Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Site Excavation and Grading

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves site preparation activities for a columbarium structure, including clearing, grubbing, excavation, backfill, and grading to ensure proper construction readiness and accessible site layout. These tasks are critical to establishing a stable, level foundation and safe ingress and egress for the facility, complying with structural and safety requirements. The work is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and is issued as a subcontract by the State of North Carolina’s Construction Office. The solicitation was posted on July 20, 2026, with a response deadline of August 20, 2026, and performance will occur at an unspecified location within North Carolina. There is no set-aside designation specified, and detailed contact information for inquiries is not provided in the document.

General Info

Site preparation for columbarium under North Carolina subcontract, NAICS 237990, bid due August 20, 2026.

Agency

North Carolina → State of NC - Construction OfficeView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

NC, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → State of NC - Construction Office
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Carolina → State of NC - Construction Office
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Clearing, grubbing, excavation, backfill, and grading for the columbarium structure and site access.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a comprehensive upgrade of critical airfield infrastructure at the Port of Seattle, focusing on safety, efficiency, and compliance with modern aviation standards. It includes the replacement of aging airfield lighting circuits that exhibit low megger readings, alongside the installation of energy-efficient LED lighting fixtures and signage to enhance visibility and reduce long-term operational costs. Concurrently, failing pavement sections and essential utilities will be replaced to ensure structural integrity and reliability of airfield surfaces and underlying systems. Wildlife hazard mitigation efforts are also a central component, involving the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signs to deter birds, and the implementation of regrading and new storm drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, the contract requires the replacement of deteriorated flush fire hydrant access hatches to ensure rapid and unobstructed access for emergency response personnel. All work is coordinated under the umbrella of the AIRFIELD 2030 ALL PROJECTS initiative, managed by the Aviation Project Management Group within the Port of Seattle. The solicitation was posted on July 21, 2026, and is classified under NAICS code 237990 for other heavy and civil engineering construction. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone provided by the Port of Seattle. The project is forecasted and does not specify a set-aside type, indicating it is open to general competition without targeted socioeconomic preferences.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Jack Block Park Pier ReplacementThe contract involves the demolition of the existing end-of-life pier at Jack Block Park and the construction of a new pier structure, along with necessary repairs to the adjacent pier plaza. This project is being managed by the Port of Seattle under the Northwest Seaport Alliance and is classified under NAICS code 237990, indicating it falls within other heavy and civil engineering construction. The work requires careful planning and execution to ensure environmental compliance, safe removal of the aging infrastructure, and the installation of a modern, durable replacement that meets current safety and operational standards. Associated plaza repairs will complement the new pier to restore full functionality and accessibility to the public area. The solicitation is posted as a forecast with no assigned solicitation number or set-aside details, suggesting it is in the early planning phase for future bidding. Primary point of contact for inquiries is Yanet Maldonado, reachable via phone or email, with Valerie Huffman serving as the Project Manager for technical coordination. The place of performance is clearly identified as Jack Block Park, but specific city and state details are not provided in the data, implying the location is well known within the local context. Interested parties should monitor the official portal for future updates and formal solicitation release.
Northwest Seaport Alliance (NWSA)

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
2027 Airfield Project - Contract 2The contract involves comprehensive upgrades to the airfield infrastructure at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance with modern operational standards. Key work includes replacing airfield lighting circuits that exhibit low megger readings with new LED lighting fixtures and signs to improve visibility and reduce maintenance demands. Parallel efforts will address deteriorating pavement and critical utilities across the airfield to ensure structural integrity and uninterrupted service. Wildlife hazard mitigation measures are incorporated to reduce bird and animal risks, including the removal of turf edge dams along runways, taxiways, and access roads, installation of anti-perching devices on airfield signage, and the regrading of low-lying areas with new storm drainage infrastructure to eliminate ponding. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unimpeded access for emergency response personnel. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Moraa Omwega and Project Manager David Neds available for coordination. The solicitation was posted in July 2026 and is classified under NAICS code 237990 for other heavy and civil engineering construction, indicating a large-scale infrastructure initiative focused on airfield systems and public safety enhancements.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Həʔapus Park Redevelopment - ConstructionThe Həʔapus Park Redevelopment project, managed by the Port of Seattle through Waterfront Project Management, encompasses a comprehensive upgrade to enhance public access, safety, and environmental stewardship within the park. Key improvements include the installation of new restrooms, upgraded pathways and lighting, a boot washing station to prevent the spread of invasive species, dedicated dog-friendly amenities, wayfinding and interpretive signage to improve visitor experience, and a hand-carrying boat launch to support non-motorized water access. The construction will involve both upland and in-water activities, carefully phased to comply with environmental permitting requirements and to avoid disrupting tribal fisheries, with a target for substantial completion by the second quarter of 2028. All work will be scheduled to minimize ecological impact while ensuring timely delivery of the enhanced recreational facilities. The project is led by the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Julie Yun overseeing coordination and implementation. The NAICS code 237990 indicates it falls under other heavy and civil engineering construction, reflecting the complexity of the infrastructure upgrades. While no solicitation number is listed, the forecast was posted on July 21, 2026, suggesting active planning is underway with procurement to follow. The project’s design prioritizes cultural and environmental sensitivity alongside functional improvements, aiming to create a more inclusive and sustainable public space that honors local ecological and tribal contexts.
Waterfront Project Management

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Well Installation and Well Abandonment in Luray, VA (WIIN24-01_W&WA)The Virginia Department of Health is seeking qualified contractors to perform well installation and well abandonment services at 358 Lauck Lane in Luray, Virginia, under solicitation QQ-124393. This effort is part of a state-led initiative to ensure safe and compliant water infrastructure, requiring strict adherence to environmental and public health standards throughout both the construction and decommissioning phases. Proposals must be submitted by the deadline of July 30, 2026, at 10:00 PM EDT, and all work must be carried out in accordance with applicable Virginia regulations and technical guidance for drilling, casing, sealing, and abandonment procedures. The contract is issued under the SLED classification, indicating it is directed toward state, local, or educational entities, and is managed directly by the Virginia Department of Health. Angelica Cipara is the designated point of contact for inquiries and can be reached at 804-664-4748 or angelica.cipara@vdh.virginia.gov. All performance is expected to occur at the specified Luray location, and contractors must demonstrate proven experience in well drilling, compliance with state well codes, and proper documentation for abandonment activities. No set-aside provisions are specified, meaning the contract is open to all eligible bidders regardless of business size or category.
Virginia Department of Health

POSTED

about 14 hours ago

DEADLINE

in 10 days
View Details

More opportunities from North Carolina → State of NC - Construction Office

Same awarding agency

NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract pertains to environmental compliance and monitoring related to stormwater management, erosion control, and overall environmental protection during construction activities in North Carolina. It requires the contractor to implement and maintain systems and protocols that ensure adherence to state and federal environmental regulations throughout the project lifecycle, with a focus on mitigating sediment runoff, preserving water quality, and minimizing ecological disruption. The work involves ongoing monitoring, reporting, and corrective actions to maintain compliance with permitted conditions and to respond to environmental incidents in a timely and effective manner. The contract is structured as a subcontract with a North Carolina state agency, specifically the State of NC - Construction Office, and is classified under NAICS code 541620, indicating environmental consulting services. The solicitation was posted on July 17, 2026, with a response deadline of August 19, 2026. While specific locations and contact details are not provided, the performance is expected to occur across construction sites under the jurisdiction of the North Carolina agency. The contractor must be prepared to coordinate with state regulators, provide detailed documentation of compliance measures, and ensure that all environmental controls are integrated seamlessly into construction operations.
Environmental Consulting Services

POSTED

4 days ago

DEADLINE

in 29 days
View Details