Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Site Survey and Soil Analysis

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the New York Department of Environmental Protection involves providing specialized site survey and soil analysis services for green infrastructure projects within NYC Parks. The scope of work requires the selected contractor to perform soil sampling and analysis in accordance with Section 02 24 20, conduct hazardous material assessments per Section 02 26 00, and carry out test pit investigations. The primary deliverables include comprehensive soil analysis reports and detailed hazardous material assessment documentation. The project is categorized under NAICS code 238910 and will be performed within New York City. Interested parties should note that the solicitation was posted on November 4, 2026, with a response deadline set for January 6, 2027. This role serves as a support function for prime contractors managing these environmental and infrastructure initiatives.

General Info

Place of Performance

New York, NY, USA

Set-Aside

NONE

Documents

This scope was carved out of 82627B0011.

The full solicitation package (10 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

82627B0011-BEPA: GI-CONS-6: Installation of green infrastructure at various NYC Parks in Queens and Brooklyn

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → Department Of Environmental Protection
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site surveys, soil sampling, and hazardous material assessments for prime contractors on NYC Parks / DEP green infrastructure projects. Conducts soil sampling and analysis per Section 02 24 20, hazardous material assessment per Section 02 26 00, and test pit investigations. Delivers soil analysis reports and hazardous material assessment documentation.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
City of Livermore

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details

More opportunities from New York → Department Of Environmental Protection

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS