Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on August 15, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Preparation and Tree Planting, Victoria Co., TX`

Awarded
AG-7442-S-08-0031Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115112
New
SLED
AS27-123 Central Utah Aerial Seeding Project Phase 1 - 2026
Solicitation # AS27-123
The State of Utah Division of Purchasing and the Division of Wildlife Resources are seeking a single contract award for the Central Utah Aerial Seeding Project Phase 1 - 2026. This Invitation for Bids aims to secure a responsive and responsible vendor to perform aerial seeding across three specific project areas: the Widemouth 2 Fire Rehab Project Phase I (3,964 acres), the Watts Mtn Phase II Project (2,210 acres), and the Tower Fire Aerial Seeding Project (206 acres), totaling 6,380 acres. The performance period is strictly scheduled from November 4, 2026, through November 16, 2026. Bids must be submitted on a cost-per-acre basis, and the award will be granted to the lowest total cost responsive and responsible vendor. Technical requirements mandate that aircraft be equipped with GPS for 100% coverage and maintain a maximum 80-foot seeding swath width to prevent stripping. The use of drones is strictly prohibited, and operations must be postponed if wind speeds exceed 10 miles per hour. Upon completion, the contractor must provide electronic coverage documentation in UTM projection North America Datum 1983. The contractor is responsible for securing flight operations from airports in Redmond, Fillmore, or Richfield, Utah. Administrative requirements include maintaining Commercial General Liability insurance with limits of $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation. Vendors must certify compliance with E-Verify, anti-boycott laws regarding the State of Israel, and various non-discrimination statutes. Invoices must be submitted within 30 days of delivery and will be paid within 30 days of receipt of a correct invoice. The State Entity reserves the right to inspect deliverables within 30 days of delivery to ensure conformity with the specified standards before final acceptance.
Utah

POSTED

6 days ago

DEADLINE

in 4 days
NAICS: 115112
New
SLED
Cherry Fire Aerial Seeding
Solicitation # CS27-114
The State of Utah Division of Purchasing, on behalf of the Division of Wildlife Resources, is soliciting quotes for aerial seeding services for the Cherry Fire project in Tooele County. The scope of work involves the application of a seed mix consisting of grasses, shrubs, and forbs across 4,651 total acres at elevations between 5,700 and 6,700 feet. Specifically, the contractor must apply seed at a rate of 12 lbs/acre over 704 acres of TLA lands and 18 lbs/acre over 3,947 acres of private lands. All work must be completed by November 11, 2026. Technical requirements include the use of GPS technology to ensure 100% coverage and a requirement to begin seeding by 8:00 a.m. to minimize drift, with the government reserving the right to postpone operations if wind speeds exceed 10 miles per hour. The contract will be awarded to the responsive and responsible vendor submitting the lowest cost, with bids required on a cost-per-acre basis. Selected vendors must maintain Commercial General Liability insurance of at least $1 million per occurrence and $3 million aggregate, as well as statutory Workers' Compensation insurance. Administrative terms specify that deliveries are F.O.B. Destination Freight Prepaid and Allowed, with a 30-day window for the state to accept or reject deliverables. Invoices must be submitted within 30 days of delivery, and payments are due within 30 days of invoice execution. Contractors must also comply with the Utah Government Data Privacy Act and certify compliance regarding anti-boycott actions, forced labor restrictions, and E-Verify registration for personnel employed in Utah.
Utah

POSTED

6 days ago

DEADLINE

in 1 day

General Info

Agency

N/A

Contract Value

$23,150

NAICS

115112 - Soil Preparation, Planting, and Cultivating

Place of Performance

James E and Ginger Fagan, Victoria County, TX, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Chip BurnetteContracting Officer

Full Description

Show more
Wetland Reserve Program Tree Planting Plan James E and Ginger Fagan Victoria County, Texas Soils: The predominant soils in the planting area are Aransas clay, frequently flooded, and Austwell Clay, frequently flooded. These soils are a dark gray to black clay that is poorly drained and very slightly acidic to alkaline. Surface runoff is slow and permeability is very slow. The sticky nature of these soils will make planting difficult if moisture conditions are not almost ideal. Tree Planting Specifications "Pre-planning" Conference: A pre-planting conference will be held between the contractor, owner (or agent) and the NRCS to discuss the planting operation. Planting will not begin before this meeting. Site Preparation: The perennial vegetation within the treatment area include native and introduced grasses such as Common Bermuda grass and Gordo bluestem. Forb and woody species such as Spiny Aster and Sump weed are also present. Site preparation will include spray treatments utilizing approved systemic herbicides such as Roundup and Rodeo according to label directions on existing vegetation by September 15, 2008. A second treatment may be required by October 22, 2008 in order to - cleanup any vegetation that did not respond to the first spray treatment. NRCS will determine the need for a second herbicide treatment, and will inform the contractor by 15 Oct 2008 if it is required. Tree Planting: Hardwood seedling will be hand or machine planted on a 12' x 12' spacing (303 trees per acre) on approximately 35 acres. The planting area, except the strips around water impoundment, will consist of one mix described below. Species: Refer to the attached restoration plan map and species list below. The tree planting contractor will be responsible for the ordering of the seedlings, their delivery to the site, their care, and, if necessary, cold storage. The species for most of the site are grouped as preferred and secondary. At least four species will be planted. Each preferred species will make up no more than 30% of the total mix, and each secondary species will make up not more than 10% of the mix. In addition, a separate mix will be used for the strips planted around water impoundments. The species to be planted along with approximate percentages depending upon availability are listed below: Preferred Species: Green ash 20%, Bur Oak 10%, Willow Oak 10%, Bald Cypress 20%, Cedar Elm 20% Secondary Species: Bitter Pecan 5%, Persimmon 5%, Hackberry 5%, Mulberry 5% Around Water Areas: Bald Cypress, Bitter Pecan The planting list is a guide to mixes that should be best suited for the site based on wetness, pH, etc. Flexibility with the mixes is expected. If substitution of species is necessary, those with equal or greater tolerance to the wetness will be chosen. It is also expected that there will be sites within the planting area that may be too wet for species selected. In these cases, wetness tolerant species should be used. Species Substitutions: If a substitution is necessary due to the unavailability of a species from the nursery, low counts in the bags, modifications of the planting plan due to unforeseen conditions, etc., a species will be selected that has an equal or greater tolerance to wetness than the originally selected one. Any substitution must be approved by the NRCS beforehand. Spacing and Planting Rate: Hardwood seedlings will be planted on 12' x 12' spacing (303 seedlings per acre). The number of satisfactorily planted seedlings must fall within 15% of this planting rate or 258 seedlings per acre. Areas along the shores of impoundments and natural slough and wet depressions will be planted with species listed above to the extent that the water depth will allow. In these areas, increase the spacing to 15' x 15'. If a shortage of seedlings should occur due either to low seedling count or a high cull rate, the NRCS may either: (1) require the original purchaser (as stated above) to procure additional seedlings or (2) adjust the planting rate and/or acreage. If, on the other hand, seedlings are planted closer than the above spacing, causing a shortage, the contractor will be responsible for additional seedlings needed to finish the planting. Species Mixes: Mixes will be achieved through "bag-mixes" and/or matching the species to the site. Unless otherwise specified in the Tree Planting Plan, row or block plantings of single mixes will be avoided. Further explanation will be provided at the pre-planting conference. Planting Dates: Unless otherwise specified, planting will be down between mid-December and late February. Seedling Quality: Seedlings will meet the standards listed below for quality: Minimum root collar diameter Minimum Height 16 Minimum root length 8 Minimum number of lateral roots 5 Condition Stiff and Woody Together, the contractor and the NRCS technician will open at least one bag of each species being planted to determine quality and count. The NRCS technician will discuss seedling quality with the contractor, and determine the need for modifying the planting plan or purchasing additional seedlings at this time. It will be the responsibility of the contractor to "cull" seedlings according to the above or agreed to standards during planting. Seedling Care: It is the responsibility of the contractor to assure proper care of the seedlings during the planting operation. Planting will begin immediately after receiving the seedlings. Although cold storage (34oF to 40oF) is preferred, storage of seedlings in structures of shaded areas is permissible provided the planting will be completed within 7 days and the seedlings will be kept moist and cool (but not allowed to freeze). Cold storage will be necessary if the planting will require more than 7 days after the receipt of the seedlings (but no longer than 3 weeks). It will be the responsibility of the contractor to secure cold storage. Only the number of seedlings that can be planted in a day will be taken to the site. These will be kept shaded and moist. Pruning: Roots: The tap roots may be pruned to the minimum length of 8". Lateral roots may be pruned to facilitate planting. Prune by pulling the laterals down along the tap root and cut to its (the tap root's) length. Prune only with shears or a sharp knife. Do not tear roots. Tops: Tops may be pruned to the minimum height of 16". Planting Methods: Seedlings will be hand planted using either a dibble or planting shovel that can produce a 10" or deeper planting slit or by the use of a tree planter.. Seedlings will be planted with the root collar slightly below the soil surface. Roots will not be balled, twisted or planted in a "j" or "u" shaped manner. Steps needed to ensure the compacting of the soil around the seedling, leaving no air pockets in the planting slit, will be taken. Consult with the NRCS representative before planting when optimum site and soils moisture and/or temperature conditions are not available. Quality Control The contractor will be ultimately responsible for quality assurance. Quality control will be explained during the pre-planting conference. In addition, NRCS representatives will be available during the first day of planting and will occasionally visit the site during planting. They will be available for consultation, but they will not serve as daily inspectors. It is the responsibility of the contractor to provide day to day oversight of the planting crews. NRCS will conduct an inspection at the completion of the planting to determine the acceptability of the planting. The attached "Tree and Shrub Planting Compliance Record (Seedlings)" will be used for certification.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS