Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Conditional Use Permit #25-0004 / Variance #25-0001 / Initial Study #25-0012 Vertical Bridge Tower

Forecast
CUP #25-0004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Underwood Rd & Melon Rd, Holtville, CA, 92250

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts1 person available
OfficeN/A

Full Description

Show more
The applicant, Vertical Bridge, is proposing to construct a wireless communications facility (WCF), at the above-mentioned project location, which consists of a 120-foot unmanned monopole tower with a 10- foot lightning rod for a total height of 130 feet on a 1,600 sq. ft. leased, fenced area, on the northern portion of the subject parcel (APN) 045-600-017-000, owned by Jesus Diaz Gonzales. The proposed telecommunications tower will be erected, owned, and operated by Vertical Bridge (VB BTS 111, LLC). Vertical Bridge has committed to allowing the shared use of the tower for co-location of other antennas, where structurally, technically, physically, economically, and contractually feasible, with the cost of modifying the tower, if required, to be borne by the co-location company. The proposed telecommunications facility requires a Conditional Use Permit (CUP #25-0004) and a Variance (V #25-0001) to exceed the 60-feet height limitation for the A-1 (Light Agriculture) zone by 70 feet.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base course to a stabilized drainable base, and performing minor design adjustments to plans and specifications. The subcontractor is responsible for procuring all materials, managing waste disposal, and coordinating professional engineering and laboratory services for geotechnical design and roadway materials testing. The project includes rigorous material characterization tests such as California Bearing Ratio and Plate Load tests, with critical operations phased to allow for continuous subgrade adjustments. Work is primarily scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required. This solicitation is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone certified firms.
Parsons Corporation

POSTED

about 7 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Etihad Water & Electricity

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Solar Interconnection Grant
Solicitation # RFA-131767
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy, provides funding to public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. Established via Senate Bill 659 and House Bill 683, the program targets barriers to public-sector solar development by funding infrastructure upgrades, including transformers, relays, SCADA/telemetry, protection equipment, metering modifications, and necessary engineering services. Eligible projects may be behind-the-meter or front-of-the-meter and must be located at previously developed project sites. The anticipated period of performance ranges from 6 to 18 months. Applications must be submitted through the Virginia Energy Grant Portal by January 15, 2027. Awards are competitive and based on a 100-point scoring system that evaluates organizational summaries, project scope, readiness, interconnection details, and community benefits. Applicants must adhere to strict word counts and submit a master PDF and two Excel files. Grant recipients must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and final verification via equipment lists and photos. Payments are issued upon agency acceptance of work, with a potential 5% retainage for construction projects and a final audit before closing.
Virginia Department of Energy

POSTED

2 days ago

DEADLINE

in about 2 months
View Details
NAICS: 237130
New
SLED
Fiber to the Home Phase 2 - Rebid
Solicitation # 50010
The City of Hudson, Ohio, is soliciting bids for the Fiber to the Home Phase 2 Rebid, a capital improvement project focused on expanding fiber optic infrastructure. The scope of work includes the installation of approximately 49,000 lineal feet of 1.5-inch HDPE fiber conduit and 52,000 lineal feet of 2x1.5-inch HDPE fiber conduit using horizontal directional drilling. Additionally, the project requires the installation of 29,000 lineal feet of aerial fiber, 174,000 lineal feet of fiber optic cable of various strand counts, and the placement of underground fiber vaults and handholes. Bidders are required to provide pricing for labor only, and the work includes all necessary splicing, testing, clearing, grubbing, and site restoration to pre-construction conditions. The project is governed by the City of Hudson Engineering Standards and ODOT Construction and Material Specifications, with a substantial completion deadline of December 3, 2027, and final completion by December 17, 2027. Bidders must submit electronic proposals via Bid Express and provide a Statement of Bidder's Qualifications demonstrating at least three years of experience in similar projects. The contract mandates compliance with Ohio Revised Code Chapter 4115 regarding prevailing wage rates and requires the provision of bid, performance, and payment bonds, as well as a maintenance bond equal to 10 percent of the final contract price. Evaluation for award will be based on compliance with requirements, financial ability, and the responsibility and qualifications of the bidder.
City of Hudson

POSTED

3 days ago

DEADLINE

in 21 days
View Details
NAICS: 237130
New
SLED
On-Call Utility Civil Construction Services
Solicitation # CS 11-26-04
Alameda Municipal Power (AMP) is seeking on-call civil construction services to support its electric distribution system in the City of Alameda, California. The scope of work covers a two-year term and includes the installation, repair, and replacement of underground electrical and fiber conduits, utility boxes, transformer pads, and foundations, as well as surface restoration, excavation, and trenching. The contract is structured as a master agreement with a maximum combined not-to-exceed value of $1,000,000 across up to two on-call contracts, with specific work assigned via individual task orders. Awards are based on the lowest responsible bidder, with task orders generally awarded by lowest price, though AMP may consider expertise, performance history, and continuity of work. Bidders must demonstrate sufficient capacity, experience, and a satisfactory performance record, with a preference given to local businesses when labor quality and price are equal. Required submissions include a non-collusion declaration, a subcontractor list, and proof of DIR registration. The successful bidder must provide a full-time qualified superintendent on-site and adhere to prevailing wage requirements and strict safety standards, including specific shoring and bracing plans for excavations five feet or deeper. Financial security is required via a bid security of 10% of the maximum bid amount, while the awarded contractor must provide performance and payment bonds for 100% of the contract price. Technical acceptance is based on rigorous inspection criteria for various construction elements, including conduit alignment, base preparation for vaults, and compaction testing. Bids must be submitted electronically through the Bid Portal by December 17, 2026.
Engineering and Operations

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
SLED
Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)
Solicitation # 27-0075-RFQ-DB
Pinellas County is soliciting a design-build firm for the design and construction of a centralized microgrid and power distribution center at the County Solid Waste Disposal Complex in St. Petersburg, Florida. The project aims to consolidate and modernize electrical infrastructure by replacing multiple separate Duke Energy services with a unified system. Key components include the construction of a new switchgear building elevated above the 500-year floodplain, the installation of advanced overhead and underground distribution infrastructure, and the integration of Distributed Energy Resources, specifically a Waste-to-Energy facility and an estimated 5 MW floating photovoltaic array. All work must comply with the Florida Building Code, NEC, NESC, and IEEE 1547 cybersecurity requirements. The contract is structured in two phases: a design phase lasting between 274 and 365 days, followed by a construction phase lasting between 390 and 480 days. Award selection is based on a multi-phase evaluation of firm experience, past performance, and an oral presentation, with a total potential score of 200 points. The selected design-builder must provide a 5 percent bid bond for the Phase 2 base bid and 100 percent performance and payment bonds for the final lump sum price. Payments are made in arrears per the Local Government Prompt Payment Act with Net 45 terms. Final acceptance occurs after a project manager inspection and written certification that all work is defect-free and meets contract specifications.
SOLID WASTE

POSTED

4 days ago

DEADLINE

in 14 days
View Details

More opportunities from California → Imperial County

Same awarding agency

NAICS: 541620
New
SLED
Imperial County Lithium Valley Specific Plan
Solicitation # 2023120104
The Imperial County Lithium Valley Specific Plan (LVSP) is a comprehensive land use and zoning initiative authorized by Senate Bill 125 to develop lithium resources and renewable energy infrastructure within the Salton Sea Known Geothermal Resource Area. Spanning approximately 51,620 acres, the project aims to establish an environmentally conscious employment hub by streamlining the permitting process for geothermal energy production and lithium extraction, processing, and manufacturing. The plan introduces various land use designations, including Green Industrial, Manufacturing, Logistics, and Conservation, while incorporating an Agricultural Overlay to balance industrial growth with the preservation of prime farmland. This initiative is designed to support the national production of sustainable energy technologies, enhance local economic stability through excise and property taxes, and fund Salton Sea restoration and community benefits. The project is governed by a Program Environmental Impact Report (PEIR) and a Water Supply Assessment to ensure compliance with the California Environmental Quality Act and Senate Bill 610. Key operational requirements include a 40 percent local hiring goal for construction workers, the payment of prevailing wages, and strict adherence to Cal/OSHA and OSHA safety standards for hazardous materials and excavation. Environmental protections are prioritized through the use of qualified biologists for wildlife surveys, rigorous dust control measures, and the protection of sensitive cultural resources. The project involves extensive coordination with state agencies, including Caltrans for transportation impacts, the California Energy Commission for geothermal permitting, and the Department of Toxic Substances Control for hazardous waste management.
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 812930
SLED
Linn Parking & Storage Project (CUP #25-0015, MERG #00165, IS #25-0033)
Solicitation # CUP #25-0015, MERG #00165, IS #25-0033
The Linn Parking and Storage project, identified by Conditional Use Permit #25-0015, Lot Merger #00165, and Initial Study #25-0033, involves the expansion of a parking and storage facility located at 1624 Gateway Road in Calexico, California. The project will merge three contiguous parcels to create a 7.1-acre site designed to accommodate up to 140 trucks and trailers and 60 passenger vehicles. The facility will operate 24/7 with approximately eight employees and will include mini-storage units for receiving customer packages from delivery companies. The expansion aims to improve traffic circulation and site safety, with projected daily traffic of 60 trucks and 30 passenger vehicles accessing the site via Gateway Road. The project was approved on September 9, 2026, following an environmental review that resulted in a Negative Declaration under the California Environmental Quality Act. Construction is scheduled to begin on June 2, 2026, with a phased timeline including demolition, site preparation, grading, building construction, paving, and architectural coating, concluding in late November 2026. Key requirements include compliance with Imperial County Fire Department standards, the installation of fire-rated access roads and water systems, and the submission of hazardous material management plans. The applicant is responsible for all costs related to land acquisition, infrastructure relocations, and the payment of water, sewer, benefit impact, and traffic mitigation fees prior to the issuance of building or grading permits.
Parking Lots and Garages

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
The Towers LLC (CUP26-0006/IS26-0007)
Solicitation # CUP26-0006
The Towers, LLC is proposing the construction of a Wireless Communication Facility in Niland, California, located at 307 E. Winslow Rd. The project consists of a 120-foot-tall, non-reflective, galvanized sky-blue monopole tower and related equipment situated within a 50-foot by 50-foot leased and fenced area. The primary objective of the facility is to enhance Verizon's 5G and 4G LTE coverage in the Calipatria area, specifically along Highway 111. The installation includes a 6-foot chain-link fence for equipment screening, internal cabling, FAA-compliant aircraft warning lighting, and an adjacent IID transformer, while water and sewer services are not required. The project is managed under Conditional Use Permit CUP26-0006 and Initial Study IS26-0007 by the Imperial County Planning and Development Services Department. An environmental review conducted under CEQA guidelines resulted in a Negative Declaration, concluding that the project will not have significant environmental effects. The Imperial County Planning Commission approved the project on September 9, 2026, with a Notice of Determination filed on September 17, 2026. Key regulatory requirements include compliance with FCC RF exposure standards, National Electrical Code standards, and the ability to support the co-location of two additional carriers. The applicant has requested a 10-year permit term and is subject to site restoration requirements and potential public benefit agreements with the Imperial Valley Emergency Communication Authority.
Power and Communication Line and Related Structures Construction

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 624229
SLED
NHHA (National Healthcare & Housing Advisors) CUP#26-0001, IS#26-0001
Solicitation # CUP26-0001
The applicant, National Healthcare & Housing Advisors, LLC, has requested a Conditional Use Permit to operate an Interim Recuperative Care and Transitional Housing facility within the Imperial Center Specific Plan Area, asserting that the proposed use is functionally analogous to an extended-stay hotel with integrated social services—a use already recognized under the plan. The facility will span approximately 27,000 square feet across two buildings, divided into three 9,000-square-foot suites, and will serve 80 to 100 clients while employing up to 50 local staff members. Operations will run continuously, 24 hours a day, seven days a week. Services include day habilitation, post-hospitalization recuperative care, behavioral health support, community health worker programs, a sobering center, enhanced care management, and street medicine, all aligned with NHHA’s CalAIM program aimed at achieving permanent housing stability for participants. Clients may receive services for an initial 90-day recuperative period, with the possibility of extending housing support for an additional six months. The project falls under the same regulatory review framework applied to hotels and transitional housing in the area, and its approval hinges on securing the conditional use permit, designated as CUP#26-0001.
Other Community Housing Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 221116
SLED
CUP23-0020/IS23-0026-Dogwood Geothermal Energy Project
Solicitation # GEO Heber Field Co. 2 Wells 06052026
The Dogwood Geothermal Energy Project is located on approximately 125 acres about one mile south of Heber in Imperial County, California. The project encompasses the construction and operation of a geothermal plant, associated facilities, a geothermal fluid pipeline, and solar energy facilities, including a 15 MW solar facility and a 7 MW parasitic solar facility. The scope of work specifically involves the installation of geothermal production and injection wells, which includes preparing well pads, drilling and completing the wells, and connecting them to the pipeline network. Under solicitation GEO Heber Field Co. 2 Wells 06052026, CalGEM has approved permits for Heber Field Company to install two specific geothermal wells, identified by API numbers 02591586 and 02591587. The project is governed by the California Environmental Quality Act and is based on an Environmental Impact Report prepared and certified by the Imperial County Planning and Development Services in August 2025. Final approval for the project was granted by the Imperial County Board of Supervisors on August 5, 2025, with subsequent permit approvals from the California Geologic Energy Management Division issued on June 5, 2026. The project site is located at 855, 853, and 602 Dogwood Road, Heber, CA, and must adhere to all adopted mitigation measures and monitoring plans specified in the environmental documentation.
Geothermal Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02518/IS25-0022
Solicitation # PM#02518/IS#25-0022
Parcel Map #02518 and Initial Study #25-0022 involve the subdivision of an 8.83-acre agricultural property located at 604 W. Murphy Road in Imperial, California. The project, proposed by Josh Quintero and overseen by the Imperial County Planning and Development Services Department, aims to divide the land into four legal parcels to separate an existing shop and facilitate residential development. Parcel 1 will be approximately 4.85 acres, while Parcels 2, 3, and 4 will each be approximately 1.33 acres. Access to Parcel 1 and 4 will be via Murphy Road, and Parcels 2 and 3 will be accessed via Nance Road. The project has been processed under the California Environmental Quality Act, resulting in a Negative Declaration and a Notice of Determination stating that the subdivision will not have a significant environmental effect. Technical requirements include a parcel map prepared by a licensed California Land Surveyor or Civil Engineer using the North America Datum of 1983. Infrastructure mandates include the installation of an approved water supply for fire flow per California Fire Code, the construction of three driveways on Nance Road, and the installation of non-contiguous sidewalks. Additionally, the project requires a grading and drainage plan to prevent cross-parcel drainage and may necessitate financial security, such as a road improvement bond or letter of credit, for off-site improvements. Final recordation of the map is contingent upon providing a tax certificate and a subdivision guarantee.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Heber 1 Parasitic Solar Energy ProjectThe Heber 1 Parasitic Solar Energy Project involves the development of a 20 megawatt solar energy facility and an interconnecting medium voltage cable line in unincorporated Imperial County, California. The facility is designed as a behind-the-meter system to provide parasitic load power to offset the auxiliary load of the existing Heber 1 Geothermal Plant, meaning it will not connect to or generate power for the transmission grid. The project will be located on approximately 121.44 acres of land, including a 106.19-acre solar field and a cable route of approximately 15.25 acres. Construction is anticipated to take 16 to 19 months starting in late 2025, spanning site preparation, project construction, and switch development and interconnection. The project is subject to a Conditional Use Permit and comprehensive environmental review under the California Environmental Quality Act. Key requirements include compliance with fugitive dust regulations, the implementation of a Water Quality Management Plan, and the execution of a Stormwater Pollution Prevention Plan. Extensive biological and cultural assessments have been conducted, including surveys for western burrowing owls, bat acoustics, and avian populations, as well as tribal cultural resource consultations. The project requires the use of approved botanical field surveyors and the implementation of a mandatory education program for all construction personnel. Additionally, the project applicant must participate in the Imperial County Public Benefit Program and enter into a public benefit agreement to cover associated costs and fees.
Solar Electric Power Generation

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS