Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Site Work and Earthwork

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

New York, NY, USA

Set-Aside

NONE

Documents

This scope was carved out of 82627B0004.

The full solicitation package (11 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

82627B0004-BEDC OB-144A Total Residual Chlorine Optimization Oakwood Beach WRRF

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew York → Department Of Environmental Protection
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs site preparation and earthwork for prime contractors on NYC DEP water resource recovery facility projects. Executes site clearing, excavation, dewatering, and fill placement. Implements dust, soil erosion, and sediment control measures. Performs asphalt paving and planting for site restoration. Delivers a graded site and restored surfaces.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Environmental Mitigation Professional Services
Solicitation # RFP-2026-017
Zone 7 Water Agency is soliciting proposals under RFP-2026-017 for Environmental Mitigation Professional Services to implement final approved mitigation plans for up to seven projects in eastern Alameda County. These projects address severe storm damages to flood protection channels and require the consultant to provide all labor, materials, and equipment for site preparation, plant protection, and plantings. The scope includes the installation of drip irrigation for projects one through six, hand watering for project seven, and general hand watering for all sites throughout a two-year installation phase. All work must comply with federal and state laws, as well as specific standards approved by the San Francisco Bay Regional Water Quality Control Board, the California Department of Fish and Wildlife, and the State Water Resources Control Board. The contract is intended as an initial three-year agreement from October 2026 to June 2029, with the possibility of two additional one-year extensions at the agency's discretion. Services will be billed on a time-and-materials basis, with invoices submitted monthly and paid within thirty days. Proposals are due by October 27, 2026, via the agency's E-Procurement Portal and must include a technical proposal, a rate sheet, and a cost proposal. Award decisions will be based on a points-based scoring system that heavily weights quality and experience at 70 percent, with the remaining 30 percent split between the general quality of the response and client references. Selected consultants must adhere to strict insurance requirements, Cal/OSHA safety standards, and California prevailing wage laws if applicable.
Integrated Planning

POSTED

about 19 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238910
New
SLED
South Sacramento Sidewalk Gap Closure Tree Removal Project
Solicitation # 41021
The South Sacramento Sidewalk Gap Closure Tree Removal Project, solicitation 41021, is a CUPCCAA project managed by the County of Sacramento Department of Transportation. The contractor is required to provide all labor, materials, and equipment to remove designated trees along Cottonwood Lane and Stevenson Avenue to support new sidewalk construction and infrastructure improvements. The scope includes cutting limbs and trunks to a height of two feet above existing grade, with no stump grinding required. All debris must be legally disposed of, and the contractor is responsible for traffic control, protecting non-designated trees, and restoring any damaged utilities or improvements. To avoid nesting season, tree removal must be completed by January 31st, or otherwise approved by the engineer and surveyed by the Agency if performed after February 1st. The estimated construction cost is 110,000 dollars, with the contract award based on the lowest responsive and responsible base bid. The period of performance is twenty working days, and the project is subject to prevailing wage requirements and specific hourly restrictions near Florin High School. Bidders must provide a bid bond or certified check for at least 10 percent of the bid amount, and the successful awardee must execute performance and payment bonds for 100 percent of the contract price. Evaluation factors include regulatory compliance with California Air Resources Board Advanced Clean Fleets regulations. Bids must be submitted electronically via the Sacramento County Electronic Bidding Portal by October 22, 2026.
County of Sacramento, Community Services Agency, Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 13 days
View Details

More opportunities from New York → Department Of Environmental Protection

Same awarding agency

NAICS: 237110
New
SLED
82627B0004-BEDC OB-144A Total Residual Chlorine Optimization Oakwood Beach WRRF
Solicitation # 82627B0004
The New York City Department of Environmental Protection is soliciting competitive sealed bids for project OB-144A, focusing on Total Residual Chlorine (TRC) Optimization at the Oakwood Beach Wastewater Resource Recovery Facility (WRRF). This construction contract encompasses all structural, mechanical, electrical, and instrumentation work necessary to upgrade existing chlorination facilities. Primary scope activities include modifications to the Landside Chlorine Contact Tank, such as removing old weirs, blocking openings, relocating pass windows, demolishing non-structural walls, and removing the Parshall Flume and influent sluice gate. Technical requirements specify a 460 volt, 3 phase, 60 HZ power supply and strict adherence to manufacturer instructions for equipment installation and testing. The contract will be awarded to the low responsive and responsible bidder, with a pass/fail evaluation based on minimum qualifications and responsibility. Bidders must submit responses via the PASSPort portal by November 18, 2026. The project is subject to New York City Prevailing Wage Rates, the Davis-Bacon Act, and the Build America, Buy America (BABA) Act. Compliance with Disadvantaged Business Enterprise (DBE) utilization plans and strict Environmental, Health and Safety (EHS) standards is required. Performance and payment bonds are mandatory, and financial administration, including progress payments and change order requests, will be managed electronically through the designated system.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS