - Recycled / Recovered Materials

PDF, High priority: read this first3 pages · specifications
High

FA2517-08-R-5002 Section 01 62 35 - Recycled/Recovered Materials

PDF, High priority: read this first2 pages · specifications
High

FA2517-08-R-5002 Section 04 21 13 - Nonbearing Masonry Veneer/Steel Stud Walls

PDF, High priority: read this firstspecifications
High

FA2517-08-R-5002 Section 14 24 00 - Hydraulic Elevators

PDF, High priority: read this firstspecifications
High

FA2517-08-R-5002 Section 25 10 10 - Utility Monitoring and Control System

PDF, High priority: read this firstspecifications
High

General Decision CO080002 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision CO080002 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision CO080006 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision CO080009 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision CO080010 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision CO080016 - Colorado Residential Construction

PDF, High priority: read this firstwage-determination
High

General Decision NE080002 - Nebraska Heavy and Highway Construction

PDF, High priority: read this firstwage-determination
High

General Decision NE080012 - Nebraska Building Construction Wage Determination

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080006 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080009 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080011 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080011 - Colorado Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080012 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080012 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080013 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080013 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080014 - Colorado Highway Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080014 - Colorado Highway Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080015 - Colorado Highway Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number CO080016 - Colorado Residential Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number WY080002 - Wyoming Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision Number WY080005 - Wyoming Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision WY080001 - Wyoming Building Construction

PDF, High priority: read this firstwage-determination
High

General Decision WY080003 - Wyoming Heavy Construction

PDF, High priority: read this firstwage-determination
High

General Decision WY080003 - Wyoming Wage Determination

PDF, High priority: read this firstwage-determination
High

General Decision WY080005 - Heavy Construction Projects (Wyoming)

PDF, High priority: read this firstwage-determination
High

General Decision WY080009 - Wyoming Residential Construction

PDF, High priority: read this firstwage-determination
High

General Decision WY080009 - Wyoming Residential Construction

PDF, High priority: read this firstwage-determination
High

SABER Services Maintenance and Construction Solicitation

DOC, High priority: read this first67 pages · rfp
High

SABER Services - Maintenance, Repair, Design, and Construction

DOC, High priority: read this first67 pages · rfp
High

SABER Services Solicitation - Peterson AFB and Regional Sites

DOC, High priority: read this first67 pages · rfp
High

Section 01 00 00 - General Requirements (SABER)

PDF, High priority: read this first12 pages · specifications
High

Section 01 00 01 - Peterson Air Force Base Specific Requirements

PDF, High priority: read this first8 pages · specifications
High

Section 01 00 02 - Cheyenne Mountain Air Force Station Specific Requirements

PDF, High priority: read this first8 pages · specifications
High

Section 01 00 03 - Fort Carson Army Post Specific Requirements

PDF, High priority: read this first4 pages · specifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseAwarded
Posted

Sources Sought

Notice updated

Response deadline changed from May 1, 2008 to Jul 18, 2008. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 18, 2008 to Jul 31, 2008. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Jul 31, 2008 to Apr 9, 2009. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 11:30 PM UTC to 9:30 PM UTC on Apr 9, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Apr 9, 2009 to Sep 24, 2009. The notice description changed.

Notice updated

Response deadline time changed from 9:30 PM UTC to 7:30 PM UTC on Sep 24, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Sep 24, 2009 to Sep 29, 2009. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2517 21 Cons Bldg 350
Contacts2 people available
OfficePETERSON SFB, CO, 80914-1117, USA
Office AddressPETERSON SFB, CO, 80914-1117, USA
Contacts
Nathalie L. SnyderContracting Specialist SABER Acquisition
John J ReaChief of SABER Acquisition

Full Description

Show more
Synopsis of Award, Solicitation FA2517-08-R-5002, Simplified Acquisition of Base Engineering Requirements (SABER) DWG & Associates, Olgoonik Specialty Contractors, LLC, & SB Construction, Joint Venture, Colorado Springs, CO, are being awarded a $300,000,000 indefinite delivery/indefinite quantity contract to provide for the Simplified Acquisition of Base Engineering Requirements (SABER) construction contract for Peterson AFB, Colorado, Ft Carson, Colorado (to include Pinon Canyon, Bldg 20,000, and Pueblo Chemical Depot), Schriever AFB, Colorado, Cheyenne Mountain Air Force Station, Colorado, United States Air Force Academy, Colorado (to include Farish Memorial Recreation and Bullseye Auxiliary Airfield), Buckley AFB, Colorado, and FE Warren AFB, Wyoming (to include Missile Field). The work performed is maintenance, repair, design, and construction services. The Air Force can issue task orders totaling up to the maximum amount indicated above, although actual requirements may necessitate less than the amount above. At this time, $100,000 of the funds have been obligated for each contractor. Future funds will be obligated as individual task orders are issued. The initial performance period is from 26 March 2010 - 14 March 2011; there are four (4), one-year option periods of performance as well. Solicitation began April 2008 and negotiations were completed in March 2010. There were twelve (12) proposals received in response to the solicitation. The awardees are as follows DWG & Associates 2270 La Montana Way Suite 101 Colorado Springs, Colorado 80918 Olgoonik Specialty Contractors, LLC 121 South Tejon Street, Ste 1107 Colorado Springs, CO 80903 SB Construction, Joint Venture 512 E Brookside Street Colorado Springs, CO 80905

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS