Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Site Barricading and Safety Signage Supply

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement with Pakistan Refinery Limited involves the supply and installation of site safety controls for pipeline projects. The scope of work requires the provision of hard barricades to secure the entire perimeter of excavated sites, along with the installation of safety signage placed at 50-foot intervals. All materials and installation methods must strictly adhere to PRL HSEQ and area standards to ensure site safety. The project is based in Pakistan and is categorized under NAICS code 561990. Interested parties must submit their responses by November 6, 2026, following the posting date of October 22, 2026. The primary deliverable is the complete setup of installed site perimeter barricades and safety signs as specified by the agency.

General Info

Subcontract for supplying and installing site safety barricades and signage for Pakistan Refinery.

Place of Performance

PAK

Set-Aside

NONE

Documents

This scope was carved out of Doc342008664.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPakistan Refinery Limited
ContactsNo contacts available
OfficeN/A
Organization / AgencyPakistan Refinery Limited
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs site safety controls for prime contractors on Pakistan Refinery Limited (PRL) pipeline projects. Provides hard barricades for the entire excavated site and installs safety signage at 50-foot intervals. All materials must comply with PRL HSEQ and area standards. Delivers installed site perimeter barricades and safety signs.

Similar Contracts

Same NAICS industry code

NAICS: 561990
New
WOJC - Fire Protection Systems Inspection, Testing, and Maintenance - December 1, 2026 to November 30, 2027
Solicitation # WOJC - Fire Protection Systems Inspection, Testing, and Maintenance (December 1, 2026 to November 30, 2027)
Education and Training Resources is seeking quotes for a subcontracting opportunity to provide comprehensive inspection, testing, and maintenance of fire protection and life safety systems at the Westover Job Corps Center in Chicopee, Massachusetts. The period of performance runs from December 1, 2026, through November 30, 2027. The scope of work includes annual inspections of fire alarm systems across 23 buildings, annual maintenance of automatic sprinkler systems in three specific buildings, annual flow testing for 21 fire hydrants, professional servicing of approximately 173 portable fire extinguishers, and semi-annual maintenance of kitchen fire suppression systems in two buildings. All services must comply with NFPA standards, the Massachusetts Comprehensive Fire Safety Code, and the Massachusetts State Building Code. Interested bidders must submit their proposals by November 6, 2026. A complete submission requires a detailed bid sheet with fee-for-services pricing, a proposed service schedule, Massachusetts state licensing, certificates of insurance, and a completed vendor packet including a W-9 and SAM.gov UEI number. The award will be based on the best overall value to ETR rather than the lowest price. The contract is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Compliance with the Service Contract Act, Davis-Bacon Act, and various FAR clauses regarding minimum wages and anti-lobbying is required. Final project closure is contingent upon the submission of all inspection reports, warranties, and a signed punch list.
Westover Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Pakistan Refinery Limited

Same awarding agency

NAICS: 237120
New
International
REPLACEMENT OF KWSC PIPELINE FROM KWSC VALVE PIT TOWARDS PRL 1000-RFT SECTION
Solicitation # Doc342008664
Pakistan Refinery Limited is seeking sources for the replacement of the KWSC pipeline from the KWSC valve pit towards the PRL 1000-RFT section. The scope of work involves comprehensive excavation and backfilling in various terrains, including concrete, soil, and rock, with a requirement for at least 25 manual test pits to identify underground utilities. Key technical specifications include backfilling compacted to 95% ASHTO dry density and the installation of heat or butt fusion joints in accordance with ASTM 2164. Additionally, the project requires the installation of an MS 16 inch diameter globe valve, which must be approved by the relevant PRL department prior to installation. The contractor is held to strict safety and quality standards, including the provision of hard barricades and safety signage every 50 feet, the use of steel scaffolding for shoring, and the installation of bores for dewatering. All machinery, cranes, and operators must be third-party certified. Evaluation of potential contractors will be based on company profile, corporate status, annual turnover, and proven experience within the oil and gas industry, including HSEQ competence and the availability of experienced staff and equipment. The final acceptance of the work is subject to the satisfaction of the Engineer or Client Representative following hydrotesting and a commissioning phase.
Oil and Gas Pipeline and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS