Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Sir Francis Drake Boulevard Bridge Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sir Francis Drake Boulevard Bridge Replacement Project in Point Reyes Station, Marin County, California, aims to replace the existing bridge over Olema Creek with a new single-span, cast-in-place, post-tensioned concrete slab structure approximately 77 feet long. The new bridge will feature two 11-foot-wide travel lanes, six-foot-wide shoulders on each side, and two-foot-wide protective barriers along both edges, resulting in a total bridge width of about 38 feet, designed to enhance safety and accommodate current and future traffic needs. The project is being managed by Marin County with primary coordination through the Civil Engineer’s office at envplanning@marincounty.gov and the Project Manager at CirclePoint, reflecting a coordinated effort between county staff and external consultants. The announcement was posted on May 27, 2026, and all work will be performed at the existing bridge location with a zip code of 94956.

General Info

Replace 77-foot bridge in Point Reyes Station with wider, safer concrete structure for improved traffic flow.

Agency

California → Marin County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA, 94956

Set-Aside

NONE

Documents

(5)

SFDB Bridge Draft Initial Study/Mitigated Negative Declaration

PDFenvironmental-document

SFDB Bridge Replacement Project Notice of Completion

PDFnotice-of-completion

Sir Francis Drake Boulevard Bridge Replacement Project Natural Environment Study October 2024

PDFenvironmental-study

NOA Postcard for Sir Francis Drake Boulevard Bridge Replacement Project

PDFspecial-notice

Sir Francis Drake Boulevard Bridge Replacement Project SCH Summary Form

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Marin County
Office AddressN/A
Contacts
Vincent YanCivil Engineer
Juliet MartinProject Manager II

Interested Companies (1)

Show more
Circlepoint
Oakland, CA

Full Description

Show more
The project is located in the community of Point Reyes Station, in Marin County, California. The proposed project would replace the existing bridge over Olema Creek with a new single-span, cast-in-place, post-tensioned concrete slab bridge approximately 77 feet in length and accommodating two 11-foot-wide lanes, 6-foot wide shoulders in each direction, and new 2-foot wide bridge barriers in each direction, resulting in an approximate bridge width of 38 feet.

Similar Contracts

Same NAICS industry code