Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Site Prep, Erosion Control, and Demolition

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves providing site clearing, demolition, and erosion control services for prime contractors working on dam projects for the Kentucky Division of Water, Energy and Environmental Cabinet. The scope of work includes the demolition of raw water lines, storm sewer infrastructure, concrete ditches, and principal spillway wingwalls, as well as the installation of erosion and sedimentation controls to ensure the site is fully prepared for construction. The project is managed under the Kentucky Department of Environmental Protection with a response deadline of September 17, 2026. Classified under NAICS code 238910, the contract focuses on delivering a construction-ready site through comprehensive site preparation and infrastructure removal.

General Info

Subcontract for site clearing, demolition, and erosion control for Kentucky dam projects.

Agency

Kentucky → Dept- Environmental ProtectionView Agency

NAICS

238910 - Site Preparation ContractorsView NAICS

Place of Performance

Other, KY, USA

Set-Aside

NONE

Documents

This scope was carved out of RFB-785-2600000643.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFB-785-2600000643-8 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyKentucky → Dept- Environmental Protection
ContactsNo contacts available
OfficeN/A
Organization / Agency
Kentucky → Dept- Environmental Protection
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site clearing, demolition, and erosion control for prime contractors on Kentucky Division of Water, Energy and Environmental Cabinet dam projects. Demolishes storm sewer infrastructure, raw water lines, concrete ditches, and principal spillway wingwalls. Installs erosion and sedimentation controls. Delivers a cleared site ready for construction.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
RFQ Removal of Blighted Structures
Solicitation # 27-112
The City of Syracuse, through the Neighborhood and Business Development agency, is soliciting proposals for the removal of blighted structures, typically involving 20 to 25 court-ordered or emergency demolitions annually. Projects must be executed according to City specifications, with asbestos removal performed by a licensed New York State contractor in compliance with NYSDOL Code Rule 56. Contractors must be capable of submitting variance petitions to the NYSDOL if structures are deemed unsafe for standard asbestos removal. All projects are subject to New York State Labor Law Article 8 regarding prevailing wage rates and the City of Syracuse Minority and Women Business Enterprise Participation Program. To obtain necessary demolition and deconstruction permits, contractors must provide an asbestos survey, abatement certificates or variance applications, a health certificate from Onondaga County verifying vermin elimination, and proof of workers' compensation insurance. Liability insurance requirements include a minimum of 3 million dollars in contractors liability insurance, with the City of Syracuse listed as a primary and non-contributory additional insured. For commercial buildings or residential units with five or more dwellings, approval from the City Zoning Office is required. The engagement is structured as a professional services agreement where work is performed on an as-needed basis via individual work orders with agreed-upon not-to-exceed amounts. Payments are issued monthly based on services performed, subject to a 5 percent retainage held until final approval by the City Engineer. Contractors must maintain general and professional liability insurance of at least 1 million dollars each, with policies remaining in effect for three years following final project acceptance. The City maintains audit rights over contractor records for three years post-termination.
Neighborhood and Business Development

POSTED

about 11 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Kentucky → Dept- Environmental Protection

Same awarding agency

NAICS: 237990
New
SLED
RFB-785-2600000643-8 | RFB-275-26 Willisburg Lake Dam Rehabilitation Project
Solicitation # RFB-785-2600000643
The Commonwealth of Kentucky Department of Environmental Protection is soliciting bids for the Willisburg Lake Dam Rehabilitation Project in Washington County, identified as RFB-275-26 or RFB-785-2600000643-8. The comprehensive scope of work includes the construction of a reinforced concrete auxiliary spillway and floodwall, the installation of rockfill stability berms, and the replacement of low-level drawdown valves. Additional requirements involve the remediation of concrete cracking and seepage, the abandonment and replacement of raw water intake lines, spillway culvert remediation, and various demolition, site preparation, and restoration activities. Contractors are also responsible for erosion control, traffic control, and the development of a contractor-designed water diversion plan. The solicitation process has undergone multiple modifications and addenda, with the final bid response deadline set for September 17, 2026, at 17:30. Bids must be submitted exclusively online, with the official bid document and bid bond combined into a single PDF file. Key technical constraints include a prohibition on driving piles into the dam embankment and the rejection of specific waterproofing material substitutions that do not meet puncture requirements. Notably, the project is exempt from domestic material requirements such as Buy America or American Iron and Steel. Primary contact for the project is Susan Ward, and the contract is managed through the Kentucky Department for Facilities and Support Services.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 11 days
View Details