Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Site Work and Earthwork

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Site Work and Earthwork involves performing site preparation, grading, and drainage installation for prime contractors on projects managed by the Dormitory Authority of the State of New York. The scope of work includes tree removal, site regrading, and the installation of foundation supports and underdrain systems, utilizing heavy equipment for soil stabilization to ensure a properly graded site. The contract is categorized under NAICS code 238990 and was posted on November 20, 2026, with a response deadline of January 6, 2027. There is no specified set-aside status for this opportunity.

General Info

Subcontract for site work, grading, and drainage for Dormitory Authority of New York.

Documents

This scope was carved out of 2140857.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

OPWDD Broome DDSO Waverly IRA Deck Replacement and Site Improvements and Asbestos and Hazardous Materials Abatement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 47 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom OPWDD Broome DDSO Waverly IRA Deck Replacement and Site Improvements and Asbestos and Hazardous Materials Abatement
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDormitory Authority of the State of New York
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site preparation, grading, and drainage installation for prime contractors on DASNY projects. Executes tree removal, regrading of the site, and installation of underdrains and foundation supports. Utilizes heavy equipment for soil stabilization. Delivers a graded site with installed underdrain system and foundation supports.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a construction effort located at the Main Wastewater Treatment Plant in California. The project has an estimated value between 18.5 million and 19.5 million dollars. The scope of work involves the rehabilitation of open and covered concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, modifications to sluice and slide gates, and the installation of new instrumentation, electrical systems, and motor control center components. Additional tasks include excavation, trench work, surveying of reactors, and the installation of platforms for improved access. The solicitation is issued by Ranger Pipelines Incorporated and is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The project encourages the participation of certified DBE, DVBE, and SBE subcontractors for services such as welding, electrical work, concrete rehabilitation, and coating. All work must comply with applicable state, county, and federal regulations. The response deadline for this solicitation is December 2, 2026.
Ranger Pipelines Incorporated

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details

More opportunities from Dormitory Authority of the State of New York

Same awarding agency

NAICS: 236220
New
SLED
OPWDD Broome DDSO Waverly IRA Deck Replacement and Site Improvements and Asbestos and Hazardous Materials Abatement
Solicitation # 2140857
The Dormitory Authority of the State of New York (DASNY) is soliciting bids from Single Prime General Construction Contractors for deck replacement, site improvements, and asbestos and hazardous materials abatement at 25 Ithaca St, Waverly, NY. The scope of work includes asbestos abatement, demolition of a non-compliant deck and staircase, tree removal, regrading, installing underdrains and foundation supports, repairing the ground floor entrance, repaving the parking lot, installing a new concrete sidewalk, and rerouting electrical conduit and lighting. Work is anticipated to begin in Spring 2027, with a substantial completion date of August 1, 2027, and an estimated base bid cost between $200,000 and $250,000. Bidders must have at least five years of experience in similar work and provide a Minimum Qualifications Form listing five contracts of similar size, scope, and complexity completed within the last ten years. Requirements include compliance with New York State business registration, the submission of a NY State Vendor Responsibility Questionnaire, and the procurement of a Certificate of Authorization to Provide Engineering Services if providing professional engineering services. The project is governed by the General Conditions for Construction dated February 4, 2026. There are no set-aside goals for SDVOB, MBE, or WBE enterprises. All communications during the procurement process must be directed to the Project Manager or the designated email address to avoid disqualification under State Finance Law.
Commercial and Institutional Building Construction

POSTED

about 22 hours ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS