Y--SLATE CREEK SECTION 22 WATER WELL

Awarded
140L4326Q0095Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the drilling, construction, and development of a single water well at Slate Creek Section 22 in the High Desert District, under a firm fixed-price construction purchase order issued under simplified acquisition procedures by the Bureau of Land Management, Oregon State Office, part of the Department of the Interior. The solicitation, numbered 140L4326Q0095, is a Small Business Set Aside with a NAICS code of 237110 for water well drilling, and responses must be submitted electronically by 5:00 PM local time on August 21, 2026, to Matthew Duane at matthew_duane@ios.doi.gov. The performance period is strictly defined from September 1, 2026, to December 31, 2026, with work to begin within 10 calendar days of the notice to proceed and completed within 120 calendar days. The scope includes pilot hole drilling (minimum 5-inch diameter), reaming to a 9.5-inch final bore, installation of 5-inch SDR17 PVC casing and slotted casing, gravel packing, bentonite sealing, surface grouting, well development, and comprehensive well testing, including final yield and water quality analyses. All materials must meet or exceed the State of Wyoming Minimum Well Construction Standards and comply with numerous industry specifications including ASTM, AWWA, OSHA, and ACI standards, with PVC casing requiring NSF-WC certification and specific labeling of diameter, material type, standard number, SDR, and U.S. manufacturer. The contract incorporates over 50 FAR clauses governing labor standards, compliance, safety, payment, testing, warranties, and dispute resolution, including strict adherence to Davis-Bacon Act wage requirements under 52.222-6 and 52.222-13, with truck driver coverage limited to time spent on-site or between the site and a nearby dedicated facility. Contractors must submit certified payrolls, compliance statements, and an insurance certificate to jeduncan@ios.doi.gov before work begins, and must provide executed Standard Forms 25 and 25-A for payment protection. All work is subject to inspections by the Contracting Officer’s Representative, with the superintendent required to be present during final inspection, and the contractor must provide written notification at least three working days prior to completion. Documentation including final well logs, pumping test results, and

General Info

Small business set-aside for water well construction at Slate Creek Section 22, deadline August 22, 2026.

Agency

Department Of The Interior → Oregon State OfficeView Agency

Contract Value

$94,890

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

OR

Set-Aside

NONE

Awardee

ATNIP WELL & PUMP SERVICEView Profile

Award Issued Date

Documents

(2)

Amendment 0001 to Solicitation 140L4326Q0095

PDFamendment

Solicitation 140L4326Q0095 Slate Creek Water Well Construction

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Oregon State Office
Contacts1 person available
OfficePORTLAND, OR, 97204, USA
Organization / Agency
Department Of The Interior → Oregon State Office
View Agency Profile
Office AddressPORTLAND, OR, 97204, USA

Full Description

Show more
SLATE CREEK SECTION 22 WATER WELL

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements project in Kerman, California. This comprehensive redesign project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. The scope of work further extends to the installation of a sludge dewatering and wasting pipeline with a trailer-mounted pump system and the construction of two soil cement lined sludge dewatering ponds. Additional requirements include a reinforced concrete pad for an emergency generator, a new CMU operations and electrical building equipped with HVAC and plumbing, and a facility-wide PLC/SCADA monitoring system. Miscellaneous civil improvements such as asphalt resurfacing, grading, and piping are also required. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned enterprises, with a response deadline of October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various contractor and Metropolitan-furnished valves, 54-inch and 145.5-inch diameter tie-ins, four surge tanks, two valve vaults, and an air compressor yard structure. Additional requirements include drainage improvements, electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation, posted on September 22, 2026, has a response deadline of September 29, 2026. It is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The prime contractor, James W. Fowler Co., is actively seeking subcontractor pricing and encourages the participation of M/W/DBE firms, offering assistance with equipment, supplies, bonding, and insurance to maximize their involvement. The project also encourages the use of apprentices and requires quality control testing. All work must be performed according to the plans and specifications provided on the contractor's website.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of The Interior → Oregon State Office

Same awarding agency

NAICS: 237310
Federal
RDO_TIOGA BRIDGE REHABILITATION
Solicitation # 140L4326Q0120
Solicitation 140L4326Q0120 is a Firm Fixed Price construction contract issued by the Department of the Interior's Bureau of Land Management for the rehabilitation of the Tioga Pedestrian Bridge in Roseburg, Oregon. The project focuses on extending the service life and structural integrity of the timber superstructure through surface preparation and the application of preservative treatments. Specifically, timber members accessible to the public will be treated with a linseed oil and pine tar mixture, while non-public contact members will be treated with copper naphthenate. To protect surrounding natural resources during the chemical application, the contractor is required to implement full environmental containment and adhere to a Spill Prevention Control and Countermeasure plan. The contract mandates a performance period of 75 calendar days, with work commencing within ten days of the notice to proceed. Award is based on the best value, requiring offerors to be found technically acceptable based on relevant experience before price is considered. Key administrative requirements include the submission of performance and payment bonds, compliance with domestic construction material laws, and electronic invoicing through the Invoice Processing Platform System. All equipment must be power washed and inspected by the Contracting Officer's Representative prior to mobilization on BLM lands. Proposals must be submitted electronically by October 15, 2026.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS