Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Site Work and Drainage Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Site Work and Drainage Improvements involves performing site preparation and installing drainage systems for prime contractors on residential projects within the City of Carmel-by-the-Sea. The scope of work includes grading, excavation, and the installation of drainage piping designed to manage runoff and ensure site stability. The contractor must adhere to specific coastal zone drainage standards and regulations associated with the Beach and Riparian Overlay District. The final deliverables consist of completed site grading and a fully functional drainage system in accordance with the project requirements.

General Info

Subcontract for site preparation and drainage installation for residential projects in Carmel-by-the-Sea.

Agency

California → City of Carmel-by-the-Sea

Place of Performance

Carmel-by-the-Sea, CA, 93923

Set-Aside

NONE

Documents

This scope was carved out of DS 25206.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design Study and Coastal Development Permit Application DS 25206 (Diamond)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Carmel-by-the-Sea
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Carmel-by-the-Sea
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site preparation and installs drainage systems for prime contractors on City of Carmel-by-the-Sea residential projects. Executes grading, excavation, and installation of drainage piping to manage runoff and site stability. Must comply with Beach and Riparian (BR) Overlay District regulations and coastal zone drainage standards. Delivers completed site grading and a functional drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange has issued solicitation ITB-26-22-CW for the restoration and reconstruction of the City Center Sport Complex Ballfields. The project involves approximately 8 acres of developed parkland situated on a former municipal landfill. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of buried waste, the installation of a reinforced geotextile membrane, and the subsequent replacement of fill and topsoil. Additionally, the contractor will rebuild the ballfields, parking lot, and associated site improvements. The contract term is 395 days, and the City intends to award the project to the lowest responsive and responsible bidder based solely on the Base Bid. Eligible bidders must be certified General Contractors licensed in the state of Florida. The submission process requires a comprehensive package including a bid bond equal to 5 percent of the total bid, a bonding capacity letter for 100 percent of the bid amount, and various compliance affidavits covering E-Verify, non-collusion, and public entity crimes. Bidders must also provide professional references and a statement of qualifications. Technical specifications mandate that off-site manufactured materials be ISO 9000 certified and that all work adhere to OSHA and Florida Department of Commerce safety regulations. Final acceptance of the project is contingent upon a certified financial inspection by the city and written approval from the Project Architect.
Engineering

POSTED

about 17 hours ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS