Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on February 7, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Site Work for Inclusive Playground at Zorinsky Lake

Closed
CI-2024-0223State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a performance bond, a payment bond, and proof of insurance from companies with an A.M. Best rating of A-VII or better. Compliance with North Carolina Administrative Code regarding Minority and Women-Owned Business requirements is mandatory, requiring the submission of a Good Faith Efforts Form and Table A. Project administration is managed by Willis Engineers on behalf of the City of Belmont, with payments processed via Applications for Payment due 30 days after presentation to the owner. Work must adhere to various industry standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. The project must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is actively seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder, with evaluation factors including bidder qualifications, past project experience, and management plans. Key contractual terms include a 5% retainage on progress payments and liquidated damages of $1,000 per calendar day. Compliance with the Davis-Bacon Act, American Iron and Steel requirements, and OSHA standards is mandatory. The successful bidder must provide performance and payment bonds equal to 100% of the contract amount and file required insurance within 15 days of the award.
WG Construction Co., Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
NAICS: 237110
New
Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Contract K-27-2470-DBB-3-C
Solicitation # K-27-2470-DBB-3-C
Flatiron Dragados Constructors, Inc. is soliciting bids for the Alvarado Trunk Sewer Ph IV and Water Main Relocations Bid Package A, Project No. K-27-2470-DBB-3-C, for the City of San Diego. This CASRF and EPA funded project is located in California and seeks quotes from subcontractors and suppliers for various scopes of work, including aggregate supply, asphalt paving, electrical work, and pipe supply. The solicitation is set aside for SBA certified Women-Owned Small Businesses and encourages Disadvantaged Business Enterprise participation. Bids must be submitted via email or fax to Veronica Garcia by the deadline of December 3, 2026, and must remain valid for 120 days. All participating subcontractors are required to maintain valid California contractor licenses and be registered with the California Department of Industrial Relations per Public Contract Code Section I725.5. The project is subject to a Project Labor Agreement and requires compliance with specific insurance standards. Flatiron Dragados reserves the right to require payment and performance bonds equal to 100 percent of the contract value, with actual bond premium costs reimbursable up to a maximum of 3 percent of the contract value. All bonds must be issued by a surety authorized to operate within the State of California.
Flatiron Dragados Constructors, Inc.

POSTED

about 3 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The City of Omaha is seeking bids from qualified contractors to perform site work for an inclusive playground at Zorinsky Lake. The project involves all work and goods specified in the detailed specifications, with no reserve for SEB (Small and Emerging Business) participation. Bidders are required to submit a bid bond issued by a Nebraska-licensed surety or acceptable substitutes such as certified checks, bank checks, cashier’s checks, lawful U.S. currency, or U.S. government bonds, with the bid bond amount specified in the attributes section. The original bid bond must be delivered within seven days of bid closing to the City Clerk’s office, while a copy must be uploaded with the bid submission. Questions regarding the bid must be submitted through the designated questions tab by February 23, 2024, with responses provided by that date. The deadline for bid responses is February 28, 2024. The project is managed under the solicitation number CI-2024-0223 Addendum 1, and further details can be accessed through the provided online link. This contract is part of the Nebraska Department of Labor’s NAICS code 237110, indicating construction-related services, and is overseen by Douglas County, Nebraska.

General Info

Documents

11
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first1 page · contract-document
High
PDF, High priority: read this firstitb
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this first5 pages · instructions-to-bidders
High
XLSX, High priority: read this first1 page · compliance-form
High
PDF, High priority: read this firstdrawings
High
PDF, Low priority2 pages · affidavit
Low
XLSX, Low priority1 page · certificate-of-compliance
Low
XLSX, Low priority1 page · participation-disclosure-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Douglas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyNebraska → Douglas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Site Work for Inclusive Playground at Zorinsky Lake: City of Omaha is requesting bids from qualified companies, herein called Bidder, Contractor, Vendor, Supplier, or other pronouns used in their place, for all work and/or goods set forth in the specifications.   This bid does not have an SEB reserve.  
Requirement for Bid Bond: The surety company issuing the bid bond should be licensed by the State of Nebraska and listed on the current edition of Circular 570 of the United States Department of the Treasury. Acceptable substitutes for a bid bond: a certified check, an official bank check, a cashier's checks drawn on a national bank or a bank chartered under the laws of the state, payable to City of Omaha, or lawful money of the United States, or a United States Government Bond (negotiable). LETTERS OF CREDIT ARE NOT AN ACCEPTABLE SUBSTITUTE FOR A BID BOND AND WOULD BE CAUSE FOR REJECTION OF BID.
  The bid bond amount is listed in the Attributes section.
  A copy of the bid bond/acceptable substitute shall be uploaded in the Response Attachments section. The original document must be received by the City Clerk, 1819 Farnam Street LC-1, Omaha-Douglas Civic Center, Omaha, NE 68183 within seven (7) calendar days of the closing date and time indicated.
 
QUESTIONS: Bidders must submit bid questions in the Questions tab of the bid event.  Questions will be answered no later than February 23, 2024.  

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS