Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Site Plan Review for Wireless Telecommunications Facility (Case. No. 2607-26 (TEL26-012))

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Long Beach is conducting a Site Plan Review, identified as Case No. 2607-26 (TEL26-012) and solicitation CE26-069, for the modification of a Verizon Wireless telecommunications facility located at 905 Atlantic Avenue in Long Beach, California. The project involves the removal of six existing antennas and six remote radio units, which will be replaced by three Ericsson AIR3283 antennas with integrated RRUs, three JMA Wireless MX08FHG865-8HG antennas, and three new RRUS 4490 units. All new equipment, including related cabling and mounting hardware, will be installed entirely within the existing church tower concealment element. This project is subject to a California Environmental Quality Act Notice of Exemption under Class 1 for Existing Facilities, as the modifications will result in no increase in height and no expansion of the existing equipment or lease area. The process is being managed by Planner Kevin Nguyendo of the City of Long Beach and Program Manager Emanuel Higgins of Tectonic Engineering. The forecast for this action was posted on October 1, 2026.

General Info

Place of Performance

Long Beach, CA, 90813

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Long Beach
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Long Beach
Office AddressN/A
Contacts
Emanuel HigginsProgram Manager

Full Description

Show more
Site Plan Review approval for modification of an existing Verizon Wireless telecommunications facility concealed within an existing church tower at 905 Atlantic Avenue. The project consists of removing six (6) existing antennas and six (6) remote radio units (RRUs), and installing six (6) new antennas (three (3) Ericsson AIR3283 antennas with integrated RRUs and three (3) JMA Wireless MX08FHG865-8HG antennas) and three (3) new RRUS 4490 units, together with related cabling and mounting hardware, entirely within the existing concealment element. No increase in height and no expansion of the existing equipment area or lease area is proposed.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Water Meter Gateway Tower
Solicitation # CIP PW 26-30
The City of Lathrop is soliciting bids for the Water Meter Gateway Tower project (CIP PW 26-30) located at 2908 Hemsworth Court, Lathrop, California. The project involves the construction of an 80-foot tall, self-supporting triangular lattice steel data transmission tower that is TIA-222-I compliant and capable of withstanding 110 mph wind gusts. The scope of work includes providing CA engineer-stamped plans, constructing a drilled concrete pier and pad, installing a city-furnished NEMA 3-rated equipment cabinet, and running electrical and communication conduits to a control hut. Additional site work includes asphalt removal and replacement and the installation of a traffic-rated concrete box. The facility is designed to support multiple gateway antennae for transmitting data from telemetrically-enabled water meters to City offices. The contract will be awarded to the lowest bidder based on the base bid price, with an engineer's estimate of 125,000 dollars. Work must commence within 10 working days of the Notice to Proceed and be completed within 40 working days. Bidders must provide a 10 percent bid bond, and the successful contractor must provide 100 percent performance and payment bonds, along with a 10 percent warranty bond. As a public works project, compliance with California Labor Code Section 1700 regarding prevailing wages is mandatory. Bids must be submitted in a sealed envelope to the City Clerk by October 20, 2026, and must include proof of current DIR registration. Progress payments will be processed monthly upon review by the project engineer.
City of Lathrop

POSTED

about 12 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS