Site Work & Vault Installation Contractor

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of 2502595.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Paulding County Government
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation and installation for prime contractors on Paulding County Government water system projects. Excavates the site at the Richland Creek WTP, sets the precast vault, ensures proper bedding and leveling, and performs backfilling and compaction. Utilizes excavators, hoisting equipment for precast placement, and compaction equipment. Delivers the installed and backfilled underground vault.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps is soliciting bids for the complete demolition of Building 14, the old security building, and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the removal of the building, septic system, debris, trees, and rocks, followed by backfilling, grading, and seeding the area. Critical utility tasks involve capping sewer lines, disconnecting building power, and replacing a water shut-off valve with straight pipe. The water valve replacement must be completed within a single day between 8:30 AM and 3:00 PM to minimize disruption. Additionally, the contractor must ensure that power and communications remain operational for the guard shack and the mountain pump house and tank, installing new telephone poles as necessary. This is a small business set-aside solicitation under NAICS code 238910. Qualified bidders must maintain an active registration in SAM.gov and provide separate pricing for labor and materials. The project requires strict adherence to Davis-Bacon wage standards and the submission of certified payroll. The contractor is responsible for all necessary permits, traffic control and flaggers on Foothills Drive, and the provision of dumpsters for haul-off, including the submission of chain of responsibility letters for all waste. Responses are due by October 19, 2026.
Keystone Job Corps

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details

More opportunities from Georgia → Paulding County Government

Same awarding agency

NAICS: 237110
New
SLED
27012-3802, Richland Creek WTP Pressure Reducing Valve & Flow Meter Vault
Solicitation # 2502595
Solicitation 2502595, also identified as Client Project 27012-3802, is a request for a single prime contract for the construction of a new pressure reducing valve (PRV) and flow meter (FM) vault at the Richland Creek Water Treatment Plant in Dallas, Georgia. Managed by the Paulding County Water System, the project aims to regulate pressure in plant feed piping and implement flow monitoring. The scope of work includes the installation of an underground precast concrete vault with access hatches and a ladder, the installation of finished water piping and sample lines, and the furnishing of a PRV and FM assembly with isolation and bypass valves. Additionally, the contractor must provide electrical power, grounding, and instrumentation for integration with the existing control system. Bids must be submitted on a lump sum and unit price basis by 10 AM on November 13, 2026, either through the Paulding County Bonfire eProcurement Portal or via sealed envelope to the Paulding County Department of Finance. The contract will be awarded to the lowest responsive and responsible bidder. Submission requirements include a bid security of five percent of the total maximum bid price via certified check or bid bond. The successful awardee must provide performance and payment bonds for one hundred percent of the contract price within fifteen days of the notice of award, issued by a surety company permitted to operate in the State of Georgia.
Water and Sewer Line and Related Structures Construction

POSTED

about 4 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS