Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Absher Construction Co. was posted on September 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Skagit Transit Maintenance, Operations and Administration (MOA-2) Facility - Phase 2 & 3

Closed
28385

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia, is a comprehensive interior modernization effort. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully renovating restrooms by replacing vanities and lavatories, and updating doors and life-safety components. Technical upgrades involve installing new raised flooring and electrical distribution to support classroom training, replacing variable air volume (VAV) systems using Automated Logic Corporation components, upgrading lighting controls, and correcting plumbing deficiencies. The project also requires repainting and refinishing interior surfaces and installing new signage throughout the facility. This solicitation is a Total Small Business Set-Aside. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Proposals are evaluated based on three factors of equal importance: past performance, corporate relevant experience, and price. The contract requires the provision of both performance and payment bonds totaling 100 percent of the contract price. Security requirements include background screenings via FBI fingerprint cards and DHS non-disclosure agreements for personnel accessing the site.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price contract for the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work is comprehensive, involving selective demolition, building envelope repairs, new roofing, and exterior wall systems. Interior improvements include reconfiguration, new finishes, updated HVAC systems, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the project requires the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, alongside site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated cost is between $10 million and $25 million, with a completion period of 730 days. The project is divided into two primary pricing line items: building renovation (ELIN 0001) and paving removal and replacement (ELIN 0002). Award will be based on the lowest price. Proposals are due by December 2, 2026, at 2:00 PM. Bonding requirements vary by proposal value, with those exceeding $150,000 requiring a bid bond of 20%, a payment bond, and a performance bond. The contract is subject to the Davis-Bacon Act and requires compliance with ADA accessibility guidelines and FAR 52.246-12 for quality control. There is no specified set-aside status for this solicitation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, solicitation N4425527RB007, is an 8(a) Multiple Award Construction Contract (MACC) for the repair of fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at Naval Base Kitsap in Bremerton, Washington. The scope of work includes producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials and labor. Key technical objectives include addressing Risk Assessment Code Level 4 (RAC-4) deficiencies by extending fire sprinklers to the loading dock platform, securing and monitoring sprinkler control valves in basement elevator pits, and installing missing backflow preventers on the north and south 6-inch wet pipe sprinkler system risers. The project is a Firm-Fixed-Price award with an estimated value between $1 million and $5 million, featuring a period of performance of 440 days from the award of the task order. Proposals are due by December 2, 2026, via the PIEE portal, and will be evaluated based on price and MACC past performance. The contractor must adhere to EM 385-1-1 safety standards, maintain CMMC Level 1 cybersecurity status, and comply with limitations on subcontracting, ensuring no more than 85 percent of the government payment is paid to non-similarly situated entities. Final acceptance is contingent upon performance verification testing and the submission of test reports certified by the Designer of Record.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 9 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a Firm-Fixed-Price design-build project for the renovation and modernization of Transfer Facility #6594 at Naval Base Kitsap Bangor, Washington. The project is divided into two critical phases, requiring the facility to remain operational and mission-capable throughout. Phase 1 encompasses all work not included in Phase 2, including the completion and approval of design documents for both phases. Phase 2 focuses on the installation of new building equipment, including the replacement of a 40-ton bridge crane and the installation of a prefabricated paint booth in the High Bay area. The scope also includes a 400 sq ft addition for forklift battery charging, HVAC, fire protection, and electrical upgrades. The estimated magnitude of construction is between $10 million and $25 million. The project mandates strict adherence to USACE EM 385-1-1 safety standards, UFC codes, and cybersecurity requirements, including CMMC Level 1 Self-certification. Performance is tracked via a Network Analysis Schedule, with the base bid (CLIN 0001) due for completion within 360 calendar days of award and an option (CLIN 0002) within 1082 calendar days. Award is based on price and MACC past performance. Proposals must be submitted via the PIEE portal, and the contract requires various bonds, including bid, performance, and payment bonds. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
Roof Replacement Mandatory Site Visit: 12/03/2026 @ 11 AM
Solicitation # 26-144
This solicitation, number 26-144, is for a full roof replacement of the 1963 LBJ Dorm at the Atterbury Job Corps Center in Edinburgh, Indiana, to address persistent leaks caused by storm and wind damage. The project is a small business set-aside, open to SBA certified Veteran Owned Small Businesses, Service-Disabled Veteran Owned Small Businesses, Women-Owned Small Businesses, and HUBZone Small Businesses. Interested contractors must attend a mandatory site visit on December 3, 2026, and submit a single lump sum bid by December 14, 2026. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The contractor must be licensed by local authorities and comply with EPA, OSHA, and national building codes, with Indiana regulations prevailing if more stringent. Key deliverables include a sequenced construction schedule due within 10 days of the Notice to Proceed, a one-year workmanship guarantee, and a two-year manufacturer's product warranty. Performance must begin within 14 days of the Notice to Proceed. Payment terms are Net 30, and the contractor must provide proof of automobile liability and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Final payment is contingent upon the delivery of a completed SF 1413, certified payroll records, and a release of liens.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
This project involves the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The scope includes a 12,920 SF multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 covers a 17,978 SF laboratory facility and the demolition of Building 1272T. The project encompasses comprehensive site improvements, including underground stormwater retention, mechanical and electrical utilities, telecommunications, landscaping, drainage, parking, and exterior lighting. The solicitation is issued by J&J Contractors, Inc. and is set aside for Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran Owned Small Business (VOSB), and Service-Disabled Veteran-Owned Small Business. Pricing is requested for various trades, including demolition, abatement, concrete, structural steel, mechanical, electrical, and plumbing. The project is exempt from sales tax and adheres to Davis Bacon Wage Rates. Interested parties should contact Rahul Maheshwari for bid invitations and documents via Building Connected.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
This project involves the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The contractor is required to install new fire-rated doors while reusing existing push bars and closure systems. All work must comply with EPA and OSHA regulations, as well as local, state, and federal building codes, with Indiana regulations prevailing if they are more stringent. The contract is a single lump sum award based on best value, where evaluation factors include price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The solicitation is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by December 11, 2026, and a mandatory bid conference is scheduled for December 1, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, proof of a valid Indiana Contractor's License, and insurance certificates naming Adams and Associates, Inc. as an additional insured. Upon award, work must commence within 14 days, and a sequenced construction schedule must be provided within 10 days of the Notice to Proceed. The contractor must provide a one-year guarantee of workmanship and manufacturer's product warranties starting from the date of substantial completion. Payment terms are Net 30. Compliance with FAR 52.222-41(g) regarding minimum wage notifications and Davis Bacon Act wage rate decisions is mandatory.
Atterbury Job Corps – Adams & Associates

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 236220
New
SLED
Navarre Pier Restrooms
Solicitation # 27-003
The Navarre Pier Restrooms project, solicitation ITB 27-003, is a construction contract for Santa Rosa County, Florida, managed by the Environmental and Public Works department. The scope of work involves the demolition of an existing restroom facility, including the pedestrian ramp and stairs, and the construction of a new coastal restroom pavilion featuring east and west restrooms. The project will provide 1,420 square feet of space under roof for public restrooms and storage, utilizing wood framing on concrete and wood pilings. Key deliverables include record drawings, specifications, product data, and operation and maintenance manuals. Performance milestones include the completion of the pier restroom, structural repairs, and the demolition and replacement of the east and west stairs and pedestrian ramp. The contract requires a bid security of five percent of the base bid via certified check or bid bond, with performance and payment bonds required if the contract exceeds $200,000. Contractors must provide a quality-control plan and job mock-ups for approval by the owner and consultant. The project adheres to strict packaging and marking standards, including factory grade stamps for lumber and permanent nameplates for equipment. Bidders must certify they are not listed on scrutinized companies lists regarding boycotts of Israel or activities in Sudan, Iran, Cuba, or Syria. All submissions must be provided in searchable PDF format via the Santa Rosa County e-Procurement Portal. There is no specified set-aside status for this solicitation.
Environmental

POSTED

about 21 hours ago

DEADLINE

in 29 days

AI Contract Overview

Show more

The Skagit Transit Maintenance, Operations and Administration (MOA-2) Facility project located in Burlington, Washington, involves the completion of phases 2 and 3 of a facility upgrade. Phase 2 focuses on the interior renovation of a 67,850 square foot warehouse, including the addition of offices, conference rooms, storage, and maintenance bays. Phase 3 entails the construction of a new bus wash facility and fuel island on an adjacent lot, along with comprehensive site work including parking, fencing, stormwater drainage, and electrical infrastructure. Bids are due by November 6, 2026, with a Notice of Intent to Award expected by November 12, 2026, and a Notice to Proceed scheduled for December 4, 2026. Substantial completion is targeted for September 1, 2028, with final completion in February 2029. This project is subject to the Build America, Buy America Act and requires adherence to the higher of either Washington State L&I or federal Davis-Bacon prevailing wage rates.

General Info

Skagit Transit facility upgrades in Burlington, Washington, completing phases 2 and 3.

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 25 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAbsher Construction Co.
Contacts1 person available
OfficeN/A

Full Description

Show more
Project Location: 11784 Bay Ridge Dr, Burlington, WA 98233 Bid Date/Time: November 6, 2026 @ 2:00 pm PST Site Visit: Wednesday, October 7, 2026 @ 10:00 am @ the project site Virtual Pre-bid Meeting: October 13, 2026 @ 10:00 am via Teams. Please see Addendum 1 for the Teams meeting link. Pertinent Project Dates: Owner Notice of Intent to Award to GC: 11/12/26 Owner Award to GC: 11/20/26 NTP: 12/4/26 Substantial Completion: 9/1/28 Final Completion: Feb 2029 Phasing: This project includes 3 distinct work phases: Preconstruction Phase 2: Renovation of Existing Building A, including associated interior and exterior work and utility modifications serving Building A. Phase 3: New Bush Wash Facility and Fuel Island (Building B) and related site work. Project Description: Includes the completion of phases 2 and 3 of the project. Phase 2 includes interior renovation of the existing 67,850 sqft warehouse (Bldg A). Also includes construction of offices, conference rooms, break rooms, inventory and file storage areas, restrooms, showers and lockers, maint and ops command center, and the maint and facilities areas, including light and heavy-duty maint bays, and bldg utilities serving this facility. Phase 3 includes construction of the ancillary maintenance building/bus wash (Bldg B) on the adjacent North lot and all site work required across all lots. Activities include construction of Bldg B bus wash with fueling stations, construction of parking layout and fencing, utilities, and power, stormwater runoff drainage, electrical, lighting TI infrastructure, security, functional landscaping and electrical transformers, and fuel storage. Build America, Buy America Act (BABAA): This project is subject to Build America, Buy America Act requirements. Please reference the specifications for additional information. Wage Rates: This project is subject to WA State L&I prevailing wage rates AND federal Davis-Bacon wage rates. You must pay the higher of the two. Union Information: Absher Construction is a signatory to the Carpenters and Laborers Unions. Project Documents: Available via Absher's BuildingConnected online planroom: https://app.buildingconnected.com/public/5460ff8bdf2f0e07006b591d/projec... OR via Skagit Transit's online bid portal: https://www.beaconbid.com/solicitations/skagit-transit/edd0756c-ef0b-4ca...

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS