Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Caltrans Encroachment Permit 02-26-6-BB-0397 for the CVIN, dba Vast Networks State Route 299 Middle-Mile Broadband Network Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

CVIN, doing business as Vast Networks, in coordination with the California Department of Technology and Caltrans District 2, is implementing the State Route 299 Middle-Mile Broadband Network Project in Modoc County. This initiative is part of a larger statewide effort mandated by Senate Bill 156 to establish an open-access middle-mile network, which serves as a foundational investment to increase the affordability and availability of high-speed internet for all Californians. The project specifically focuses on installing broadband infrastructure between post mile 56.4 and 57.20 to enable connectivity for third-party last-mile networks serving homes, businesses, and community institutions. The scope of work involves the installation of approximately 5,000 linear feet of broadband conduit and fiber optic cable, utilizing two 1.5-inch high-density polyethylene ducts buried at a minimum depth of 48 inches. Construction activities include the use of 5-inch cased bores for roadway crossings, the excavation of standard bore pits, and the installation of three poly/concrete vaults. Most work will be conducted within 30 feet of highway rights-of-way, primarily on existing paved surfaces and maintained shoulders. The project is governed by Caltrans Encroachment Permit 02-26-6-BB-0397 and has been granted a CEQA exemption under Public Resources Code Section 21080.51.

General Info

Agency

California → Caltrans, District 2 - Redding

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Mike StewartDirector of Marketing and Business Development

Full Description

Show more
CVIN, dba Vast Networks, in coordination with the California Department of Technology and the California Department of Transportation (Caltrans), proposes the installation of broadband infrastructure consisting of conduit, fiber optic cable, and vaults on State Route 299 between post mile (PM) 56.4 and PM 57.20 in Modoc County. This project would include the installation of approximately 10,000-miles of broadband infrastructure throughout California within the State Highway System, including Interstate routes. Due to the varied topography and locations of the 10,000-mile broadband infrastructure across the State of California, the design would be dependent on project site features. Work would include the installation of subsurface broadband conduit and fiber, the installation of network repeater hubs at approximately 50-mile intervals, as well as the installation of vaults (Pull, Splice, and Buried) at various locations. All work will take place within 30-feet of highway rights-of-way except where not feasible. The areas of project impact in most areas will be limited to the existing paved surfaces, disturbed shoulders, and maintained Caltrans right-of-way. Purpose: This Middle-Mile Broadband Network project will install the broadband infrastructure along the State Highway System (SHS) necessary to connect to a third-party operated Last Mile Broadband Network which will bring internet connectivity to homes, businesses, and community institutions. Need: In July 2021, California Governor Gavin Newsom signed into law Senate Bill (SB) 156 to create an open-access middle-mile network to bring high-speed broadband service to all Californians. The lack of available middle-mile broadband infrastructure has been a major issue in connecting California’s communities. The statewide open-access middle-mile network included in SB 156 is a foundational investment to ensure every Californian has access to broadband Internet service that meets the connectivity needs of today, and well into the future. This project intends to support providing critical statewide broadband infrastructure to enhance access to and increase the affordability of high-speed internet for all Californians. Scope of Work Work within the existing Caltrans right-of-way would include the following: • Placement of temporary traffic control devices and signage. • Removal of minor vegetation. • Install approximately 5,000 linear feet of broadband conduit and fiber optic cable, generally consisting of two (2) 1 ½-inch high-density polyethylene (HDPE) ducts, with a minimum depth of cover of 48 inches. • 5-inch cased bore would be used to cross Caltrans roadways. • Installation of underground fiber optic cable. • Excavation of bore pits planned within project limits. Standard bore pits typically measure 3 feet wide by 5 feet long by 4 feet deep. o Dewatering within and adjacent to bore pits would occur as necessary, with water removed from the site. • Anticipated installation of three (3) standard poly/concrete vaults measuring 3 feet wide by 5 feet long by 3 feet deep. • Application of temporary and permanent erosion control, as needed.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
Discovery Solar PV and Storage Project by Discovery Solar PV and Storage, LLC
Solicitation # PP24408
The Discovery Solar PV and Storage Project, managed by Discovery Solar PV and Storage, LLC, is a renewable energy initiative located on approximately 7,700 acres of privately owned land in southeastern Kern County, California, specifically near Mojave. The project is designed to generate up to 1,400 megawatts of solar energy and provide up to 8 gigawatt-hours of energy storage capacity. Key infrastructure includes photovoltaic solar modules, battery energy storage systems, a 230 kilovolt switchyard, up to three onsite collector substations, an operations and maintenance facility, and a generation-tie line connecting the facility to the existing Windhub Substation. The project has undergone an extensive environmental review process under the California Environmental Quality Act, including the preparation of a Draft Environmental Impact Report and consultations with the California Department of Fish and Wildlife and the Native American Heritage Commission. Key environmental considerations include the protection of special-status species, such as the western Joshua tree and Mojave desert tortoise, and the preservation of tribal cultural resources. The project is subject to prevailing wage requirements and community workforce agreements for construction exceeding one million dollars. Construction is scheduled in phases starting in October 2025, with system installation and building construction continuing through June 2027. Final approval was granted via a Notice of Determination issued by the Kern County Board of Supervisors on June 16, 2026.
Kern County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 237130
New
SLED
BLUE BIRD EXPANSION
Solicitation # PE-33552-NONST-2027-000000021
The Fort Valley Utility Commission is soliciting sealed bids from experienced and licensed contractors for a labor-only contract to construct the electric primary feeder system for the Blue Bird Expansion Project in Fort Valley, Georgia. The scope of work involves the installation of a 7.2 kV phase-to-ground and 12.47 kV phase-to-phase three-phase underground electric distribution system. Key components include the installation of underground primary cable and conduit systems, pad-mounted transformers, PME switchgear, primary metering equipment, terminating cabinets, vaults, pads, grounding, and the subsequent testing and commissioning of the system. The project supports a significant site expansion featuring a 918,390 square foot building and a 39,474 square foot building. Under this labor-only agreement, the Fort Valley Utility Commission will provide all major electrical materials, while the contractor is responsible for providing all supervision, qualified personnel, construction equipment, tools, transportation, and safety equipment necessary for completion. All work must adhere to ECG Construction Assembly Specifications, FVUC standards, NESC, OSHA, Georgia 811, and all applicable federal, state, and local regulations. A mandatory pre-bid meeting is scheduled for November 2, 2026, at 10:00 AM at 500 Anthoine Street, Fort Valley, Georgia, with a final response deadline for bids on November 10, 2026. The final completion date will be determined by Parrish Construction and Blue Bird.
Fort Valley Utility Commission

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
International
Electric Utility Construction & Maintenance Services
Solicitation # 2026-093
The City of Red Deer has issued Request for Proposals 2026-093 for Electric Utility Construction and Maintenance Services, focusing on overhead and underground distribution linework. The selected contractor will be responsible for installing, upgrading, and modifying electrical distribution infrastructure, ranging from major capital projects like feeder rebuilds and new residential subdivisions to supporting City crews during vacation seasons and emergency responses. The contract features an initial one-year term with the City holding sole discretion to extend for up to four additional years in one-year increments. While the solicitation establishes a framework for services, it does not guarantee a minimum contract value. Proponents are evaluated through a multi-stage process involving mandatory requirement reviews, rated criteria scoring, and potential interviews, with the highest-ranking proponent receiving the award. Evaluation categories include the River Crossing Project scope, summer and winter labor and equipment rates, company history, safe work practices, and quality manuals. Successful bidders must provide a performance bond via certified cheque or letter of credit and adhere to strict safety and quality standards, including compliance with the Alberta Electrical Utility Code and the Occupational Health and Safety Act. Key deliverables include project execution plans with Gantt charts, final sag tension records, and comprehensive closeout packages containing GPS survey data and installation inventory. All invoices must include purchase order numbers and separate GST, with standard payment terms set at 30 days from receipt.
City of Red Deer

POSTED

3 days ago

DEADLINE

in 29 days
View Details
NAICS: 237130
New
SLED
Power Delivery General Engineering Services
Solicitation # 20260925052
The City of Pasadena Water and Power Department is soliciting proposals under RFP 2026-RFP-0300 to establish a pool of qualified professional engineering firms for Power Delivery General Engineering Services. The contract aims to provide supplemental support for the operation, maintenance, and modernization of the electric power delivery system across six specific scope of work groups: substation design, SCADA/automation and control, system planning, civil and structural engineering, electric vehicle charging infrastructure, and renewable energy and energy storage. The resulting agreement will have an initial five-year term with three optional one-year extensions, with work authorized through individual task orders on a lump-sum or time-and-materials basis. Qualified firms must demonstrate at least five years of relevant experience and five completed projects within the last five years for each group they bid on, and staff must include engineers registered in the State of California. Proposals are due by October 22, 2026, and must be submitted electronically via the City's eProcurement Portal in two separate volumes: a technical proposal and a price proposal. Evaluation is based on a weighted system consisting of qualifications (35%), cost (20%), and preferences for local Pasadena businesses (5%) and certified small or micro-businesses (5%). Selected contractors must comply with California prevailing wage laws, ADA accessibility standards, and specific cybersecurity requirements for SCADA systems. Invoicing is managed through the City's Vendor Invoice Portal with a 30-day payment term.
City of Pasadena

POSTED

3 days ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS