Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Site Restoration and Decommissioning Planning

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract opportunity, issued by Imperial County in California, focuses on Site Restoration and Decommissioning Planning. The primary objective of the contract is to develop and certify comprehensive plans for the removal of equipment and the restoration of the site in the event that the facility is discontinued or decommissioned. The project will be performed in Holtville, California, 92250, and is categorized under NAICS code 562910. Interested parties can find further project details through the provided CEQAnet link.

General Info

Imperial County subcontract for site restoration and decommissioning planning in Holtville, California.

Agency

California → Imperial County

Place of Performance

Holtville, CA, 92250

Set-Aside

NONE

Documents

This scope was carved out of CUP #25-0004.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Conditional Use Permit #25-0004 / Variance #25-0001 / Initial Study #25-0012 Vertical Bridge Tower

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Imperial County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Develop and certify plans for removal of equipment and site restoration if the facility is discontinued or decommissioned.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key requirements include the provision of a Certified Industrial Hygienist for daily site visits and final clearance, the implementation of a detailed remediation plan featuring HEPA filtration and negative air pressure, and adherence to Indiana state regulations where they exceed federal standards. The contract is a single lump sum award based on best value, with evaluation weights assigned to price (60), quality (20), past performance (10), and schedule (10). Bidders must be small businesses or certified VOSB, SDVOSB, WOSB, or HUBZone entities and must possess a valid Indiana Contractor's License. Proposals must include a detailed cost breakdown, a timeline for substantial completion, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must start work within 14 days of the Notice to Proceed and maintain specific automobile and workers compensation insurance naming Adams and Associates, Inc. as an additional insured. Payment is issued on Net 30 terms, contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens.
Atterbury Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 11 days
View Details
NAICS: 562910
New
SLED
MPE Three Classroom Mold Abatement - Rooms 22, 23, 24
Solicitation # 01 (2026-2027)
The Montebello Unified School District is soliciting bids under RFQ No. 01 (2026-2027) for mold abatement services in three classrooms, specifically Rooms 22, 23, and 24 at MPE in Montebello, California. The scope of work includes the abatement process, cleaning of A/C systems, and the movement of furniture before and after the project. Contractors must utilize containment, three-stage decors, and negative air pressure, while maintaining CAL/OSHA safety standards and good housekeeping. All work will be monitored by a third-party consultant, and the contractor is responsible for any necessary re-cleaning if good clearances are not achieved. Regulated disposal must be accompanied by a manifest, and proper mold signage and yellow caution flagging are required on-site. Bids must be submitted by November 2, 2026, at 9:00 a.m. via the designated secure portal. The contract will be awarded to the best value bidder based on price, proven ability to comply with specifications, capability, and credibility, with a preference for local firms in the event of equal low bids. Requirements for submission include a Non-Collusion Affidavit and a Certificate of Workers' Compensation Insurance. The successful vendor must provide a minimum one-year warranty and maintain comprehensive insurance naming the District as an additional insured. Payment is due 30 days after the receipt of a correct invoice or acceptance of goods. The District reserves the right to terminate the agreement with 30 days' written notice or immediately upon failure to perform.
Montebello Unified School District

POSTED

about 7 hours ago

DEADLINE

in 5 days
View Details
NAICS: 562910
New
Federal
Testing & Inspecting, Preventative Maintenance, Corrective Repair, Emergency Repair, and Service Calls
Solicitation # 36C25727R0018
Solicitation 36C25727R0018 is a Firm-Fixed-Price, indefinite-quantity contract issued by the Department of Veterans Affairs for mold remediation and water intrusion services. This procurement is a total set-aside for VIP-listed Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 562910. The scope of work involves providing all labor, equipment, and supervision for emergency response, stabilization, and remediation of water intrusion events across multiple Texas locations, including Dallas, Garland, Bonham, and Grand Prairie. The contract is structured across three ordering periods from December 1, 2026, through November 30, 2029. The contractor must adhere to strict response time tiers, ranging from two hours for patient-critical areas to eight hours for administrative support. Performance is governed by ANSI/IICRC S520-2024, EPA guidelines, and VHA M3P standards, with a heavy emphasis on ICRA/PCRA workflows and OSHA 1910.134 safety compliance. Award will be based on a best-value determination evaluating technical approach, price, and past performance, rather than the lowest price. Proposals are due by November 18, 2027, and must be submitted in two separate PDF volumes, including a redacted technical version for evaluation.
257-NETWORK Contract Office 17 (36C257)

POSTED

about 8 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS